RISK MANAGEMENT AND FLOOD CONTROL IN THE WATER NETWORK AREA OF THE URBAN AREA OF NEW VILLAGE OF GAIA (Q2981676): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying budgets in portugal one item from slovenia) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
GESTION DES RISQUES ET LUTTE CONTRE LES INONDATIONS DANS LA ZONE DU RÉSEAU HYDROGRAPHIQUE DE LA ZONE URBAINE DE LA NOUVELLE VILLE DE GAIA | |||||||||||||||
Property / summary | |||||||||||||||
Cette application consiste en l’exécution des travaux du bassin de rétention de la rivière Horto, du bassin de rétention de la rivière Horto — Architecture paysagère et du renforcement de la capacité de drainage de la ligne d’eau Santa Marinha, dans les environs de Av. Pinto Santa Marinha Branches. (French) | |||||||||||||||
Property / summary: Cette application consiste en l’exécution des travaux du bassin de rétention de la rivière Horto, du bassin de rétention de la rivière Horto — Architecture paysagère et du renforcement de la capacité de drainage de la ligne d’eau Santa Marinha, dans les environs de Av. Pinto Santa Marinha Branches. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Cette application consiste en l’exécution des travaux du bassin de rétention de la rivière Horto, du bassin de rétention de la rivière Horto — Architecture paysagère et du renforcement de la capacité de drainage de la ligne d’eau Santa Marinha, dans les environs de Av. Pinto Santa Marinha Branches. (French) / qualifier | |||||||||||||||
point in time: 7 December 2021
|
Revision as of 06:58, 7 December 2021
Project Q2981676 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | RISK MANAGEMENT AND FLOOD CONTROL IN THE WATER NETWORK AREA OF THE URBAN AREA OF NEW VILLAGE OF GAIA |
Project Q2981676 in Portugal |
Statements
405,868.0 Euro
0 references
474,194.0 Euro
0 references
85.59 percent
0 references
8 May 2017
0 references
9 March 2020
0 references
MUNICÍPIO DE VILA NOVA DE GAIA
0 references
Q3000729 (Deleted Item)
0 references
A presente candidatura consiste na execução das empreitadas Bacia de Retenção do Rio Horto, Bacia de Retenção do Rio Horto - Arquitetura Paisagista e Reforço da Capacidade de Drenagem da Linha de Água de Santa Marinha, na envolvente à Av. Ramos Pinto Santa Marinha. (Portuguese)
0 references
The present application consists of the execution of the constructions of Retention of the Horto River, Alguidar de Retenção do Rio Horto – Architecture Landscape and Strengthening the Drainage Capacity of the Water Line of Santa Marinha, in the surroundings of Av. Ramos Pinto Santa Marinha. (English)
9 July 2021
0 references
Cette application consiste en l’exécution des travaux du bassin de rétention de la rivière Horto, du bassin de rétention de la rivière Horto — Architecture paysagère et du renforcement de la capacité de drainage de la ligne d’eau Santa Marinha, dans les environs de Av. Pinto Santa Marinha Branches. (French)
7 December 2021
0 references
Vila Nova de Gaia, União das freguesias de Santa Marinha e São Pedro da Afurada
0 references
Identifiers
POSEUR-02-1810-FC-000387
0 references