Via Panoramic and Requalification of Rua Oliveira Salazar (Q2895360): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
label / nllabel / nl
 
Via Panoramisch en Herkwalificatie van Rua Oliveira Salazar
Property / summary
 
Het project bestaat uit de bouw van het gedeelte van de Via Panorâmica tussen Avenida Soeiro Mendes da Maia en Rua Dr. Oliveira Salazar, herkwalificatie van Rua Oliveira Salazar en implantatie van een plein naast de fabriek van Santo Thyrso, waar het autoverkeer van de verschillende richtingen samen zal komen en dat de voetgangers- en fietsverbindingen tussen de geïngrepen wegen en de Santo Thyrso-fabriek zal maken. (Dutch)
Property / summary: Het project bestaat uit de bouw van het gedeelte van de Via Panorâmica tussen Avenida Soeiro Mendes da Maia en Rua Dr. Oliveira Salazar, herkwalificatie van Rua Oliveira Salazar en implantatie van een plein naast de fabriek van Santo Thyrso, waar het autoverkeer van de verschillende richtingen samen zal komen en dat de voetgangers- en fietsverbindingen tussen de geïngrepen wegen en de Santo Thyrso-fabriek zal maken. (Dutch) / rank
 
Normal rank
Property / summary: Het project bestaat uit de bouw van het gedeelte van de Via Panorâmica tussen Avenida Soeiro Mendes da Maia en Rua Dr. Oliveira Salazar, herkwalificatie van Rua Oliveira Salazar en implantatie van een plein naast de fabriek van Santo Thyrso, waar het autoverkeer van de verschillende richtingen samen zal komen en dat de voetgangers- en fietsverbindingen tussen de geïngrepen wegen en de Santo Thyrso-fabriek zal maken. (Dutch) / qualifier
 
point in time: 19 December 2021
Timestamp+2021-12-19T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:37, 19 December 2021

Project Q2895360 in Portugal
Language Label Description Also known as
English
Via Panoramic and Requalification of Rua Oliveira Salazar
Project Q2895360 in Portugal

    Statements

    0 references
    478,061.0 Euro
    0 references
    562,425.0 Euro
    0 references
    85.0 percent
    0 references
    16 March 2016
    0 references
    31 January 2019
    0 references
    MUNICIPIO DE SANTO TIRSO
    0 references
    0 references

    41°20'33.14"N, 8°29'3.66"W
    0 references
    O projeto consiste na construção do troço da Via Panorâmica localizado entre a Avenida Soeiro Mendes da Maia e Rua Dr. Oliveira Salazar, requalificação da Rua Oliveira Salazar e implantação de uma praça junto à Fábrica de Santo Thyrso, para onde confluirá o tráfego automóvel das diferentes direções e que fará a ligação pedonal e ciclável entre as vias intervencionadas e a Fábrica de Santo Thyrso. (Portuguese)
    0 references
    The project consists of the construction of the section of the Panoramic Way located between Avenida Soeiro Mendes da Maia and Rua Dr. Oliveira Salazar, requalification of Rua Oliveira Salazar and implantation of a square next to the Santo Thyrso Factory, where the car traffic from the different directions will converge and that will make the pedestrian and cyclable link between the intervened roads and the Santo Thyrso Factory. (English)
    8 July 2021
    0 references
    Le projet consiste en la construction du tronçon de la Via Panorâmica situé entre Avenida Soeiro Mendes da Maia et Rua Dr. Oliveira Salazar, requalification de Rua Oliveira Salazar et implantation d’une place à côté de l’usine de Santo Thyrso, où la circulation automobile des différentes directions convergera et qui fera la liaison piétonne et cyclable entre les routes interpellées et l’usine Santo Thyrso. (French)
    5 December 2021
    0 references
    Das Projekt besteht aus dem Bau des Abschnitts von Via Panorâmica zwischen Avenida Soeiro Mendes da Maia und Rua Dr. Oliveira Salazar, Requalifizierung von Rua Oliveira Salazar und Implantation eines Platzes neben der Fabrik von Santo Thyrso, wo der Autoverkehr der verschiedenen Richtungen zusammenlaufen wird und die Fußgänger- und zyklierbare Verbindung zwischen den eingegriffenen Straßen und der Santo Thyrso Fabrik machen wird. (German)
    13 December 2021
    0 references
    Het project bestaat uit de bouw van het gedeelte van de Via Panorâmica tussen Avenida Soeiro Mendes da Maia en Rua Dr. Oliveira Salazar, herkwalificatie van Rua Oliveira Salazar en implantatie van een plein naast de fabriek van Santo Thyrso, waar het autoverkeer van de verschillende richtingen samen zal komen en dat de voetgangers- en fietsverbindingen tussen de geïngrepen wegen en de Santo Thyrso-fabriek zal maken. (Dutch)
    19 December 2021
    0 references
    Santo Tirso, União das freguesias de Santo Tirso, Couto (Santa Cristina e São Miguel) e Burgães
    0 references

    Identifiers

    NORTE-05-1406-FEDER-000031
    0 references