INSTALLATION OF 90 KWP OF PHOTOVOLTAIC POWER IN EXCHANGE ON THE SPOT, COVERING THE BUILDING OF THE CRAFT ACTIVITY. WHICHEVER IS THE LOWER OF THE TEST SPECIFIED IN PARAGRAPH 1 OF THIS ARTICLE. (Q2071846): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
label / delabel / de
 
INSTALLATION VON 90 KWP PHOTOVOLTAIKANLAGE IM AUSTAUSCH VOR ORT, AUF DEM DACH DES GEBÄUDES, IN DEM SICH DER HANDWERKSBETRIEB BEFINDET. DAS VERR-SYSTEM IN KOPLANARER WEISE ZUR BESTEHENDEN ABDECKUNG POSITIONIERT
Property / summary
 
INSTALLATION VON 90 KWP PHOTOVOLTAIKANLAGE IM AUSTAUSCH VOR ORT, AUF DEM DACH DES GEBÄUDES, IN DEM SICH DER HANDWERKSBETRIEB BEFINDET. DAS VERR-SYSTEM IN KOPLANARER WEISE ZUR BESTEHENDEN ABDECKUNG POSITIONIERT (German)
Property / summary: INSTALLATION VON 90 KWP PHOTOVOLTAIKANLAGE IM AUSTAUSCH VOR ORT, AUF DEM DACH DES GEBÄUDES, IN DEM SICH DER HANDWERKSBETRIEB BEFINDET. DAS VERR-SYSTEM IN KOPLANARER WEISE ZUR BESTEHENDEN ABDECKUNG POSITIONIERT (German) / rank
 
Normal rank
Property / summary: INSTALLATION VON 90 KWP PHOTOVOLTAIKANLAGE IM AUSTAUSCH VOR ORT, AUF DEM DACH DES GEBÄUDES, IN DEM SICH DER HANDWERKSBETRIEB BEFINDET. DAS VERR-SYSTEM IN KOPLANARER WEISE ZUR BESTEHENDEN ABDECKUNG POSITIONIERT (German) / qualifier
 
point in time: 24 December 2021
Timestamp+2021-12-24T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:20, 24 December 2021

Project Q2071846 in Italy
Language Label Description Also known as
English
INSTALLATION OF 90 KWP OF PHOTOVOLTAIC POWER IN EXCHANGE ON THE SPOT, COVERING THE BUILDING OF THE CRAFT ACTIVITY. WHICHEVER IS THE LOWER OF THE TEST SPECIFIED IN PARAGRAPH 1 OF THIS ARTICLE.
Project Q2071846 in Italy

    Statements

    0 references
    19,475.0 Euro
    0 references
    38,950.0 Euro
    0 references
    50.0 percent
    0 references
    6 February 2017
    0 references
    5 January 2018
    0 references
    31 December 2017
    0 references
    CASTELLANI CONFEZIONI S.R.L.
    0 references
    0 references
    0 references

    43°7'44.51"N, 12°17'15.79"E
    0 references
    INSTALLAZIONE DI IMPIANTO FOTOVOLTAICO DI POTENZA 90 KWP IN REGIME DI SCAMBIO SUL POSTO, SULLA COPERTURA DELL'EDIFICIO SEDE DELL'ATTIVIT¿ ARTIGIANALE. L¿IMPIANTO VERR¿ POSIZIONATO IN MANIERA COMPLANARE ALLA COPERTURA ESISTENTE (Italian)
    0 references
    INSTALLATION OF 90 KWP OF PHOTOVOLTAIC POWER IN EXCHANGE ON THE SPOT, COVERING THE BUILDING OF THE CRAFT ACTIVITY. WHICHEVER IS THE LOWER OF THE TEST SPECIFIED IN PARAGRAPH 1 OF THIS ARTICLE. (English)
    0 references
    INSTALLATION D’UN SYSTÈME PHOTOVOLTAÏQUE DE 90 KWP SOUS ÉCHANGE SUR PLACE, SUR LE TOIT DU BÂTIMENT OÙ SE TROUVE L’ARTISANAT. LE SYSTÈME VERR POSITIONNÉ DE MANIÈRE COPLANAIRE À LA COUVERTURE EXISTANTE (French)
    16 December 2021
    0 references
    INSTALLATIE VAN 90 KWP FOTOVOLTAÏSCHE INSTALLATIE ONDER WISSELING TER PLAATSE, OP HET DAK VAN HET GEBOUW WAAR HET AMBACHTELIJKE BEDRIJF IS GEVESTIGD. HET VERR SYSTEEM GEPLAATST OP EEN COPLANAIRE MANIER AAN DE BESTAANDE DEKKING (Dutch)
    23 December 2021
    0 references
    INSTALLATION VON 90 KWP PHOTOVOLTAIKANLAGE IM AUSTAUSCH VOR ORT, AUF DEM DACH DES GEBÄUDES, IN DEM SICH DER HANDWERKSBETRIEB BEFINDET. DAS VERR-SYSTEM IN KOPLANARER WEISE ZUR BESTEHENDEN ABDECKUNG POSITIONIERT (German)
    24 December 2021
    0 references

    Identifiers

    I38I17000010007
    0 references