122_NURACHI_431_ENERGY PERFORMANCE OF THE MUNICIPALITY’S PREMISES AND CONSTRUCTION OF A MICRO NETWORK BETWEEN BUILDINGS (Q2155174): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
label / delabel / de
 
122_NURACHI_431_EFFICIENCY DER RÄUMLICHKEITEN DES RATHAUSES UND BAU EINES MIKRONETZES ZWISCHEN GEBÄUDEN
Property / summary
 
MIT DER VORGESCHLAGENEN MASSNAHME BEABSICHTIGT DIE GEMEINDEVERWALTUNG IN UMSETZUNG DES DERZEITIGEN SEAP, MASSNAHMEN ZUR ANPASSUNG DER ÖFFENTLICHEN STRUKTUREN AN DIE GELTENDEN RECHTSVORSCHRIFTEN ÜBER DEN ENERGIEVERBRAUCH UND ZUR UMSETZUNG DER RICHTLINIEN DES KYOTO-PROTOKOLLS EINZULEITEN. (German)
Property / summary: MIT DER VORGESCHLAGENEN MASSNAHME BEABSICHTIGT DIE GEMEINDEVERWALTUNG IN UMSETZUNG DES DERZEITIGEN SEAP, MASSNAHMEN ZUR ANPASSUNG DER ÖFFENTLICHEN STRUKTUREN AN DIE GELTENDEN RECHTSVORSCHRIFTEN ÜBER DEN ENERGIEVERBRAUCH UND ZUR UMSETZUNG DER RICHTLINIEN DES KYOTO-PROTOKOLLS EINZULEITEN. (German) / rank
 
Normal rank
Property / summary: MIT DER VORGESCHLAGENEN MASSNAHME BEABSICHTIGT DIE GEMEINDEVERWALTUNG IN UMSETZUNG DES DERZEITIGEN SEAP, MASSNAHMEN ZUR ANPASSUNG DER ÖFFENTLICHEN STRUKTUREN AN DIE GELTENDEN RECHTSVORSCHRIFTEN ÜBER DEN ENERGIEVERBRAUCH UND ZUR UMSETZUNG DER RICHTLINIEN DES KYOTO-PROTOKOLLS EINZULEITEN. (German) / qualifier
 
point in time: 25 December 2021
Timestamp+2021-12-25T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:38, 25 December 2021

Project Q2155174 in Italy
Language Label Description Also known as
English
122_NURACHI_431_ENERGY PERFORMANCE OF THE MUNICIPALITY’S PREMISES AND CONSTRUCTION OF A MICRO NETWORK BETWEEN BUILDINGS
Project Q2155174 in Italy

    Statements

    0 references
    58,888.25 Euro
    0 references
    117,776.5 Euro
    0 references
    50.0 percent
    0 references
    30 November 2017
    0 references
    30 November 2020
    0 references
    COMUNE DI NURACHI
    0 references
    0 references
    0 references

    39°58'24.20"N, 8°32'24.58"E
    0 references
    CON L¿INTERVENTO PROPOSTO L¿AMMINISTRAZIONE COMUNALE, IN ATTUAZIONE DEL PAES VIGENTE, INTENDE AVVIARE GLI INTERVENTI PER L¿ADEGUAMENTO DELLE STRUTTURE PUBBLICHE ALLA NORMATIVA VIGENTE IN MATERIA DI CONSUMO ENERGETICO E IN ATTUAZIONE ALLE DIRETTIVE DEL PROTOCOLLO DI KYOTO (Italian)
    0 references
    WITH THE PROPOSED INTERVENTION OF THE MUNICIPAL ADMINISTRATION, IN IMPLEMENTATION OF THE EXISTING PACES, INTENDS TO START OPERATIONS FOR THE ADAPTATION OF PUBLIC STRUCTURES TO THE EXISTING LEGISLATION ON ENERGY CONSUMPTION AND IN IMPLEMENTATION OF THE KYOTO PROTOCOL DIRECTIVES. (English)
    0 references
    AVEC L’ACTION PROPOSÉE, L’ADMINISTRATION MUNICIPALE A L’INTENTION, DANS LE CADRE DE LA MISE EN ŒUVRE DU PAASE ACTUEL, D’ENGAGER DES MESURES D’ADAPTATION DES STRUCTURES PUBLIQUES À LA LÉGISLATION ACTUELLE SUR LA CONSOMMATION D’ÉNERGIE ET EN APPLICATION DES DIRECTIVES DU PROTOCOLE DE KYOTO. (French)
    23 December 2021
    0 references
    MET DE VOORGESTELDE ACTIE IS HET GEMEENTEBESTUUR, TER UITVOERING VAN HET HUIDIGE SEAP, VOORNEMENS MAATREGELEN TE NEMEN VOOR DE AANPASSING VAN DE OPENBARE STRUCTUREN AAN DE HUIDIGE WETGEVING INZAKE ENERGIEVERBRUIK EN TER UITVOERING VAN DE KYOTO-PROTOCOLRICHTLIJNEN. (Dutch)
    24 December 2021
    0 references
    MIT DER VORGESCHLAGENEN MASSNAHME BEABSICHTIGT DIE GEMEINDEVERWALTUNG IN UMSETZUNG DES DERZEITIGEN SEAP, MASSNAHMEN ZUR ANPASSUNG DER ÖFFENTLICHEN STRUKTUREN AN DIE GELTENDEN RECHTSVORSCHRIFTEN ÜBER DEN ENERGIEVERBRAUCH UND ZUR UMSETZUNG DER RICHTLINIEN DES KYOTO-PROTOKOLLS EINZULEITEN. (German)
    25 December 2021
    0 references

    Identifiers