Elaboration of existent INFRAESTRUTURAL INFRASTERS IN THE NEW SYSTEMS – SAR Lezíria do Tejo and Almonda (Q2982041): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Élaboration du cadastre d’INFRASTRUCTURE EXISTANTE DANS LES SYSTÈMES EN PAYSHER — SAR Lezíria do Tejo e Almonda
Property / summary
 
L’opération se concentre sur la passation de contrats externes pour l’enquête d’information et le chargement sur la plate-forme SIG, le logiciel d’exploitation du réseau à basse altitude, le pont avec la plate-forme SIG et le passage des écrans finaux à l’environnement SIG. L’autorité de gestion (EG) assurera le suivi des travaux. L’audit technique des services fera l’objet d’un contrat dans le cadre d’une procédure distincte, étant donné que l’EG ne dispose pas d’équipes/d’équipements topographiques pour assurer la qualité finale. (French)
Property / summary: L’opération se concentre sur la passation de contrats externes pour l’enquête d’information et le chargement sur la plate-forme SIG, le logiciel d’exploitation du réseau à basse altitude, le pont avec la plate-forme SIG et le passage des écrans finaux à l’environnement SIG. L’autorité de gestion (EG) assurera le suivi des travaux. L’audit technique des services fera l’objet d’un contrat dans le cadre d’une procédure distincte, étant donné que l’EG ne dispose pas d’équipes/d’équipements topographiques pour assurer la qualité finale. (French) / rank
 
Normal rank
Property / summary: L’opération se concentre sur la passation de contrats externes pour l’enquête d’information et le chargement sur la plate-forme SIG, le logiciel d’exploitation du réseau à basse altitude, le pont avec la plate-forme SIG et le passage des écrans finaux à l’environnement SIG. L’autorité de gestion (EG) assurera le suivi des travaux. L’audit technique des services fera l’objet d’un contrat dans le cadre d’une procédure distincte, étant donné que l’EG ne dispose pas d’équipes/d’équipements topographiques pour assurer la qualité finale. (French) / qualifier
 
point in time: 7 December 2021
Timestamp+2021-12-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 06:46, 7 December 2021

Project Q2982041 in Portugal
Language Label Description Also known as
English
Elaboration of existent INFRAESTRUTURAL INFRASTERS IN THE NEW SYSTEMS – SAR Lezíria do Tejo and Almonda
Project Q2982041 in Portugal

    Statements

    0 references
    253,304.0 Euro
    0 references
    287,250.0 Euro
    0 references
    88.18 percent
    0 references
    30 November 2016
    0 references
    31 December 2020
    0 references
    AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
    0 references
    0 references
    0 references
    A operação centra-se na contratação externa do levantamento da informação e carregamento na plataforma SIG, do software de exploração da rede em baixa, ponte com a plataforma SIG, e da passagem de telas finais para ambiente SIG. A Entidade Gestora (EG) acompanhará os trabalhos. A auditoria técnica aos serviços será contratada em procedimento separado, já que a EG não dispõe de equipas/equipamentos de topografia que assegurem a qualidade final. (Portuguese)
    0 references
    The operation focuses on the external hiring of information and loading on the GIS platform, the low network exploration software, the bridge with the GIS platform, and the passage of end screens to the GIS environment. The Management Entity (EG) will accompany the work. The technical audit of the services will be contracted in a separate procedure, as GE does not have topography teams/equipment to ensure the final quality. (English)
    9 July 2021
    0 references
    L’opération se concentre sur la passation de contrats externes pour l’enquête d’information et le chargement sur la plate-forme SIG, le logiciel d’exploitation du réseau à basse altitude, le pont avec la plate-forme SIG et le passage des écrans finaux à l’environnement SIG. L’autorité de gestion (EG) assurera le suivi des travaux. L’audit technique des services fera l’objet d’un contrat dans le cadre d’une procédure distincte, étant donné que l’EG ne dispose pas d’équipes/d’équipements topographiques pour assurer la qualité finale. (French)
    7 December 2021
    0 references

    Identifiers

    POSEUR-03-2012-FC-000067
    0 references