Improving the communication connection between the islands of Uznam and Wolin in Świnoujście – construction of a tunnel under Świna (Q85957): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Tunnel à une nage est supposé dans la technologie de disque creux TBM, long. 1,44 km. Les autres éléments du système routier seront les suivants: routes d’accès au tunnel: Les routes d’accès de l’île d’Uznam au tunnel avec la station de péage, les routes d’accès de l’île Wolin au tunnel et au rond-point., translated_summary) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Verbesserung der Verkehrsverbindung zwischen den Inseln Uznam und Wolin in Świnoujście – Bau eines Tunnels unter Świna | |||||||||||||||
Property / summary | |||||||||||||||
Einschiffiger Tunnel wird in der TBM-Hohlscheibentechnologie lange angenommen. 1,44 km. Die anderen Elemente des Straßensystems werden sein: Zufahrtsstraßen zum Tunnel: Uznam Island Zufahrtsstraßen zum Tunnel mit Mautstation, Wolin Insel Zufahrt Straßen zum Tunnel und Kreisverkehr. (German) | |||||||||||||||
Property / summary: Einschiffiger Tunnel wird in der TBM-Hohlscheibentechnologie lange angenommen. 1,44 km. Die anderen Elemente des Straßensystems werden sein: Zufahrtsstraßen zum Tunnel: Uznam Island Zufahrtsstraßen zum Tunnel mit Mautstation, Wolin Insel Zufahrt Straßen zum Tunnel und Kreisverkehr. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Einschiffiger Tunnel wird in der TBM-Hohlscheibentechnologie lange angenommen. 1,44 km. Die anderen Elemente des Straßensystems werden sein: Zufahrtsstraßen zum Tunnel: Uznam Island Zufahrtsstraßen zum Tunnel mit Mautstation, Wolin Insel Zufahrt Straßen zum Tunnel und Kreisverkehr. (German) / qualifier | |||||||||||||||
point in time: 7 December 2021
|
Revision as of 09:23, 7 December 2021
Project Q85957 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the communication connection between the islands of Uznam and Wolin in Świnoujście – construction of a tunnel under Świna |
Project Q85957 in Poland |
Statements
775,677,722.67 zloty
0 references
912,562,026.68 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
31 March 2023
0 references
GMINA MIASTO ŚWINOUJŚCIE
0 references
Zakłada się wykonanie tunelu jednonawowego w technologii tarczy drążonej TBM, dł. 1,44 km. Pozostałymi elementami układu drogowego będą: drogi dojazdowe do tunelu: wyspa Uznam drogi dojazdowe do tunelu wraz ze stacją poboru opłat, wyspa Wolin drogi dojazdowe do tunelu oraz rondo. (Polish)
0 references
A single-nave tunnel is assumed to be constructed in the TBM hollow shield technology. It’s 1,44 miles. The other elements of the road system will be: access roads to the tunnel: I will recognise access roads to the tunnel with toll station, Wolin Island access roads to the tunnel and roundabout. (English)
14 October 2020
0 references
Tunnel à une nage est supposé dans la technologie de disque creux TBM, long. 1,44 km. Les autres éléments du système routier seront les suivants: routes d’accès au tunnel: Les routes d’accès de l’île d’Uznam au tunnel avec la station de péage, les routes d’accès de l’île Wolin au tunnel et au rond-point. (French)
30 November 2021
0 references
Einschiffiger Tunnel wird in der TBM-Hohlscheibentechnologie lange angenommen. 1,44 km. Die anderen Elemente des Straßensystems werden sein: Zufahrtsstraßen zum Tunnel: Uznam Island Zufahrtsstraßen zum Tunnel mit Mautstation, Wolin Insel Zufahrt Straßen zum Tunnel und Kreisverkehr. (German)
7 December 2021
0 references
Identifiers
POIS.04.02.00-00-0021/16
0 references