NAPLES PORT — ROAD AND RAIL CONNECTIONS WITHIN THE PORT (Q2017483): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
PORT DE NAPLES — LIAISONS ROUTIÈRES ET FERROVIAIRES INTERNES AU SIÈGE PORTUAIRE
Property / summary
 
IL EST PRÉVU DE RÉORGANISER LES ROUTES PORTUAIRES. EN DÉTAIL, LA LIAISON ROUTIÈRE ENTRE LE LEVANT DARSENA, LE SECTEUR PORTUAIRE DE PONENTE ET L’AUTOROUTE Ê CONSISTE EN UN CARREFOUR GIRATOIRE À EFFECTUER EN CORRESPONDANCE AVEC L’ACTUELLE PORTE BAUSAN, AUQUEL SERA RELIÉ UN VIADUC RELIANT LA ROUTE EXISTANTE. L’INTERVENTION PREND LA FORME D’UNE RÉORGANISATION DES ROUTES EXISTANTES, AFIN D’ACCROÎTRE LA SÉCURITÉ ET DE RÉDUIRE SIMULTANÉMENT LA POLLUTION. LA RÉORGANISATION DU RÉSEAU FERROVIAIRE EST ÉGALEMENT PRÉVUE DANS LE CADRE ÉCONOMIQUE DU PROJET. (French)
Property / summary: IL EST PRÉVU DE RÉORGANISER LES ROUTES PORTUAIRES. EN DÉTAIL, LA LIAISON ROUTIÈRE ENTRE LE LEVANT DARSENA, LE SECTEUR PORTUAIRE DE PONENTE ET L’AUTOROUTE Ê CONSISTE EN UN CARREFOUR GIRATOIRE À EFFECTUER EN CORRESPONDANCE AVEC L’ACTUELLE PORTE BAUSAN, AUQUEL SERA RELIÉ UN VIADUC RELIANT LA ROUTE EXISTANTE. L’INTERVENTION PREND LA FORME D’UNE RÉORGANISATION DES ROUTES EXISTANTES, AFIN D’ACCROÎTRE LA SÉCURITÉ ET DE RÉDUIRE SIMULTANÉMENT LA POLLUTION. LA RÉORGANISATION DU RÉSEAU FERROVIAIRE EST ÉGALEMENT PRÉVUE DANS LE CADRE ÉCONOMIQUE DU PROJET. (French) / rank
 
Normal rank
Property / summary: IL EST PRÉVU DE RÉORGANISER LES ROUTES PORTUAIRES. EN DÉTAIL, LA LIAISON ROUTIÈRE ENTRE LE LEVANT DARSENA, LE SECTEUR PORTUAIRE DE PONENTE ET L’AUTOROUTE Ê CONSISTE EN UN CARREFOUR GIRATOIRE À EFFECTUER EN CORRESPONDANCE AVEC L’ACTUELLE PORTE BAUSAN, AUQUEL SERA RELIÉ UN VIADUC RELIANT LA ROUTE EXISTANTE. L’INTERVENTION PREND LA FORME D’UNE RÉORGANISATION DES ROUTES EXISTANTES, AFIN D’ACCROÎTRE LA SÉCURITÉ ET DE RÉDUIRE SIMULTANÉMENT LA POLLUTION. LA RÉORGANISATION DU RÉSEAU FERROVIAIRE EST ÉGALEMENT PRÉVUE DANS LE CADRE ÉCONOMIQUE DU PROJET. (French) / qualifier
 
point in time: 14 December 2021
Timestamp+2021-12-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:16, 14 December 2021

Project Q2017483 in Italy
Language Label Description Also known as
English
NAPLES PORT — ROAD AND RAIL CONNECTIONS WITHIN THE PORT
Project Q2017483 in Italy

    Statements

    0 references
    19,875,000.0 Euro
    0 references
    26,500,000.0 Euro
    0 references
    75.0 percent
    0 references
    19 July 2019
    0 references
    31 December 2021
    0 references
    ADSP DEL MAR TIRRENO CENTRALE
    0 references
    0 references

    40°50'9.35"N, 14°14'55.61"E
    0 references
    E' PREVISTO IL RIASSETTO DELLA VIABILITà PORTUALE. IN DETTAGLIO, IL COLLEGAMENTO STRADALE TRA LA DARSENA DI LEVANTE, IL SETTORE PORTUALE DI PONENTE E L'AUTOSTRADA Ê COSTITUITO DA UNO SVINCOLO A ROTATORIA (A RASO) DA REALIZZARSI IN CORRISPONDENZA DELL'ATTUALE VARCO BAUSAN, A CUI SI COLLEGHERà UN VIADOTTO DI RACCORDO CON L'ESISTENTE VIABILITà. L'INTERVENTO SI CONCRETIZZA IN UN RIASSETTO DI STRADE GIà ESISTENTI, AL FINE DI AUMENTARE LA SICUREZZA E RIDURRE CONTEMPORANEAMENTE L'INQUINAMENTO. E' INOLTRE PREVISTO NELL'AMBITO DEL QUADRO ECONOMICO DEL PROGETTO IL RIASSETTO DELLA RETE FERROVIARIA. (Italian)
    0 references
    PROVISION IS MADE FOR THE RESTRUCTURING OF THE VIABILIT-PORT. IN DETAIL, THE ROAD LINK BETWEEN THE LEVANT DARSENA, THE PONENTE PORT AREA AND THE ÃO MOTORWAY CONSISTING OF A ROUNDABOUT RELEASE TO BE CARRIED OUT IN LINE WITH THE CURRENT BAUSAN GATE, TO WHICH THE EXISTING BAUSAN INTERFACE WITH THE EXISTING VIABILITS. THE INTERVENTION TAKES THE FORM OF A REHABILITATION OF EXISTING ROADS IN ORDER TO INCREASE SAFETY AND REDUCE POLLUTION AT THE SAME TIME. IT IS ALSO FORESEEN WITHIN THE ECONOMIC FRAMEWORK OF THE PROJECT THE REHABILITATION OF THE RAIL NETWORK. (English)
    0 references
    IL EST PRÉVU DE RÉORGANISER LES ROUTES PORTUAIRES. EN DÉTAIL, LA LIAISON ROUTIÈRE ENTRE LE LEVANT DARSENA, LE SECTEUR PORTUAIRE DE PONENTE ET L’AUTOROUTE Ê CONSISTE EN UN CARREFOUR GIRATOIRE À EFFECTUER EN CORRESPONDANCE AVEC L’ACTUELLE PORTE BAUSAN, AUQUEL SERA RELIÉ UN VIADUC RELIANT LA ROUTE EXISTANTE. L’INTERVENTION PREND LA FORME D’UNE RÉORGANISATION DES ROUTES EXISTANTES, AFIN D’ACCROÎTRE LA SÉCURITÉ ET DE RÉDUIRE SIMULTANÉMENT LA POLLUTION. LA RÉORGANISATION DU RÉSEAU FERROVIAIRE EST ÉGALEMENT PRÉVUE DANS LE CADRE ÉCONOMIQUE DU PROJET. (French)
    14 December 2021
    0 references

    Identifiers

    I64B12000140006
    0 references