Execution of the High-Low Links in the Lordelo/Aves SAR (Q2982344): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Ausführung von High-Low Links in SAR Lordelo/Beasts | |||||||||||||||
Property / summary | |||||||||||||||
Ziel dieses Vorhabens ist es, Abwasserentwässerungssysteme in der Gemeinde Santo Tirso zu schließen, um die Auslastung der im Abwasser-Teilsystem Lordelo/Aves installierten Kapazität zu optimieren und den Service durch den Bau von 20,2 km Abwasserentwässerungsnetzen zu verbinden. (German) | |||||||||||||||
Property / summary: Ziel dieses Vorhabens ist es, Abwasserentwässerungssysteme in der Gemeinde Santo Tirso zu schließen, um die Auslastung der im Abwasser-Teilsystem Lordelo/Aves installierten Kapazität zu optimieren und den Service durch den Bau von 20,2 km Abwasserentwässerungsnetzen zu verbinden. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Ziel dieses Vorhabens ist es, Abwasserentwässerungssysteme in der Gemeinde Santo Tirso zu schließen, um die Auslastung der im Abwasser-Teilsystem Lordelo/Aves installierten Kapazität zu optimieren und den Service durch den Bau von 20,2 km Abwasserentwässerungsnetzen zu verbinden. (German) / qualifier | |||||||||||||||
point in time: 15 December 2021
|
Revision as of 20:06, 15 December 2021
Project Q2982344 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Execution of the High-Low Links in the Lordelo/Aves SAR |
Project Q2982344 in Portugal |
Statements
1,124,462.0 Euro
0 references
1,322,897.0 Euro
0 references
85.0 percent
0 references
24 October 2017
0 references
31 October 2020
0 references
ÁGUAS DO NORTE, S.A.
0 references
Q3006399 (Deleted Item)
0 references
Esta operação visa o fecho dos sistemas de saneamento de águas residuais em baixa do município de Santo Tirso, com vista à otimização da utilização da capacidade instalada no Subsistema de Águas Residuais de Lordelo/Aves e da adesão ao serviço, através da construção de 20,2 km de redes de drenagem de águas residuais. (Portuguese)
0 references
This operation aims to close down the wastewater drainage systems in the municipality of Santo Tirso, with a view to optimising the capacity utilisation in the Lordelo/Aves Residual Water Subsystem and adhesion to the service, through the construction of 20.2 km of sewage drainage networks. (English)
9 July 2021
0 references
L’objectif de cette opération est de fermer les systèmes de drainage des eaux usées dans la commune de Santo Tirso, en vue d’optimiser l’utilisation de la capacité installée dans le sous-système des eaux usées de Lordelo/Aves et de rejoindre le service, en construisant 20,2 km de réseaux de drainage des eaux usées. (French)
7 December 2021
0 references
Ziel dieses Vorhabens ist es, Abwasserentwässerungssysteme in der Gemeinde Santo Tirso zu schließen, um die Auslastung der im Abwasser-Teilsystem Lordelo/Aves installierten Kapazität zu optimieren und den Service durch den Bau von 20,2 km Abwasserentwässerungsnetzen zu verbinden. (German)
15 December 2021
0 references
Santo Tirso
0 references
Identifiers
POSEUR-03-2012-FC-000497
0 references