Rehabilitation of the Seixo Housing Set – Phase 1 – Energy Efficiency (Q2894642): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
Rehabilitatie van de huisvestingsset van de as — Fase 1 — Energie-efficiëntie | |||||||||||||||
Property / summary | |||||||||||||||
Herstel van de bouw van dit CH, met het oog op de verbetering van de bewoonbaarheid van de fracties, in termen van comfort, gezondheid en energie-efficiëntie. De CH van Seixo Phase 1 bestaat uit 5 blokken, met 230 branden verdeeld door de volgende typologieën: 115 T2 en 115 T3. (Dutch) | |||||||||||||||
Property / summary: Herstel van de bouw van dit CH, met het oog op de verbetering van de bewoonbaarheid van de fracties, in termen van comfort, gezondheid en energie-efficiëntie. De CH van Seixo Phase 1 bestaat uit 5 blokken, met 230 branden verdeeld door de volgende typologieën: 115 T2 en 115 T3. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Herstel van de bouw van dit CH, met het oog op de verbetering van de bewoonbaarheid van de fracties, in termen van comfort, gezondheid en energie-efficiëntie. De CH van Seixo Phase 1 bestaat uit 5 blokken, met 230 branden verdeeld door de volgende typologieën: 115 T2 en 115 T3. (Dutch) / qualifier | |||||||||||||||
point in time: 19 December 2021
|
Revision as of 10:34, 19 December 2021
Project Q2894642 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Rehabilitation of the Seixo Housing Set – Phase 1 – Energy Efficiency |
Project Q2894642 in Portugal |
Statements
1,971,849.0 Euro
0 references
2,319,823.0 Euro
0 references
85.0 percent
0 references
26 September 2017
0 references
31 May 2022
0 references
MUNICIPIO DE MATOSINHOS
0 references
Reabilitação do edificado deste CH, na perspetiva de melhorar as condições de habitabilidade das suas frações, ao nível do conforto, salubridade e eficiência energética. O CH do Seixo 1ª Fase é composto por 5 blocos, com 230 fogos distribuídos pelas seguintes tipologias: 115 T2 e 115 T3. (Portuguese)
0 references
Rehabilitation of the building of this CH, in order to improve the habitability of its fractions, in terms of comfort, health and energy efficiency. The CH of the Sixth Phase consists of 5 blocks, with 230 lights distributed in the following typologies: 115 T2 and 115 T3. (English)
8 July 2021
0 references
Réhabilitation du bâtiment de ce CH, en vue d’améliorer les conditions d’habitabilité de ses fractions, en termes de confort, de santé et d’efficacité énergétique. Le CH de Seixo Phase 1 se compose de 5 blocs, avec 230 incendies répartis selon les typologies suivantes: 115 T2 et 115 T3. (French)
5 December 2021
0 references
Sanierung des Gebäudes dieser CH im Hinblick auf die Verbesserung der Bewohnbarkeitsbedingungen ihrer Fraktionen in Bezug auf Komfort, Gesundheit und Energieeffizienz. Die CH von Seixo Phase 1 besteht aus 5 Blöcken, wobei 230 Brände nach folgenden Typologien verteilt sind: 115 T2 und 115 T3. (German)
13 December 2021
0 references
Herstel van de bouw van dit CH, met het oog op de verbetering van de bewoonbaarheid van de fracties, in termen van comfort, gezondheid en energie-efficiëntie. De CH van Seixo Phase 1 bestaat uit 5 blokken, met 230 branden verdeeld door de volgende typologieën: 115 T2 en 115 T3. (Dutch)
19 December 2021
0 references
Matosinhos, União das freguesias de São Mamede de Infesta e Senhora da Hora
0 references
Identifiers
NORTE-03-1204-FEDER-000059
0 references