Closing down water supply systems in the municipality of Oliveira de Azeméis – 1st phase (Q2982450): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying budgets in portugal one item from slovenia) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
Fermeture des réseaux d’alimentation en eau dans la municipalité d’Oliveira de Azeméis — 1ère phase | |||||||||||||||
Property / summary | |||||||||||||||
L’objectif est de fermer les systèmes d’approvisionnement: dans le village de Cucujães dans les lieux de São Fôjo, Fonte Escura, Ínsua et Santa Luzia, grâce à l’extension du réseau d’approvisionnement en eau de la R7 et à Travanca de la R24. Les réseaux constituant le projet d’intervention ont la même origine (traitement du réservoir Crestuma-Lever à Lever ETA). (French) | |||||||||||||||
Property / summary: L’objectif est de fermer les systèmes d’approvisionnement: dans le village de Cucujães dans les lieux de São Fôjo, Fonte Escura, Ínsua et Santa Luzia, grâce à l’extension du réseau d’approvisionnement en eau de la R7 et à Travanca de la R24. Les réseaux constituant le projet d’intervention ont la même origine (traitement du réservoir Crestuma-Lever à Lever ETA). (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L’objectif est de fermer les systèmes d’approvisionnement: dans le village de Cucujães dans les lieux de São Fôjo, Fonte Escura, Ínsua et Santa Luzia, grâce à l’extension du réseau d’approvisionnement en eau de la R7 et à Travanca de la R24. Les réseaux constituant le projet d’intervention ont la même origine (traitement du réservoir Crestuma-Lever à Lever ETA). (French) / qualifier | |||||||||||||||
point in time: 7 December 2021
|
Revision as of 06:53, 7 December 2021
Project Q2982450 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Closing down water supply systems in the municipality of Oliveira de Azeméis – 1st phase |
Project Q2982450 in Portugal |
Statements
1,265,582.0 Euro
0 references
1,488,920.0 Euro
0 references
85.0 percent
0 references
30 January 2018
0 references
31 March 2021
0 references
MUNICÍPIO DE OLIVEIRA DE AZEMÉIS
0 references
Q3000779 (Deleted Item)
0 references
Pretende-se executar o fecho dos sistemas de abastecimento: na Vila de Cucujães nos lugares de São Fôjo, Fonte Escura, Ínsua e Santa Luzia, através do prolongamento da rede de abastecimento de água a partir de R7 e em Travanca a partir do R24. As redes que constituem o projeto de intervenção têm a mesma origem (Albufeira de Crestuma-Lever tratamento na ETA do Lever). (Portuguese)
0 references
It is intended to implement the closure of the supply systems: In the village of Cucujães in the places of São Fôjo, Fonte Escura, Ínsua and Santa Luzia, through the extension of the water supply network from R7 and Travanca from the R24. The networks that constitute the intervention project have the same origin (Albufeira de Crestuma-Lever treatment at ETA do Lever). (English)
9 July 2021
0 references
L’objectif est de fermer les systèmes d’approvisionnement: dans le village de Cucujães dans les lieux de São Fôjo, Fonte Escura, Ínsua et Santa Luzia, grâce à l’extension du réseau d’approvisionnement en eau de la R7 et à Travanca de la R24. Les réseaux constituant le projet d’intervention ont la même origine (traitement du réservoir Crestuma-Lever à Lever ETA). (French)
7 December 2021
0 references
Oliveira de Azeméis
0 references
Identifiers
POSEUR-03-2012-FC-000641
0 references