URGENT WORK TO SECURE, RESTORE AND CONSOLIDATE AS A RESULT OF INSTABILITY AND LANDSLIDES ON THE 66 FACILITY BETWEEN CAMEROTA, LICUSATI AND SR EX SS 562- URGENT CIVIL PROTECTION INTERVENTIONS — BENEFICIARY PROVINCE OF SALERNO (Q2023242): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
DRINGENDE ARBEITEN ZUR SICHERUNG, WIEDERHERSTELLUNG UND KONSOLIDIERUNG NACH STÖRUNGEN UND ERDRUTSCHEN AUF DEM SP 66 ZWISCHEN CAMEROTA, LICUSATI UND DEM SR EX SS 562- DRINGLICHEN KATASTROPHENSCHUTZMASSNAHMEN – BEGÜNSTIGTE PROVINZ SALERNO | |||||||||||||||
Property / summary | |||||||||||||||
DIE INTERVENTION BESTEHT IN DER SICHERUNG ZWEIER ABSCHNITTE DER STRASSE SP 66 UND EINES ABSCHNITTS DER SR EX SS 562, WOBEI DIE STÜTZSTRUKTUREN DES STRASSENPLANS BEI VERKEHRSVERSCHULDUNG VORRANGIG BEHANDELT WERDEN. DAS PROJEKT IST IN DREI INTERVENTIONSBEREICHE UNTERTEILT UND SIEHT DEN BAU EINES PFAHLS VOR, DAS DIE FRONT IM ERDRUTSCH IM INTERVENTIONSBEREICH 1, EINE STÜTZMAUER IM INTERVENTIONSBEREICH 2 UND EINE GABBIONATA UNTERHALB DES STRASSENPLANS IM INTERVENTIONSBEREICH 3 ENTHÄLT. (German) | |||||||||||||||
Property / summary: DIE INTERVENTION BESTEHT IN DER SICHERUNG ZWEIER ABSCHNITTE DER STRASSE SP 66 UND EINES ABSCHNITTS DER SR EX SS 562, WOBEI DIE STÜTZSTRUKTUREN DES STRASSENPLANS BEI VERKEHRSVERSCHULDUNG VORRANGIG BEHANDELT WERDEN. DAS PROJEKT IST IN DREI INTERVENTIONSBEREICHE UNTERTEILT UND SIEHT DEN BAU EINES PFAHLS VOR, DAS DIE FRONT IM ERDRUTSCH IM INTERVENTIONSBEREICH 1, EINE STÜTZMAUER IM INTERVENTIONSBEREICH 2 UND EINE GABBIONATA UNTERHALB DES STRASSENPLANS IM INTERVENTIONSBEREICH 3 ENTHÄLT. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: DIE INTERVENTION BESTEHT IN DER SICHERUNG ZWEIER ABSCHNITTE DER STRASSE SP 66 UND EINES ABSCHNITTS DER SR EX SS 562, WOBEI DIE STÜTZSTRUKTUREN DES STRASSENPLANS BEI VERKEHRSVERSCHULDUNG VORRANGIG BEHANDELT WERDEN. DAS PROJEKT IST IN DREI INTERVENTIONSBEREICHE UNTERTEILT UND SIEHT DEN BAU EINES PFAHLS VOR, DAS DIE FRONT IM ERDRUTSCH IM INTERVENTIONSBEREICH 1, EINE STÜTZMAUER IM INTERVENTIONSBEREICH 2 UND EINE GABBIONATA UNTERHALB DES STRASSENPLANS IM INTERVENTIONSBEREICH 3 ENTHÄLT. (German) / qualifier | |||||||||||||||
point in time: 24 December 2021
|
Revision as of 00:20, 24 December 2021
Project Q2023242 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | URGENT WORK TO SECURE, RESTORE AND CONSOLIDATE AS A RESULT OF INSTABILITY AND LANDSLIDES ON THE 66 FACILITY BETWEEN CAMEROTA, LICUSATI AND SR EX SS 562- URGENT CIVIL PROTECTION INTERVENTIONS — BENEFICIARY PROVINCE OF SALERNO |
Project Q2023242 in Italy |
Statements
409,560.75 Euro
0 references
546,081.0 Euro
0 references
75.0 percent
0 references
23 December 2013
0 references
30 May 2019
0 references
PROVINCIA DI SALERNO
0 references
L'INTERVENTO CONSISTE NELLA MESSA IN SICUREZZA DI DUE TRATTI DEL TRACCIATO STRADALE SP 66 E DI UN TRATTO DELLA SR EX SS 562, INTERVENENDO IN MODO PRIORITARIO SULLE STRUTTURE DI SOSTEGNO DEL PIANO CARRABILE IN CORRISPONDENZA DEL DISSESTO CHE INTERESSA LA STRADA. IL PROGETTO SI SUDDIVIDE IN 3 AREE DI INTERVENTO E PREVEDE LA REALIZZAZIONE DI UNA PARATIA DI PALI A CONTENIMENTO DEL FRONTE IN FRANA NELL'AREA DI INTERVENTI 1, UN MURO DI SOSTEGNO NELL'AREA DI INTERVENTO 2 ED UNA GABBIONATA AL DI SOTTO DEL PIANO VIABILE NELL'AREA DI INTERVENTO 3 (Italian)
0 references
THE INTERVENTION CONSISTS OF THE SECURING OF TWO SECTIONS OF THE ROAD SECTION SP 66 AND A SECTION OF THE SR EX SS 562, ACTING AS A PRIORITY ON THE SUPPORT STRUCTURES OF THE PLANE RACK IN LINE WITH THE ROAD FAILURE AFFECTING THE ROAD. THE PROJECT CONSISTS OF 3 INTERVENTION AREAS AND PROVIDES FOR THE ESTABLISHMENT OF A PARTITION PILE IN THE FRONT OF THE 1 INTERVENTION AREA, A SUPPORT WALL IN THE AREA OF INTERVENTION 2 AND AN GABBIOONATA UNDER THE PLANE OF INTERVENTION 3 (English)
0 references
L’INTERVENTION CONSISTE À SÉCURISER DEUX TRONÇONS DE LA ROUTE SP 66 ET UN TRONÇON DU SR EX SS 562, EN PRIVILÉGIANT LES STRUCTURES DE SOUTÈNEMENT DU PLAN ROUTIER EN FAUTE DE LA ROUTE. LE PROJET EST DIVISÉ EN 3 ZONES D’INTERVENTION ET PRÉVOIT LA CONSTRUCTION D’UNE CLOISON DE POTEAUX POUR CONTENIR L’AVANT EN GLISSEMENT DE TERRAIN DANS LA ZONE D’INTERVENTION 1, UN MUR DE SOUTIEN DANS LA ZONE D’INTERVENTION 2 ET UN GABBIONATA SOUS LE PLAN ROUTIER DANS LA ZONE D’INTERVENTION 3 (French)
14 December 2021
0 references
DE INTERVENTIE BESTAAT ERIN TWEE GEDEELTEN VAN DE WEGROUTE SP 66 EN EEN DEEL VAN DE SR EX SS 562 VEILIG TE STELLEN, WAARBIJ VOORRANG WORDT GEGEVEN AAN DE ONDERSTEUNENDE STRUCTUREN VAN HET WEGENPLAN TEN NADELE VAN DE WEG. HET PROJECT IS VERDEELD IN DRIE INTERVENTIEGEBIEDEN EN VOORZIET IN DE BOUW VAN EEN SCHOT VAN PALEN OM HET FRONT IN AARDVERSCHUIVING TE BEPERKEN OP HET GEBIED VAN INTERVENTIE 1, EEN STEUNMUUR OP HET GEBIED VAN INTERVENTIE 2 EN EEN GABBIONATA ONDER HET WEGENPLAN OP HET GEBIED VAN INTERVENTIE 3 (Dutch)
23 December 2021
0 references
DIE INTERVENTION BESTEHT IN DER SICHERUNG ZWEIER ABSCHNITTE DER STRASSE SP 66 UND EINES ABSCHNITTS DER SR EX SS 562, WOBEI DIE STÜTZSTRUKTUREN DES STRASSENPLANS BEI VERKEHRSVERSCHULDUNG VORRANGIG BEHANDELT WERDEN. DAS PROJEKT IST IN DREI INTERVENTIONSBEREICHE UNTERTEILT UND SIEHT DEN BAU EINES PFAHLS VOR, DAS DIE FRONT IM ERDRUTSCH IM INTERVENTIONSBEREICH 1, EINE STÜTZMAUER IM INTERVENTIONSBEREICH 2 UND EINE GABBIONATA UNTERHALB DES STRASSENPLANS IM INTERVENTIONSBEREICH 3 ENTHÄLT. (German)
24 December 2021
0 references
Identifiers
H99J14003010006
0 references