Refurbishment of the entrance work and maturation pond of the Almeirim/Alpiarça treatment plant (Q2982019): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying budgets in portugal one item from slovenia) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
Rénovation de l’étang d’entrée et de maturation de la WWTP d’Almeirim/Alpiarça | |||||||||||||||
Property / summary | |||||||||||||||
L’objectif est de mettre en œuvre une opération de prétraitement de l’effluent et l’installation d’un système de dosage de l’acide chlorhydrique dilué à la surface de l’étang de maturation afin d’éviter la prolifération des algues. L’opération assure ainsi un traitement adéquat des effluents collectés pour une population de 25006 personnes servies et contribue à l’amélioration de la qualité des masses d’eau. (French) | |||||||||||||||
Property / summary: L’objectif est de mettre en œuvre une opération de prétraitement de l’effluent et l’installation d’un système de dosage de l’acide chlorhydrique dilué à la surface de l’étang de maturation afin d’éviter la prolifération des algues. L’opération assure ainsi un traitement adéquat des effluents collectés pour une population de 25006 personnes servies et contribue à l’amélioration de la qualité des masses d’eau. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L’objectif est de mettre en œuvre une opération de prétraitement de l’effluent et l’installation d’un système de dosage de l’acide chlorhydrique dilué à la surface de l’étang de maturation afin d’éviter la prolifération des algues. L’opération assure ainsi un traitement adéquat des effluents collectés pour une population de 25006 personnes servies et contribue à l’amélioration de la qualité des masses d’eau. (French) / qualifier | |||||||||||||||
point in time: 7 December 2021
|
Revision as of 06:45, 7 December 2021
Project Q2982019 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Refurbishment of the entrance work and maturation pond of the Almeirim/Alpiarça treatment plant |
Project Q2982019 in Portugal |
Statements
196,854.0 Euro
0 references
231,593.0 Euro
0 references
85.0 percent
0 references
30 June 2016
0 references
21 April 2017
0 references
AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
0 references
Pretende-se implementar uma operação de pré-tratamento do efluente e ainda a instalação de um sistema de dosagem de ácido clorídrico diluído na superfície da lagoa de maturação, de modo a evitar a proliferação de algas. A operação garante assim um adequado tratamento dos efluentes recolhidos para uma população de 25006 habitantes servidos e contribui para a melhoria da qualidade das massas de água. (Portuguese)
0 references
It is intended to implement a pre-treatment operation of the effluent and the installation of a diluted hydrochloric acid dosage system on the surface of the ripening pond in order to avoid algae proliferation. The operation thus ensures an adequate treatment of the effluents collected for a population of 25006 inhabitants served and contributes to the improvement of the quality of the water bodies. (English)
9 July 2021
0 references
L’objectif est de mettre en œuvre une opération de prétraitement de l’effluent et l’installation d’un système de dosage de l’acide chlorhydrique dilué à la surface de l’étang de maturation afin d’éviter la prolifération des algues. L’opération assure ainsi un traitement adéquat des effluents collectés pour une population de 25006 personnes servies et contribue à l’amélioration de la qualité des masses d’eau. (French)
7 December 2021
0 references
Alpiarça, Alpiarça
0 references
Identifiers
POSEUR-03-2012-FC-000040
0 references