Reducing primary energy consumption by promoting energy efficiency in Kubulu preschool “Ieviņa” (Q3057172): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Het doel van het project is het verminderen van het primaire energieverbruik door maatregelen ter verbetering van de energie-efficiëntie in de voorschoolse onderwijsinstelling „IEVIаA”. In het gebouw van de onderwijsinstelling is het de bedoeling om isolatiewerkzaamheden uit te voeren, vervanging van kamerverlichting, defecte ramen en deuren, reconstructie van het verwarmingssysteem en installatie van een nieuw bliksembeveiligingssysteem. Deze a...)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Riduzione del consumo di energia primaria attraverso la promozione dell'efficienza energetica presso l'istituto di istruzione prescolastica "IEVI‑A"
Property / summary
 
L'obiettivo del progetto è quello di ridurre il consumo di energia primaria attraverso l'attuazione di misure di miglioramento dell'efficienza energetica nell'istituto di istruzione prescolastica "IEVI-A". Nella costruzione dell'istituzione educativa è previsto per effettuare lavori di isolamento, sostituzione di illuminazione camera, finestre e porte difettose, ricostruzione del sistema di riscaldamento e installazione di un nuovo sistema di protezione contro i fulmini. Queste attività ridurranno il consumo di energia primaria di 166,88 kWh/m² all'anno e ridurranno le emissioni di CO2 nell'atmosfera di 39,98 tonnellate all'anno. Il costo totale del progetto è di 216 170,42 EUR. Di cui 159 338 EUR sono finanziati dal FESR e 8 435,54 EUR costituiscono aiuti di Stato. Il restante importo di 51 532,48 EUR consiste nel cofinanziamento da parte del comune del comune di Balvi di 19 682,93 EUR e in spese non ammissibili pari a 28 713,95 EUR. I lavori di costruzione previsti per il progetto hanno inizio nel luglio 2018 e saranno completati nel maggio 2019. (Italian)
Property / summary: L'obiettivo del progetto è quello di ridurre il consumo di energia primaria attraverso l'attuazione di misure di miglioramento dell'efficienza energetica nell'istituto di istruzione prescolastica "IEVI-A". Nella costruzione dell'istituzione educativa è previsto per effettuare lavori di isolamento, sostituzione di illuminazione camera, finestre e porte difettose, ricostruzione del sistema di riscaldamento e installazione di un nuovo sistema di protezione contro i fulmini. Queste attività ridurranno il consumo di energia primaria di 166,88 kWh/m² all'anno e ridurranno le emissioni di CO2 nell'atmosfera di 39,98 tonnellate all'anno. Il costo totale del progetto è di 216 170,42 EUR. Di cui 159 338 EUR sono finanziati dal FESR e 8 435,54 EUR costituiscono aiuti di Stato. Il restante importo di 51 532,48 EUR consiste nel cofinanziamento da parte del comune del comune di Balvi di 19 682,93 EUR e in spese non ammissibili pari a 28 713,95 EUR. I lavori di costruzione previsti per il progetto hanno inizio nel luglio 2018 e saranno completati nel maggio 2019. (Italian) / rank
 
Normal rank
Property / summary: L'obiettivo del progetto è quello di ridurre il consumo di energia primaria attraverso l'attuazione di misure di miglioramento dell'efficienza energetica nell'istituto di istruzione prescolastica "IEVI-A". Nella costruzione dell'istituzione educativa è previsto per effettuare lavori di isolamento, sostituzione di illuminazione camera, finestre e porte difettose, ricostruzione del sistema di riscaldamento e installazione di un nuovo sistema di protezione contro i fulmini. Queste attività ridurranno il consumo di energia primaria di 166,88 kWh/m² all'anno e ridurranno le emissioni di CO2 nell'atmosfera di 39,98 tonnellate all'anno. Il costo totale del progetto è di 216 170,42 EUR. Di cui 159 338 EUR sono finanziati dal FESR e 8 435,54 EUR costituiscono aiuti di Stato. Il restante importo di 51 532,48 EUR consiste nel cofinanziamento da parte del comune del comune di Balvi di 19 682,93 EUR e in spese non ammissibili pari a 28 713,95 EUR. I lavori di costruzione previsti per il progetto hanno inizio nel luglio 2018 e saranno completati nel maggio 2019. (Italian) / qualifier
 
point in time: 11 January 2022
Timestamp+2022-01-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:05, 11 January 2022

Project Q3057172 in Latvia
Language Label Description Also known as
English
Reducing primary energy consumption by promoting energy efficiency in Kubulu preschool “Ieviņa”
Project Q3057172 in Latvia

    Statements

    0 references
    0 references
    159,338.0 Euro
    0 references
    187,456.47 Euro
    0 references
    85.0 percent
    0 references
    18 June 2018
    0 references
    17 June 2019
    0 references
    Balvu novada pašvaldība
    0 references
    0 references

    57°9'35.53"N, 27°12'0.54"E
    0 references
    Projekta mērķis ir samazināt primārās enerģijas patēriņu, veicot energoefektivitātes paaugstināšanas pasākumus pirmsskolas izglītības iestādē “Ieviņa”. Izglītības iestādes ēkā plānots veikt tās siltināšanas darbus, telpu apgaismojuma, defektīvo logu un durvju nomaiņu, apkures sistēmas rekonstrukciju un jaunas zibensaizsardzības sistēmas uzstādīšanu. Īstenojot minētās aktivitātes, tiks samazināts primārās enerģijas patēriņš par 166.88 kWh/m2 gadā un samazināsies CO2 emisijas apjoms atmosfērā par 39.98 tonnām gadā.Projekta kopējās izmaksas ir EUR 216170,42. EUR 159338 no tām ir ERAF finansējums un EUR 8435.54 ir Valsts atbalsts. Pārējo summu - EUR 51532,48 veido Balvu novada pašvaldības līdzfinansējums - EUR 19 682.93 un neattiecināmās izmaksas - EUR 28 713.95. Projektā paredzētos būvdarbus plānots uzsākt 2018.gada jūlijā un pabeigt 2019.gada maijā. (Latvian)
    0 references
    The aim of the project is to reduce primary energy consumption by implementing energy efficiency improvement measures in the preschool educational establishment “Ieviņa”. It is planned to perform insulation works in the building of educational institutions, replacement of room lighting, defective windows and doors, reconstruction of heating system and installation of new lightning protection system. These activities will reduce primary energy consumption by 166.88 kWh/m² per year and reduce the amount of CO2 emissions to the atmosphere by 39.98 tonnes per year. EUR 159338 of which is ERDF funding and EUR 8435.54 is State support. The remaining amount – EUR 51532.48 consists of co-financing by Balvi Municipality – EUR 19 682.93 and ineligible costs – EUR 28 713.95. The construction works envisaged in the project are planned to be started in July 2018 and completed in May 2019. (English)
    15 July 2021
    0 references
    L’objectif du projet est de réduire la consommation d’énergie primaire en mettant en œuvre des mesures d’amélioration de l’efficacité énergétique dans l’établissement d’enseignement préscolaire «IEVI’A». Dans la construction de l’établissement d’enseignement, il est prévu d’effectuer des travaux d’isolation, le remplacement de l’éclairage des locaux, des fenêtres et des portes défectueuses, la reconstruction du système de chauffage et l’installation d’un nouveau système de protection contre la foudre. Ces activités permettront de réduire la consommation d’énergie primaire de 166,88 kWh/m² par an et de réduire les émissions de CO2 dans l’atmosphère de 39,98 tonnes par an.Le coût total du projet s’élève à 216 170,42 EUR. Dont 159 338 EUR sont financés par le FEDER et 8 435,54 EUR constituent des aides d’État. Le montant restant de 51 532,48 EUR se compose d’un cofinancement par la municipalité de la municipalité de Balvi de 19 682,93 EUR et de coûts inéligibles de 28 713,95 EUR. Les travaux de construction prévus pour le projet devraient débuter en juillet 2018 et s’achever en mai 2019. (French)
    25 November 2021
    0 references
    Ziel des Projekts ist es, den Primärenergieverbrauch durch die Umsetzung von Maßnahmen zur Verbesserung der Energieeffizienz in der vorschulischen Bildungseinrichtung „IEVIÅA“ zu senken. Im Gebäude der Bildungseinrichtung ist es geplant, Isolierarbeiten durchzuführen, den Austausch der Raumbeleuchtung, defekte Fenster und Türen, die Rekonstruktion des Heizsystems und die Installation eines neuen Blitzschutzsystems. Diese Tätigkeiten werden den Primärenergieverbrauch um 166,88 kWh/m² pro Jahr senken und die CO2-Emissionen in die Atmosphäre um 39,98 Tonnen pro Jahr senken.Die Gesamtkosten des Projekts betragen 216 170,42 EUR. Davon sind 159 338 EUR aus dem EFRE und 8 435,54 EUR staatliche Beihilfen. Der Restbetrag von 51 532,48 EUR besteht aus einer Kofinanzierung durch die Gemeinde Balvi in Höhe von 19 682,93 EUR und nicht förderfähigen Kosten in Höhe von 287 713,95 EUR. Die für das Projekt geplanten Bauarbeiten sollen im Juli 2018 beginnen und im Mai 2019 abgeschlossen sein. (German)
    28 November 2021
    0 references
    Het doel van het project is het verminderen van het primaire energieverbruik door maatregelen ter verbetering van de energie-efficiëntie in de voorschoolse onderwijsinstelling „IEVIаA”. In het gebouw van de onderwijsinstelling is het de bedoeling om isolatiewerkzaamheden uit te voeren, vervanging van kamerverlichting, defecte ramen en deuren, reconstructie van het verwarmingssysteem en installatie van een nieuw bliksembeveiligingssysteem. Deze activiteiten verminderen het primaire energieverbruik met 166,88 kWh/m² per jaar en verminderen de CO2-uitstoot in de atmosfeer met 39,98 ton per jaar. De totale kosten van het project bedragen 216 170,42 EUR. Waarvan 159 338 EUR uit het EFRO wordt gefinancierd en 8 435,54 EUR staatssteun vormt. Het resterende bedrag van 51 532,48 EUR bestaat uit medefinanciering door de gemeente Balvi van 19 682,93 EUR en niet-subsidiabele kosten van 287 313,95 EUR. De voor het project geplande bouwwerkzaamheden zullen naar verwachting in juli 2018 van start gaan en in mei 2019 worden voltooid. (Dutch)
    28 November 2021
    0 references
    L'obiettivo del progetto è quello di ridurre il consumo di energia primaria attraverso l'attuazione di misure di miglioramento dell'efficienza energetica nell'istituto di istruzione prescolastica "IEVI-A". Nella costruzione dell'istituzione educativa è previsto per effettuare lavori di isolamento, sostituzione di illuminazione camera, finestre e porte difettose, ricostruzione del sistema di riscaldamento e installazione di un nuovo sistema di protezione contro i fulmini. Queste attività ridurranno il consumo di energia primaria di 166,88 kWh/m² all'anno e ridurranno le emissioni di CO2 nell'atmosfera di 39,98 tonnellate all'anno. Il costo totale del progetto è di 216 170,42 EUR. Di cui 159 338 EUR sono finanziati dal FESR e 8 435,54 EUR costituiscono aiuti di Stato. Il restante importo di 51 532,48 EUR consiste nel cofinanziamento da parte del comune del comune di Balvi di 19 682,93 EUR e in spese non ammissibili pari a 28 713,95 EUR. I lavori di costruzione previsti per il progetto hanno inizio nel luglio 2018 e saranno completati nel maggio 2019. (Italian)
    11 January 2022
    0 references
    Balvu iela 6, Kubuli, Kubulu pag., Balvu nov., LV-4566
    0 references

    Identifiers

    4.2.2.0/17/I/091
    0 references