Requalification of the School Park – 3rd Phase (Q2881925): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Neuqualifizierung des Schulparks – Stufe 3 | |||||||||||||||
Property / summary | |||||||||||||||
In Anbetracht der Realität des Concelhio Schulparks, ist es wichtig, Eingriffe in die Sanierung der Infrastruktur, Reparatur von Infiltrationen, Risse, Gemälde von Decken und Wänden, Umbau von Küchen und Cafeterien sowie Sanitäranlagen, Außenräume und Entfernung von Feuer durchzuführen. (German) | |||||||||||||||
Property / summary: In Anbetracht der Realität des Concelhio Schulparks, ist es wichtig, Eingriffe in die Sanierung der Infrastruktur, Reparatur von Infiltrationen, Risse, Gemälde von Decken und Wänden, Umbau von Küchen und Cafeterien sowie Sanitäranlagen, Außenräume und Entfernung von Feuer durchzuführen. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: In Anbetracht der Realität des Concelhio Schulparks, ist es wichtig, Eingriffe in die Sanierung der Infrastruktur, Reparatur von Infiltrationen, Risse, Gemälde von Decken und Wänden, Umbau von Küchen und Cafeterien sowie Sanitäranlagen, Außenräume und Entfernung von Feuer durchzuführen. (German) / qualifier | |||||||||||||||
point in time: 13 December 2021
|
Revision as of 12:21, 13 December 2021
Project Q2881925 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Requalification of the School Park – 3rd Phase |
Project Q2881925 in Portugal |
Statements
449,085.0 Euro
0 references
898,170.0 Euro
0 references
50.0 percent
0 references
1 March 2018
0 references
30 January 2020
0 references
MUNICIPIO DE SETUBAL
0 references
Considerando a realidade do Parque Escolar concelhio torna-se imprescindível a realização de intervenções a nível de reabilitação das infraestruturas, a reparação de infiltrações, fissuras, pinturas de tetos e paredes, a remodelação de cozinhas e refeitórios assim como de instalações sanitárias, espaços exteriores e remoção de fibrocimento. (Portuguese)
0 references
Considering the reality of the Municipal School Park, it is essential to carry out interventions in the level of infrastructure rehabilitation, the repair of infiltrations, cracks, ceiling and wall paintings, the remodeling of kitchens and cafeterias as well as sanitary facilities, outdoor spaces and removal of fibrocement. (English)
7 July 2021
0 references
Compte tenu de la réalité du parc scolaire Concelhio, il est essentiel de mener des interventions dans la réhabilitation des infrastructures, la réparation des infiltrations, des fissures, des peintures de plafonds et de murs, la rénovation des cuisines et des cafétérias ainsi que des installations sanitaires, des espaces extérieurs et l’enlèvement du fibrociment. (French)
5 December 2021
0 references
In Anbetracht der Realität des Concelhio Schulparks, ist es wichtig, Eingriffe in die Sanierung der Infrastruktur, Reparatur von Infiltrationen, Risse, Gemälde von Decken und Wänden, Umbau von Küchen und Cafeterien sowie Sanitäranlagen, Außenräume und Entfernung von Feuer durchzuführen. (German)
13 December 2021
0 references
Setúbal, Setúbal (São Sebastião)
0 references
Identifiers
LISBOA-07-5673-FEDER-000053
0 references