Integrated depollution of the Alguidar do Dueça – Implementation of sewage sewage networks – Connection to the Quinta de Cima sewage treatment plant (Q2982683): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Integrierte Verschmutzung des Beckens Dueça – Umsetzung von Abwasserentsorgungsnetzen – Verbindung mit der Quinta de Cima WWTP | |||||||||||||||
Property / summary | |||||||||||||||
Der Betrieb besteht in der Ausführung von 4 Hebesystemen, bestehend aus 4 EE und 1 153,82 ml Hubkanälen, 42 908 ml gravitischen Kollektoren mit 749 Verbindungszweigen, die mehrere noch nicht im Einflussbereich des Teilsystems (niedrig) servierte Cluster entwässern und mit dem Penella-Emissário E1 (hohen) Subsystem und der Endbehandlung an der Quinta de Cima WWTP verbunden sein werden. (German) | |||||||||||||||
Property / summary: Der Betrieb besteht in der Ausführung von 4 Hebesystemen, bestehend aus 4 EE und 1 153,82 ml Hubkanälen, 42 908 ml gravitischen Kollektoren mit 749 Verbindungszweigen, die mehrere noch nicht im Einflussbereich des Teilsystems (niedrig) servierte Cluster entwässern und mit dem Penella-Emissário E1 (hohen) Subsystem und der Endbehandlung an der Quinta de Cima WWTP verbunden sein werden. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Der Betrieb besteht in der Ausführung von 4 Hebesystemen, bestehend aus 4 EE und 1 153,82 ml Hubkanälen, 42 908 ml gravitischen Kollektoren mit 749 Verbindungszweigen, die mehrere noch nicht im Einflussbereich des Teilsystems (niedrig) servierte Cluster entwässern und mit dem Penella-Emissário E1 (hohen) Subsystem und der Endbehandlung an der Quinta de Cima WWTP verbunden sein werden. (German) / qualifier | |||||||||||||||
point in time: 16 December 2021
|
Revision as of 06:11, 16 December 2021
Project Q2982683 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Integrated depollution of the Alguidar do Dueça – Implementation of sewage sewage networks – Connection to the Quinta de Cima sewage treatment plant |
Project Q2982683 in Portugal |
Statements
2,289,755.0 Euro
0 references
2,693,829.0 Euro
0 references
85.0 percent
0 references
1 March 2019
0 references
30 December 2022
0 references
APIN - EMPRESA INTERMUNICIPAL DE AMBIENTE DO PINHAL INTERIOR, E.I.M., S.A.
0 references
Q3054883 (Deleted Item)
0 references
A operação consiste na execução de 4 sistemas elevatórios, constituídos por 4 EE e 1153.82ml de condutas elevatórias, 42908 ml de coletores gravíticos executando 749 ramais de ligação, que irão drenar vários aglomerados ainda não servidos na área de influencia do subsistema (baixa) e que terão ligação ao subsistema de penela-Emissário E1 (alta) e tratamento final na ETAR Quinta de Cima, com descarga do efluente para o Rio Dueça. (Portuguese)
0 references
The operation consists of the execution of 4 lifting systems, consisting of 4 EE and 1153,82 ml of lifting ducts, 42908 ml of gravitic collectors running 749 connecting branches, which will drain several clusters not yet served in the area of influence of the subsystem (low) and that will have connection to the E1 (high) penella-Emissary subsystem and final treatment at the Quinta de Cima treatment plant, with discharge of the effluent to Rio Dueça. (English)
9 July 2021
0 references
L’opération consiste en l’exécution de 4 systèmes de levage, composés de 4 EE et 1 153,82 ml de conduits de levage, 42 908 ml de collecteurs gravitiques fonctionnant 749 branches de raccordement, qui draineront plusieurs grappes non encore servies dans la zone d’influence du sous-système (faible) et qui auront une connexion au sous-système penella-Emissário E1 (haut) et le traitement final à la Quinta de Cima WWTP, avec rejet de l’effluent dans la rivière Dueça. (French)
7 December 2021
0 references
Der Betrieb besteht in der Ausführung von 4 Hebesystemen, bestehend aus 4 EE und 1 153,82 ml Hubkanälen, 42 908 ml gravitischen Kollektoren mit 749 Verbindungszweigen, die mehrere noch nicht im Einflussbereich des Teilsystems (niedrig) servierte Cluster entwässern und mit dem Penella-Emissário E1 (hohen) Subsystem und der Endbehandlung an der Quinta de Cima WWTP verbunden sein werden. (German)
16 December 2021
0 references
Penela
0 references
Identifiers
POSEUR-03-2012-FC-001086
0 references