PISTIL STEFANO SNC (Q1971116): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
label / nllabel / nl
 
PISTILLI STEFANO SNC
Property / summary
 
HET PROJECT OMVAT DE INSTALLATIE VAN N. 86 FOTOVOLTAÏSCHE MODULES MET EEN VERMOGEN VAN ONGEVEER 300 W, EEN OMVORMER MET EEN VERMOGEN VAN 27,6 KW EN DE AANSLUITING VAN HET OTOVOLTAIC-SYSTEEM OP DE ELEKTRISCHE LIJN VAN DE STRUCTUUR EN OP DE NATIONALE ELEKTRICITEITSLIJN DIE TER PLAATSE WORDT UITGEWISSELD. DOOR DE VOORGESTELDE INTERVENTIE WORDT GESCHAT OP EEN TOTALE BESPARING VAN ONGEVEER 7,9 TOE/JAAR (Dutch)
Property / summary: HET PROJECT OMVAT DE INSTALLATIE VAN N. 86 FOTOVOLTAÏSCHE MODULES MET EEN VERMOGEN VAN ONGEVEER 300 W, EEN OMVORMER MET EEN VERMOGEN VAN 27,6 KW EN DE AANSLUITING VAN HET OTOVOLTAIC-SYSTEEM OP DE ELEKTRISCHE LIJN VAN DE STRUCTUUR EN OP DE NATIONALE ELEKTRICITEITSLIJN DIE TER PLAATSE WORDT UITGEWISSELD. DOOR DE VOORGESTELDE INTERVENTIE WORDT GESCHAT OP EEN TOTALE BESPARING VAN ONGEVEER 7,9 TOE/JAAR (Dutch) / rank
 
Normal rank
Property / summary: HET PROJECT OMVAT DE INSTALLATIE VAN N. 86 FOTOVOLTAÏSCHE MODULES MET EEN VERMOGEN VAN ONGEVEER 300 W, EEN OMVORMER MET EEN VERMOGEN VAN 27,6 KW EN DE AANSLUITING VAN HET OTOVOLTAIC-SYSTEEM OP DE ELEKTRISCHE LIJN VAN DE STRUCTUUR EN OP DE NATIONALE ELEKTRICITEITSLIJN DIE TER PLAATSE WORDT UITGEWISSELD. DOOR DE VOORGESTELDE INTERVENTIE WORDT GESCHAT OP EEN TOTALE BESPARING VAN ONGEVEER 7,9 TOE/JAAR (Dutch) / qualifier
 
point in time: 22 December 2021
Timestamp+2021-12-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 18:14, 22 December 2021

Project Q1971116 in Italy
Language Label Description Also known as
English
PISTIL STEFANO SNC
Project Q1971116 in Italy

    Statements

    0 references
    8,706.0 Euro
    0 references
    14,510.0 Euro
    0 references
    60.0 percent
    0 references
    8 April 2019
    0 references
    23 November 2019
    0 references
    23 October 2020
    0 references
    PISTILLI STEFANO SNC
    0 references
    0 references

    41°29'34.55"N, 14°35'26.63"E
    0 references
    L'INTERVENTO PREVEDE L'INSTALLAZIONE DI N. 86 MODULI FOTOVOLTAICI DELLA POTENZA DI CIRCA 300W, DI UN INVERTER DELLA POTENZA DI 27,6 KW ED IL COLLEGAMENTO DELL'IMPIANTO OTOVOLTAICO ALLA LINEA ELETTRICA DELLA STRUTTURA ED ALLA LINEAELETTRICA NAZIONALE IN REGIME DI SCAMBIO SUL POSTO. ATTRAVERSO L'INTERVENTO PROPOSTO SI STIMA UN RISPARMIO COMPLESSIVO DI CIRCA 7.9 TEP/ANNO (Italian)
    0 references
    THE INTERVENTION INVOLVES THE INSTALLATION OF N. 86 PHOTOVOLTAIC MODULES OF THE POWER OF APPROXIMATELY 300W, 27.6 KW POWER INVERTER AND THE CONNECTION OF THE OTOVOLTAICO INSTALLATION TO THE ELECTRICAL POWER LINE OF THE FACILITY AND TO THE INEAECTICS AT NATIONAL LEVEL IN THE FIELD OF ON-SITE EXCHANGE. A TOTAL SAVING OF APPROXIMATELY 7.9 TOE/YEAR IS ESTIMATED THROUGH THE PROPOSED INTERVENTION. (English)
    0 references
    LE PROJET COMPREND L’INSTALLATION DE MODULES PHOTOVOLTAÏQUES N. 86 D’UNE PUISSANCE D’ENVIRON 300 W, UN ONDULEUR D’UNE PUISSANCE DE 27,6 KW ET LE RACCORDEMENT DU SYSTÈME OTOVOLTAIC À LA LIGNE ÉLECTRIQUE DE LA STRUCTURE ET À LA LIGNE ÉLECTRIQUE NATIONALE SOUS ÉCHANGE SUR PLACE. GRÂCE À L’INTERVENTION PROPOSÉE, ON ESTIME QUE L’ÉCONOMIE TOTALE EST D’ENVIRON 7,9 TEP/AN. (French)
    13 December 2021
    0 references
    HET PROJECT OMVAT DE INSTALLATIE VAN N. 86 FOTOVOLTAÏSCHE MODULES MET EEN VERMOGEN VAN ONGEVEER 300 W, EEN OMVORMER MET EEN VERMOGEN VAN 27,6 KW EN DE AANSLUITING VAN HET OTOVOLTAIC-SYSTEEM OP DE ELEKTRISCHE LIJN VAN DE STRUCTUUR EN OP DE NATIONALE ELEKTRICITEITSLIJN DIE TER PLAATSE WORDT UITGEWISSELD. DOOR DE VOORGESTELDE INTERVENTIE WORDT GESCHAT OP EEN TOTALE BESPARING VAN ONGEVEER 7,9 TOE/JAAR (Dutch)
    22 December 2021
    0 references

    Identifiers

    D99D18000120007
    0 references