River Danube River Regime for Sotina from 1321 rkm to 1325 rkm (Q2734688): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
||||||||||||||
label / it | label / it | ||||||||||||||
Organizzare il corso d'acqua sul Danubio vicino a Sotina da 1321 rkm a 1325 rkm | |||||||||||||||
Property / summary | |||||||||||||||
Il progetto si trova nella Repubblica di Croazia, nella contea di Vukovar-Srijem, insediamento di Sotin, e si riferisce alla sistemazione della via navigabile sul fiume Danubio da 1321 a 1325 rkm. L'obiettivo del progetto è quello di aumentare il livello di sicurezza della navigazione sulla parte oggetto del fiume Danubio attraverso la costruzione di tre strutture idriche, 2 cosiddette "peras" e 1 "edificio a lunga distanza". Allo stesso tempo, il progetto ridurrà le tendenze morfologiche negative sulla riva destra di questo tratto del Danubio, vale a dire il processo di erosione a circa 1322 rkm. nei pressi di Sotin, dove questi processi hanno un impatto diretto sul crollo della costa e sull'espansione del letto del fiume, che riduce la profondità del corso d'acqua.Il valore totale dei costi ammissibili del progetto è di 43 597 955,03 HRK.I costi totali del progetto includono l'IVA come costo accettabile. (Italian) | |||||||||||||||
Property / summary: Il progetto si trova nella Repubblica di Croazia, nella contea di Vukovar-Srijem, insediamento di Sotin, e si riferisce alla sistemazione della via navigabile sul fiume Danubio da 1321 a 1325 rkm. L'obiettivo del progetto è quello di aumentare il livello di sicurezza della navigazione sulla parte oggetto del fiume Danubio attraverso la costruzione di tre strutture idriche, 2 cosiddette "peras" e 1 "edificio a lunga distanza". Allo stesso tempo, il progetto ridurrà le tendenze morfologiche negative sulla riva destra di questo tratto del Danubio, vale a dire il processo di erosione a circa 1322 rkm. nei pressi di Sotin, dove questi processi hanno un impatto diretto sul crollo della costa e sull'espansione del letto del fiume, che riduce la profondità del corso d'acqua.Il valore totale dei costi ammissibili del progetto è di 43 597 955,03 HRK.I costi totali del progetto includono l'IVA come costo accettabile. (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Il progetto si trova nella Repubblica di Croazia, nella contea di Vukovar-Srijem, insediamento di Sotin, e si riferisce alla sistemazione della via navigabile sul fiume Danubio da 1321 a 1325 rkm. L'obiettivo del progetto è quello di aumentare il livello di sicurezza della navigazione sulla parte oggetto del fiume Danubio attraverso la costruzione di tre strutture idriche, 2 cosiddette "peras" e 1 "edificio a lunga distanza". Allo stesso tempo, il progetto ridurrà le tendenze morfologiche negative sulla riva destra di questo tratto del Danubio, vale a dire il processo di erosione a circa 1322 rkm. nei pressi di Sotin, dove questi processi hanno un impatto diretto sul crollo della costa e sull'espansione del letto del fiume, che riduce la profondità del corso d'acqua.Il valore totale dei costi ammissibili del progetto è di 43 597 955,03 HRK.I costi totali del progetto includono l'IVA come costo accettabile. (Italian) / qualifier | |||||||||||||||
point in time: 11 January 2022
|
Revision as of 13:39, 11 January 2022
Project Q2734688 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | River Danube River Regime for Sotina from 1321 rkm to 1325 rkm |
Project Q2734688 in Croatia |
Statements
37,058,261.77 Croatian kuna
0 references
43,597,955.03 Croatian kuna
0 references
85.0 percent
0 references
1 October 2020
0 references
31 December 2023
0 references
Ministarstvo mora, prometa i infrastrukture
0 references
10000
0 references
Projekt se nalazi u RH, Vukovarsko-srijemska županija, naselje Sotin, a odnosi se na uređenje vodnog puta na rijeci Dunav od 1321 do 1325 rkm.Cilj projekta je povećanje stupnja sigurnosti plovidbe na predmetnoj dionici rijeke Dunav putem izgradnje tri vodne građevine, 2 tzv. “pera” i 1 “uzdužne građevine”. Ujedno, projektom će se umanjiti negativni morfološki trendovi na desnoj obali ove dionice Dunava, konkretno proces erozije na približno 1322 rkm. kod mjesta Sotin gdje ti procesi imaju direktan utjecaj na urušavanje obale te širenje riječnog korita čime se smanjuje dubina plovnog puta.Ukupna vrijednost prihvatljivih troškova projekta iznosi 43.597.955,03 HRK.Ukupni troškovi Projekta sadrže i PDV kao prihvatljiv trošak. (Croatian)
0 references
The project is located in Croatia, Vukovar-Srijem County, Soentin settlement, relating to the river basin management in the Danube River from 1321 to 1325. the project aims to increase the degree of safety of navigation on the stretch concerned by the Danube River in the form of the construction of three water buildings, 2 so called ‘pen nibs’ and 1 ‘longitudinal buildings’. At the same time, the project will reduce negative morphological trends on the right coast of this section of Danube, namely the erosion of approximately 1322 k.m. at Sotin sites where these processes have a direct effect on the collapse of the coast and the expansion of the river bed, reducing the depth of the craft. the total cost of the Project is also included in VAT as an eligible cost. (English)
3 June 2021
0 references
Le projet est situé dans la République de Croatie, dans le comté de Vukovar-Srijem, colonie de Sotin, et fait référence à l’aménagement de la voie navigable sur le Danube de 1321 à 1325 rkm.L’objectif du projet est d’accroître le niveau de sécurité de la navigation sur la partie du Danube en question par la construction de trois structures d’eau, 2 dits «peras» et 1 «bâtiments à longue distance». Dans le même temps, le projet réduira les tendances morphologiques négatives sur la rive droite de ce tronçon du Danube, à savoir le processus d’érosion à environ 1 322 km. près de Sotin, où ces processus ont un impact direct sur l’effondrement de la côte et l’expansion du lit du fleuve, ce qui réduit la profondeur de la voie navigable.La valeur totale des coûts éligibles du projet est de 43 597 955.03.HRK.Les coûts totaux du projet incluent la TVA comme coût acceptable. (French)
29 November 2021
0 references
Das Projekt befindet sich in der Republik Kroatien, Gespanschaft Vukovar-Srijem, Sotin Siedlung, und bezieht sich auf die Anordnung der Wasserstraße auf der Donau von 1321 bis 1325 rkm.Ziel des Projekts ist es, das Niveau der Sicherheit der Schifffahrt auf dem betreffenden Teil der Donau durch den Bau von drei Wasserstrukturen, 2 sogenannte „peras“ und 1 „Langstreckengebäude“ zu erhöhen. Gleichzeitig wird das Projekt negative morphologische Trends am rechten Ufer dieses Abschnitts der Donau verringern, nämlich den Erosionsprozeß auf ca. 1322 rkm in der Nähe von Sotin, wo sich diese Prozesse direkt auf den Zusammenbruch der Küste und die Erweiterung des Flussbetts auswirken, was die Tiefe der Wasserstraße verringert.Der Gesamtwert der förderfähigen Kosten des Projekts beträgt HRK 43 597 955.03.Die Gesamtkosten des Projekts umfassen die Mehrwertsteuer als akzeptable Kosten. (German)
29 November 2021
0 references
Het project is gelegen in de Republiek Kroatië, provincie Vukovar-Srijem, Sotin, en verwijst naar de indeling van de waterweg op de Donau van 1321 tot 1325 rkm. Het doel van het project is het verhogen van het niveau van veiligheid van de scheepvaart op het gebied van de Donau door de bouw van drie waterstructuren, 2 zogenaamde „peras” en 1 „langeafstandsgebouwen”. Tegelijkertijd zal het project negatieve morfologische trends op de rechteroever van dit deel van de Donau verminderen, namelijk het erosieproces tot ongeveer 1322 rkm. Bij Sotin, waar deze processen een directe impact hebben op de ineenstorting van de kust en de uitbreiding van de rivierbedding, waardoor de diepte van de waterweg afneemt.De totale waarde van de subsidiabele kosten van het project bedraagt 43 597 955.03 HRK.De totale kosten van het project omvatten btw als aanvaardbare kosten. (Dutch)
4 December 2021
0 references
Il progetto si trova nella Repubblica di Croazia, nella contea di Vukovar-Srijem, insediamento di Sotin, e si riferisce alla sistemazione della via navigabile sul fiume Danubio da 1321 a 1325 rkm. L'obiettivo del progetto è quello di aumentare il livello di sicurezza della navigazione sulla parte oggetto del fiume Danubio attraverso la costruzione di tre strutture idriche, 2 cosiddette "peras" e 1 "edificio a lunga distanza". Allo stesso tempo, il progetto ridurrà le tendenze morfologiche negative sulla riva destra di questo tratto del Danubio, vale a dire il processo di erosione a circa 1322 rkm. nei pressi di Sotin, dove questi processi hanno un impatto diretto sul crollo della costa e sull'espansione del letto del fiume, che riduce la profondità del corso d'acqua.Il valore totale dei costi ammissibili del progetto è di 43 597 955,03 HRK.I costi totali del progetto includono l'IVA come costo accettabile. (Italian)
11 January 2022
0 references
Identifiers
KK.07.3.1.04.0001
0 references