St. Teotónio’s School Center (Q2862675): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Schulzentrum von S. Teotónio | |||||||||||||||
Property / summary | |||||||||||||||
Das Projekt sieht den Bau von 8 Klassenzimmern, 3 Mehrzweckräumen, Bibliothek und verschiedenen Einrichtungen zur Unterstützung des Betriebs der Ausrüstung sowie Spielbereiche im Freien und einen überdachten Balkon vor, befindet sich im höchsten Teil des Gehäuses, in dem sich EB 2.3 befindet, Halbmauern mit der Sporthalle und entwickelt sich auf 2 Etagen, wobei nur das obere Stockwerk von der Grenzstraße nach Norden sichtbar ist, wo Zugang hergestellt wird. (German) | |||||||||||||||
Property / summary: Das Projekt sieht den Bau von 8 Klassenzimmern, 3 Mehrzweckräumen, Bibliothek und verschiedenen Einrichtungen zur Unterstützung des Betriebs der Ausrüstung sowie Spielbereiche im Freien und einen überdachten Balkon vor, befindet sich im höchsten Teil des Gehäuses, in dem sich EB 2.3 befindet, Halbmauern mit der Sporthalle und entwickelt sich auf 2 Etagen, wobei nur das obere Stockwerk von der Grenzstraße nach Norden sichtbar ist, wo Zugang hergestellt wird. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Das Projekt sieht den Bau von 8 Klassenzimmern, 3 Mehrzweckräumen, Bibliothek und verschiedenen Einrichtungen zur Unterstützung des Betriebs der Ausrüstung sowie Spielbereiche im Freien und einen überdachten Balkon vor, befindet sich im höchsten Teil des Gehäuses, in dem sich EB 2.3 befindet, Halbmauern mit der Sporthalle und entwickelt sich auf 2 Etagen, wobei nur das obere Stockwerk von der Grenzstraße nach Norden sichtbar ist, wo Zugang hergestellt wird. (German) / qualifier | |||||||||||||||
point in time: 13 December 2021
|
Revision as of 09:12, 13 December 2021
Project Q2862675 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | St. Teotónio’s School Center |
Project Q2862675 in Portugal |
Statements
1,109,992.0 Euro
0 references
1,305,873.0 Euro
0 references
85.0 percent
0 references
16 April 2018
0 references
30 November 2020
0 references
MUNICÍPIO DE ODEMIRA
0 references
O projeto prevê a construção de 8 salas de aulas, 3 salas polivalentes, biblioteca e diversas instalações de apoio ao funcionamento do equipamento assim como zonas de jogo no exterior e um alpendre coberto, situa-se à cota mais alta do recinto onde se encontra instalada a EB 2,3, paredes meias com o pavilhão desportivo e desenvolve-se em 2 pisos, sendo só visível o piso superior a partir da rua confinante a norte, por onde se fará o acesso. (Portuguese)
0 references
The project provides for the construction of 8 classrooms, 3 multipurpose rooms, library and various facilities to support the operation of the equipment as well as play areas outside and a covered porch, is located at the highest level of the enclosure where EB 2.3 is installed, sock walls with the sports pavilion and develops on 2 floors, with only the upper floor visible from the street bordering north, through which access will be made. (English)
6 July 2021
0 references
Le projet prévoit la construction de 8 salles de classe, de 3 salles polyvalentes, d’une bibliothèque et d’installations diverses pour soutenir le fonctionnement de l’équipement, ainsi que d’espaces de jeux extérieurs et d’un balcon couvert, est situé au plus haut de l’enceinte où se trouve l’EB 2.3, à moitié murs avec la salle de sport et se développe sur 2 étages, avec seulement l’étage supérieur visible de la rue limitrophe au nord, où l’accès est fait. (French)
4 December 2021
0 references
Das Projekt sieht den Bau von 8 Klassenzimmern, 3 Mehrzweckräumen, Bibliothek und verschiedenen Einrichtungen zur Unterstützung des Betriebs der Ausrüstung sowie Spielbereiche im Freien und einen überdachten Balkon vor, befindet sich im höchsten Teil des Gehäuses, in dem sich EB 2.3 befindet, Halbmauern mit der Sporthalle und entwickelt sich auf 2 Etagen, wobei nur das obere Stockwerk von der Grenzstraße nach Norden sichtbar ist, wo Zugang hergestellt wird. (German)
13 December 2021
0 references
Odemira, São Teotónio
0 references
Identifiers
ALT20-02-5673-FEDER-000008
0 references