TO BE LINKED AT ALL TIMES (Q1874359): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
POUR TOUJOURS ÊTRE CONNECTÉ
Property / summary
 
LE PROJET IMPLIQUE LA RÉALISATION DE 1 CABLAGGIO EN CAT 6 COMPLET AVEC RACK 19 POUCES ET 20 STATIONS DANS LE LABORATOIRE DES GÉOMÈTRES DU DEUXIÈME ÉTAGE DU VICE-PRÉSIDENT BÂTIMENT 2 NOUVELLES DORSALES GIGABIT DU CENTRE ÉTOILE EXISTANT VERS LES 6 LABORATOIRES DE L’ÉTAGE 2ND VERS LE LABORATOIRE DU 1ST ÉTAGE ET AU REZ-DE-CHAUSSÉE À AULA MAGNA ET LE LABORATOIRE DE SOUTIEN 3 NOUVELLES DORSALES DANS LE BÂTIMENT DE LA PRÉSIDENCE DU CENTRE DE L’ÉTOILE AU REZ-DE-CHAUSSÉE VERS LAULA MAGNA ET LE RACK DU DEUXIÈME ÉTAGE 4 ARRIÈRE DU RACK 2 ÉTAGE À HALL 5 LA RÉALISATION DES DISPOSITIFS PASSIFS DE CÂBLAGE STRUCTURÉ LE DIMENSIONNEMENT DU PROJET ET LES CARACTÉRISTIQUES DE LA SOLUTION SERONT DE NATURE À ASSURER UNE ÉVOLUTIVITÉ ET UNE FLEXIBILITÉ ÉLEVÉES EN TENANT COMPTE DE L’ÉVOLUTION SUPPOSÉE DE LA CHARGE DE TRAVAIL DE L’ADMINISTRATION AU COURS DE LA PHASE DE CONCEPTION EN TENANT COMPTE DES OPTIMISATIONS POSSIBLES EN TERMES D’EFFICACITÉ ET D’ÉCONOMIE D’ÉNERGIE DU RÉSEAU LOCAL ET DES INFRASTRUCTURES CONNEXES OU DE LA FOURNITURE DE MATÉRIAUX ET D’ÉQUIPEMENTS (French)
Property / summary: LE PROJET IMPLIQUE LA RÉALISATION DE 1 CABLAGGIO EN CAT 6 COMPLET AVEC RACK 19 POUCES ET 20 STATIONS DANS LE LABORATOIRE DES GÉOMÈTRES DU DEUXIÈME ÉTAGE DU VICE-PRÉSIDENT BÂTIMENT 2 NOUVELLES DORSALES GIGABIT DU CENTRE ÉTOILE EXISTANT VERS LES 6 LABORATOIRES DE L’ÉTAGE 2ND VERS LE LABORATOIRE DU 1ST ÉTAGE ET AU REZ-DE-CHAUSSÉE À AULA MAGNA ET LE LABORATOIRE DE SOUTIEN 3 NOUVELLES DORSALES DANS LE BÂTIMENT DE LA PRÉSIDENCE DU CENTRE DE L’ÉTOILE AU REZ-DE-CHAUSSÉE VERS LAULA MAGNA ET LE RACK DU DEUXIÈME ÉTAGE 4 ARRIÈRE DU RACK 2 ÉTAGE À HALL 5 LA RÉALISATION DES DISPOSITIFS PASSIFS DE CÂBLAGE STRUCTURÉ LE DIMENSIONNEMENT DU PROJET ET LES CARACTÉRISTIQUES DE LA SOLUTION SERONT DE NATURE À ASSURER UNE ÉVOLUTIVITÉ ET UNE FLEXIBILITÉ ÉLEVÉES EN TENANT COMPTE DE L’ÉVOLUTION SUPPOSÉE DE LA CHARGE DE TRAVAIL DE L’ADMINISTRATION AU COURS DE LA PHASE DE CONCEPTION EN TENANT COMPTE DES OPTIMISATIONS POSSIBLES EN TERMES D’EFFICACITÉ ET D’ÉCONOMIE D’ÉNERGIE DU RÉSEAU LOCAL ET DES INFRASTRUCTURES CONNEXES OU DE LA FOURNITURE DE MATÉRIAUX ET D’ÉQUIPEMENTS (French) / rank
 
Normal rank
Property / summary: LE PROJET IMPLIQUE LA RÉALISATION DE 1 CABLAGGIO EN CAT 6 COMPLET AVEC RACK 19 POUCES ET 20 STATIONS DANS LE LABORATOIRE DES GÉOMÈTRES DU DEUXIÈME ÉTAGE DU VICE-PRÉSIDENT BÂTIMENT 2 NOUVELLES DORSALES GIGABIT DU CENTRE ÉTOILE EXISTANT VERS LES 6 LABORATOIRES DE L’ÉTAGE 2ND VERS LE LABORATOIRE DU 1ST ÉTAGE ET AU REZ-DE-CHAUSSÉE À AULA MAGNA ET LE LABORATOIRE DE SOUTIEN 3 NOUVELLES DORSALES DANS LE BÂTIMENT DE LA PRÉSIDENCE DU CENTRE DE L’ÉTOILE AU REZ-DE-CHAUSSÉE VERS LAULA MAGNA ET LE RACK DU DEUXIÈME ÉTAGE 4 ARRIÈRE DU RACK 2 ÉTAGE À HALL 5 LA RÉALISATION DES DISPOSITIFS PASSIFS DE CÂBLAGE STRUCTURÉ LE DIMENSIONNEMENT DU PROJET ET LES CARACTÉRISTIQUES DE LA SOLUTION SERONT DE NATURE À ASSURER UNE ÉVOLUTIVITÉ ET UNE FLEXIBILITÉ ÉLEVÉES EN TENANT COMPTE DE L’ÉVOLUTION SUPPOSÉE DE LA CHARGE DE TRAVAIL DE L’ADMINISTRATION AU COURS DE LA PHASE DE CONCEPTION EN TENANT COMPTE DES OPTIMISATIONS POSSIBLES EN TERMES D’EFFICACITÉ ET D’ÉCONOMIE D’ÉNERGIE DU RÉSEAU LOCAL ET DES INFRASTRUCTURES CONNEXES OU DE LA FOURNITURE DE MATÉRIAUX ET D’ÉQUIPEMENTS (French) / qualifier
 
point in time: 10 December 2021
Timestamp+2021-12-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:45, 10 December 2021

Project Q1874359 in Italy
Language Label Description Also known as
English
TO BE LINKED AT ALL TIMES
Project Q1874359 in Italy

    Statements

    0 references
    7,500.0 Euro
    0 references
    7,500.0 Euro
    0 references
    100.0 percent
    0 references
    26 January 2016
    0 references
    14 December 2016
    0 references
    14 December 2016
    0 references
    " ATERNO - MANTHONE' "
    0 references

    42°28'10.60"N, 14°12'21.35"E
    0 references
    IL PROGETTO PREVEDE LA REALIZZAZIONE DI 1 CABLAGGIO IN CAT 6 COMPLETO DI RACK 19 POLLICI E 20 POSTAZIONI NEL LABORATORIO GEOMETRI DEL SECONDO PIANO DELLA PALAZZINA VICE PRESIDENZA 2 NUOVE DORSALI GIGABIT DAL CENTRO STELLA ESISTENTE VERSO I 6 LABORATORI DEL 2 PIANO VERSO IL LABORATORIO DEL 1 PIANO ED AL PIANO TERRA IN AULA MAGNA E LABORATORIO DI SOSTEGNO 3 NUOVE DORSALI NELLEDIFICIO PRESIDENZA DAL CENTRO STELLA DEL PIANO TERRA VERSO LAULA MAGNA ED IL RACK DEL SECONDO PIANO 4 DORSALE DAL RACK 2 PIANO ALLAULA 5 REALIZZAZIONE DEL CABLAGGIO STRUTTURATO APPARATI PASSIVI IL DIMENSIONAMENTO DEL PROGETTO E LE CARATTERISTICHE DELLA SOLUZIONE SARANNO TALI DA ASSICURARE UNA ELEVATA SCALABILIT E FLESSIBILIT CHE TENGA CONTO DELLEVOLUZIONE PRESUNTA SUL CARICO DI LAVORO DELLAMMINISTRAZIONE NELLA FASE DI PROGETTAZIONE SI TENUTO CONTO DELLE POSSIBILI OTTIMIZZAZIONI IN TERMINI DI EFFICIENZA E DI RISPARMIO ENERGETICO DELLA RETE LOCALE E DELLE INFRASTRUTTURE COLLEGATE O FORNITURA DI MATERIALI ED ATTREZZAG (Italian)
    0 references
    THE PROJECT INVOLVES THE CONSTRUCTION OF 1 CABLING IN CAT 6 COMPLETE RACK-19 INCHES AND 20 LOCATIONS IN THE SURVEYORS OF THE SECOND FLOOR OF THE PALAZZINA VICE-PRESIDENT FOR THE 2-FLOOR OF THE 6-FLOOR AND THE 2 GROUND FLOOR FOR NEW BACKBONE NETWORKS IN THE 1 FLOOR AND TO THE GROUND FLOOR IN THE FLOOR IN THE CENTRE OF THE GROUND FLOOR AND THE RACK OF THE SECOND FLOOR 3 BACKBONE PLAN FOR MAGNA AND THE RACK OF THE SECOND FLOOR 4 FLOOR 2 ALLAAWU, 5 THE DESIGN OF THE STRUCTURED SYSTEM CABLING AND THE CHARACTERISTICS OF THE SOLUTION WILL BE SUCH AS TO ENSURE A HIGH SCALE OF EFFICIENCY AND ENERGY SAVING OF THE LOCAL NETWORK AND OF THE INFRASTRUCTURE CONNECTED WITH, OR SUPPLY OF, MATERIALS AND INFRASTRUCTURE (English)
    0 references
    LE PROJET IMPLIQUE LA RÉALISATION DE 1 CABLAGGIO EN CAT 6 COMPLET AVEC RACK 19 POUCES ET 20 STATIONS DANS LE LABORATOIRE DES GÉOMÈTRES DU DEUXIÈME ÉTAGE DU VICE-PRÉSIDENT BÂTIMENT 2 NOUVELLES DORSALES GIGABIT DU CENTRE ÉTOILE EXISTANT VERS LES 6 LABORATOIRES DE L’ÉTAGE 2ND VERS LE LABORATOIRE DU 1ST ÉTAGE ET AU REZ-DE-CHAUSSÉE À AULA MAGNA ET LE LABORATOIRE DE SOUTIEN 3 NOUVELLES DORSALES DANS LE BÂTIMENT DE LA PRÉSIDENCE DU CENTRE DE L’ÉTOILE AU REZ-DE-CHAUSSÉE VERS LAULA MAGNA ET LE RACK DU DEUXIÈME ÉTAGE 4 ARRIÈRE DU RACK 2 ÉTAGE À HALL 5 LA RÉALISATION DES DISPOSITIFS PASSIFS DE CÂBLAGE STRUCTURÉ LE DIMENSIONNEMENT DU PROJET ET LES CARACTÉRISTIQUES DE LA SOLUTION SERONT DE NATURE À ASSURER UNE ÉVOLUTIVITÉ ET UNE FLEXIBILITÉ ÉLEVÉES EN TENANT COMPTE DE L’ÉVOLUTION SUPPOSÉE DE LA CHARGE DE TRAVAIL DE L’ADMINISTRATION AU COURS DE LA PHASE DE CONCEPTION EN TENANT COMPTE DES OPTIMISATIONS POSSIBLES EN TERMES D’EFFICACITÉ ET D’ÉCONOMIE D’ÉNERGIE DU RÉSEAU LOCAL ET DES INFRASTRUCTURES CONNEXES OU DE LA FOURNITURE DE MATÉRIAUX ET D’ÉQUIPEMENTS (French)