Crossing of Saint-Louis — Studies and works on the TCSP track — Sequences 1 to 5 (Q3712969): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Die von der CIVIS durchgeführte Operation „Traversée de Saint-Louis – Studien und Arbeiten zum Ausbau der TCSP-Sequenzen 1 bis 5“ zielt auf die Schaffung eines rund 3,825 km langen TCSP im Herzen der Stadt Saint-Louis ab., translated_summary) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
Kruising van Saint-Louis — Studies en werken op het TCSP-spoor — Sequences 1 t/m 5 | |||||||||||||||
Property / summary | |||||||||||||||
Het doel van de CIVIS operatie „Traversée de Saint-Louis — Studies and works on the TCSP Track — Sequences 1 tot 5” was het creëren van een TCSP van ongeveer 3,825 km in het hart van de stad Saint-Louis. (Dutch) | |||||||||||||||
Property / summary: Het doel van de CIVIS operatie „Traversée de Saint-Louis — Studies and works on the TCSP Track — Sequences 1 tot 5” was het creëren van een TCSP van ongeveer 3,825 km in het hart van de stad Saint-Louis. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Het doel van de CIVIS operatie „Traversée de Saint-Louis — Studies and works on the TCSP Track — Sequences 1 tot 5” was het creëren van een TCSP van ongeveer 3,825 km in het hart van de stad Saint-Louis. (Dutch) / qualifier | |||||||||||||||
point in time: 7 December 2021
|
Revision as of 06:32, 7 December 2021
Project Q3712969 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | Crossing of Saint-Louis — Studies and works on the TCSP track — Sequences 1 to 5 |
Project Q3712969 in France |
Statements
11,038,419.31 Euro
0 references
18,397,365.52 Euro
0 references
60.0 percent
0 references
1 October 2016
0 references
30 June 2020
0 references
COMMUNAUTE INTERCOMMUNALE DES VILLES SOLIDAIRES (CIVIS)
0 references
L'opération "Traversée de Saint-Louis – Études et travaux relatifs aux aménagements de la voie TCSP- Séquences 1 à 5" portée par la CIVIS a pour objet la création d’un TCSP d'environ 3,825 km au cœur de la ville de Saint-Louis. (French)
0 references
The purpose of the CIVIS operation “Traversée de Saint-Louis — Studies and works on the TCSP Track — Sequences 1 to 5” was to create a TCSP of approximately 3.825 km in the heart of the city of Saint-Louis. (English)
22 November 2021
0 references
Die von der CIVIS durchgeführte Operation „Traversée de Saint-Louis – Studien und Arbeiten zum Ausbau der TCSP-Sequenzen 1 bis 5“ zielt auf die Schaffung eines rund 3,825 km langen TCSP im Herzen der Stadt Saint-Louis ab. (German)
2 December 2021
0 references
Het doel van de CIVIS operatie „Traversée de Saint-Louis — Studies and works on the TCSP Track — Sequences 1 tot 5” was het creëren van een TCSP van ongeveer 3,825 km in het hart van de stad Saint-Louis. (Dutch)
7 December 2021
0 references
Identifiers
RE0016504
0 references