Refurbishment of the Quinta do Papelão treatment plant (Q2982021): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
label / nllabel / nl
 
Renovatie van de Quinta do Papelão WWTP
Property / summary
 
De operatie voorziet in de invoering van secundaire behandeling door langdurige beluchtingstank, gevolgd door secundaire decanter, om de uiteindelijke prestaties van de RWZI te verbeteren, aangezien zij in de huidige configuratie en in het licht van de verzoeken niet garandeert dat de bepalingen van de titel Watergebruik worden nageleefd en bijgevolg de naleving van het Portugese en het communautaire rechtskader wordt gewaarborgd. (Dutch)
Property / summary: De operatie voorziet in de invoering van secundaire behandeling door langdurige beluchtingstank, gevolgd door secundaire decanter, om de uiteindelijke prestaties van de RWZI te verbeteren, aangezien zij in de huidige configuratie en in het licht van de verzoeken niet garandeert dat de bepalingen van de titel Watergebruik worden nageleefd en bijgevolg de naleving van het Portugese en het communautaire rechtskader wordt gewaarborgd. (Dutch) / rank
 
Normal rank
Property / summary: De operatie voorziet in de invoering van secundaire behandeling door langdurige beluchtingstank, gevolgd door secundaire decanter, om de uiteindelijke prestaties van de RWZI te verbeteren, aangezien zij in de huidige configuratie en in het licht van de verzoeken niet garandeert dat de bepalingen van de titel Watergebruik worden nageleefd en bijgevolg de naleving van het Portugese en het communautaire rechtskader wordt gewaarborgd. (Dutch) / qualifier
 
point in time: 20 December 2021
Timestamp+2021-12-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:14, 20 December 2021

Project Q2982021 in Portugal
Language Label Description Also known as
English
Refurbishment of the Quinta do Papelão treatment plant
Project Q2982021 in Portugal

    Statements

    0 references
    593,822.0 Euro
    0 references
    698,614.0 Euro
    0 references
    85.0 percent
    0 references
    30 June 2015
    0 references
    31 December 2017
    0 references
    AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
    0 references
    0 references
    0 references

    38°57'30.38"N, 8°48'37.44"W
    0 references
    A operação prevê a introdução de tratamento secundário por tanque de arejamento prolongado seguido de decantador secundário, para melhoria do desempenho final da ETAR, uma vez que na sua atual configuração e face às solicitações, não permite garantir o cumprimento dos termos do Título de Utilização de Recursos Hídricos e consequentemente garantir o cumprimento do quadro legal português e comunitário. (Portuguese)
    0 references
    The operation provides for the introduction of secondary treatment by a prolonged aeration tank followed by a secondary decanter, in order to improve the final performance of the sewage treatment plant, since in its current configuration and in the face of the requests, it is not possible to guarantee compliance with the terms of the Water Resources Use Title and consequently ensure compliance with the Portuguese and Community legal framework. (English)
    9 July 2021
    0 references
    L’opération prévoit l’introduction d’un traitement secondaire par cuve d’aération prolongée suivie d’un décanteur secondaire, afin d’améliorer les performances finales de la station d’épuration des eaux usées, étant donné que, dans sa configuration actuelle et compte tenu des demandes, elle ne garantit pas le respect des termes du titre d’utilisation de l’eau et, par conséquent, le respect du cadre juridique portugais et communautaire. (French)
    7 December 2021
    0 references
    Der Betrieb sieht die Einführung einer Sekundärbehandlung durch verlängerten Belüftungstank, gefolgt von einem sekundären Dekanter, zur Verbesserung der Endleistung des WWTP vor, da er in seiner derzeitigen Konfiguration und in Anbetracht der Anträge nicht die Einhaltung der Bestimmungen des Titels Wassernutzung gewährleistet und somit die Einhaltung des portugiesischen und des gemeinschaftlichen Rechtsrahmens gewährleistet. (German)
    15 December 2021
    0 references
    De operatie voorziet in de invoering van secundaire behandeling door langdurige beluchtingstank, gevolgd door secundaire decanter, om de uiteindelijke prestaties van de RWZI te verbeteren, aangezien zij in de huidige configuratie en in het licht van de verzoeken niet garandeert dat de bepalingen van de titel Watergebruik worden nageleefd en bijgevolg de naleving van het Portugese en het communautaire rechtskader wordt gewaarborgd. (Dutch)
    20 December 2021
    0 references
    Benavente, Benavente
    0 references

    Identifiers

    POSEUR-03-2012-FC-000042
    0 references