Torrão Mobility Plan – Phase 2 (Q2863353): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
label / delabel / de
 
Torrão Mobilitätsplan – 2. Phase
Property / summary
 
Diese Phase des Mobilitätsplans von Torrão setzt die Verbesserung der Fußgängerzirkulationsbedingungen in einigen Straßen des historischen Zentrums von Torrão fort, die aufgrund der unregelmäßigen Eigenschaften seines Bodens und in einigen Fällen die Topographie des Geländes nicht den Komfort und die Sicherheit bieten, die die Bevölkerung braucht. (German)
Property / summary: Diese Phase des Mobilitätsplans von Torrão setzt die Verbesserung der Fußgängerzirkulationsbedingungen in einigen Straßen des historischen Zentrums von Torrão fort, die aufgrund der unregelmäßigen Eigenschaften seines Bodens und in einigen Fällen die Topographie des Geländes nicht den Komfort und die Sicherheit bieten, die die Bevölkerung braucht. (German) / rank
 
Normal rank
Property / summary: Diese Phase des Mobilitätsplans von Torrão setzt die Verbesserung der Fußgängerzirkulationsbedingungen in einigen Straßen des historischen Zentrums von Torrão fort, die aufgrund der unregelmäßigen Eigenschaften seines Bodens und in einigen Fällen die Topographie des Geländes nicht den Komfort und die Sicherheit bieten, die die Bevölkerung braucht. (German) / qualifier
 
point in time: 13 December 2021
Timestamp+2021-12-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:28, 13 December 2021

Project Q2863353 in Portugal
Language Label Description Also known as
English
Torrão Mobility Plan – Phase 2
Project Q2863353 in Portugal

    Statements

    0 references
    65,680.0 Euro
    0 references
    77,271.0 Euro
    0 references
    85.0 percent
    0 references
    11 September 2020
    0 references
    26 February 2021
    0 references
    MUNICÍPIO DE ALCÁCER DO SAL
    0 references

    38°17'41.21"N, 8°13'19.74"W
    0 references
    Esta fase do plano de mobilidade do Torrão vem dar continuidade à melhoria das condições de circulação pedonal em algumas Ruas do Centro Histórico do Torrão que, pelas características irregulares do seu pavimento e, em alguns casos, pela topografia do terreno, não oferecem o conforto e a segurança que aquela população necessita. (Portuguese)
    0 references
    This phase of the mobility plan of Torrão continues to improve the conditions of pedestrian circulation in some Streets of the Historical Center of Torrão that, due to the irregular characteristics of its pavement and, in some cases, by the topography of the terrain, do not offer the comfort and safety that this population needs. (English)
    6 July 2021
    0 references
    Cette phase du plan de mobilité de Torrão poursuit l’amélioration des conditions de circulation des piétons dans certaines rues du Centre historique de Torrão qui, en raison des caractéristiques irrégulières de son plancher et, dans certains cas, de la topographie du terrain, n’offrent pas le confort et la sécurité dont la population a besoin. (French)
    4 December 2021
    0 references
    Diese Phase des Mobilitätsplans von Torrão setzt die Verbesserung der Fußgängerzirkulationsbedingungen in einigen Straßen des historischen Zentrums von Torrão fort, die aufgrund der unregelmäßigen Eigenschaften seines Bodens und in einigen Fällen die Topographie des Geländes nicht den Komfort und die Sicherheit bieten, die die Bevölkerung braucht. (German)
    13 December 2021
    0 references
    Alcácer do Sal, Torrão
    0 references

    Identifiers

    ALT20-04-1406-FEDER-000097
    0 references