Pedestrian Public Access to the New Door of Treason (Q2863418): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
Voetgangers Openbare Toegang tot de Nieuwe Deur van Treason | |||||||||||||||
Property / summary | |||||||||||||||
Voetgangers Toegang tot de Deur van Treason is geïntegreerd in het Project van herkwalificatie en revalidatie van de openbare ruimte van de Akropolis van Évora, die wordt gearticuleerd met de interventie in de Patio en Ermida de S. Miguel, het bevorderen van voetgangers toegang. De interventie bestaat uit de bouw van een trottoir en een trap langs de S. Miguel Ramp en een pad in grind vanaf de Poort van Traição en over de rotsachtige uitbouw en het verharden van de Ramp. (Dutch) | |||||||||||||||
Property / summary: Voetgangers Toegang tot de Deur van Treason is geïntegreerd in het Project van herkwalificatie en revalidatie van de openbare ruimte van de Akropolis van Évora, die wordt gearticuleerd met de interventie in de Patio en Ermida de S. Miguel, het bevorderen van voetgangers toegang. De interventie bestaat uit de bouw van een trottoir en een trap langs de S. Miguel Ramp en een pad in grind vanaf de Poort van Traição en over de rotsachtige uitbouw en het verharden van de Ramp. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Voetgangers Toegang tot de Deur van Treason is geïntegreerd in het Project van herkwalificatie en revalidatie van de openbare ruimte van de Akropolis van Évora, die wordt gearticuleerd met de interventie in de Patio en Ermida de S. Miguel, het bevorderen van voetgangers toegang. De interventie bestaat uit de bouw van een trottoir en een trap langs de S. Miguel Ramp en een pad in grind vanaf de Poort van Traição en over de rotsachtige uitbouw en het verharden van de Ramp. (Dutch) / qualifier | |||||||||||||||
point in time: 18 December 2021
|
Revision as of 18:11, 18 December 2021
Project Q2863418 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Pedestrian Public Access to the New Door of Treason |
Project Q2863418 in Portugal |
Statements
47,904.0 Euro
0 references
56,357.0 Euro
0 references
85.0 percent
0 references
1 June 2017
0 references
30 December 2019
0 references
MUNICÍPIO DE ÉVORA
0 references
Q2986425 (Deleted Item)
0 references
O Acesso pedonal à Porta da Traição está integrado no Projeto de Requalificação e Reabilitação do Espaço Público da Acrópole de Évora, que se articula com a intervenção no Pátio e Ermida de S. Miguel, promovendo o acesso pedonal. A intervenção consiste na construção de passeio lateral e escadaria ao longo da Rampa de S. Miguel e de um caminho em saibro a partir da Porta da Traição e sobre o afloramento rochoso e repavimentação da Rampa. (Portuguese)
0 references
The pedestrian access to the Gate of Traction is integrated into the Requalification and Rehabilitation Project of the Public Space of the Évora Acropolis, which is articulated with the intervention in the Patio and Hermitage of S. Miguel, promoting pedestrian access. The intervention consists of the construction of a side walk and staircase along the S. Miguel Ramp and a clay path from the Gate of the Treason and on the rocky outcrop and repaviation of the Ramp. (English)
6 July 2021
0 references
L’accès piétonnier à la porte de la trahison est intégré au Projet de Requalification et de Réhabilitation de l’Espace Public de l’Acropole d’Évora, qui s’articule avec l’intervention dans le Patio et l’Ermida de S. Miguel, favorisant l’accès piétonnier. L’intervention consiste en la construction d’un trottoir et d’un escalier le long de la rampe de S. Miguel et d’un sentier en gravier depuis la porte de Traição et au-dessus de l’affleurement rocheux et du repeuplement du Ramp. (French)
4 December 2021
0 references
Fußgänger Zugang zur Treason-Tür ist in das Projekt der Requalifikation und Sanierung des öffentlichen Raums der Akropolis von Évora integriert, die mit dem Eingriff in den Patio und Ermida de S. Miguel artikuliert wird, die den Zugang zu Fußgängern fördert. Die Intervention besteht aus dem Bau eines Bürgersteigs und einer Treppe entlang der S. Miguel Ramp und eines Pfades in Kies vom Tor von Traição und über den Felsvorsprung und die Umgestaltung des Ramps. (German)
13 December 2021
0 references
Voetgangers Toegang tot de Deur van Treason is geïntegreerd in het Project van herkwalificatie en revalidatie van de openbare ruimte van de Akropolis van Évora, die wordt gearticuleerd met de interventie in de Patio en Ermida de S. Miguel, het bevorderen van voetgangers toegang. De interventie bestaat uit de bouw van een trottoir en een trap langs de S. Miguel Ramp en een pad in grind vanaf de Poort van Traição en over de rotsachtige uitbouw en het verharden van de Ramp. (Dutch)
18 December 2021
0 references
Évora, União das freguesias de Évora (São Mamede, Sé, São Pedro e Santo Antão)
0 references
Identifiers
ALT20-04-2316-FEDER-000038
0 references