Modernisation of the Czempire wastewater treatment plant by upgrading and upgrading the wastewater treatment plant in Jarogniewice and upgrading the existing wastewater pumping station in the town of Czempire and Borowo (Q135061): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The subject of the design is the modernization of the Czempiń sewage treatment plant (reconstruction and extension), construction of the gravity sewage system. in Jarogniewice, modernization of pumping stations in Czempiń and Borów. The scope of design includes: I-sewage treatment plant: 1) modernization of buildings: sewage pumping stations (e.g. replacement of pumps, fittings, reinforced concrete cover, equipment with gravity ventilation), bas...)
Property / summary
 
The subject of the design is the modernization of the Czempiń sewage treatment plant (reconstruction and extension), construction of the gravity sewage system. in Jarogniewice, modernization of pumping stations in Czempiń and Borów. The scope of design includes: I-sewage treatment plant: 1) modernization of buildings: sewage pumping stations (e.g. replacement of pumps, fittings, reinforced concrete cover, equipment with gravity ventilation), basket grating, screen sanding, sludge pumping station, sludge dewatering equipment, technical, technical and social, blowers, sludge thickener, Retention and averaging tank No. 2; 2) Replacement of the silo for lime; 3) Establishment of: sewage catchment station, retention and averaging tank No. 1, oxygen sludge stabilization, sheds above the sludge storage yard, vertical grate chamber, biol. Sequential reactor Nos. 1 and 2, sampling station, power generator; 4) liquidation of the contact chamber, circulation ditch, secondary settler; 5) repair of the existing outlet to the river; 6) expansion of internal communication routes with their lighting; 7) fences; II-construction of gravitational sewage system including, among others: execution of gravity pipelines, sewage wells, rings, kinets and gaskets, cast iron manholes at wells, anti-slip hatch clamps, gripping handrails; III-modernization technological installations pumping stations in Borów and Czempiń, including: Borowo demolition works (e.g. dismantling of: gravity channel, expansion well, pressure pipeline, internal installation technology of the pumping station, davit, control cabinet); earth and assembly (e.g. assembly of equipment technology inside and outside the tank, flange knife gate, inspection and expansion well, inflow channel); Czempiń - demolition works (e.g. dismantling of the above-ground sand pit with pipelines and engine, protective barriers, installation of internal technology) pumping station, control cabinet), earth and assembly (assembly: technological equipment, control cabinet, flange knife gate valves, wells with a grate) .Product products in 2018: 1 rebuilt sewage treatment plant; 3,16592km built and 0.01129km rebuilt (pumping stations ) kanaliz.sanit.e (English)
Property / summary: The subject of the design is the modernization of the Czempiń sewage treatment plant (reconstruction and extension), construction of the gravity sewage system. in Jarogniewice, modernization of pumping stations in Czempiń and Borów. The scope of design includes: I-sewage treatment plant: 1) modernization of buildings: sewage pumping stations (e.g. replacement of pumps, fittings, reinforced concrete cover, equipment with gravity ventilation), basket grating, screen sanding, sludge pumping station, sludge dewatering equipment, technical, technical and social, blowers, sludge thickener, Retention and averaging tank No. 2; 2) Replacement of the silo for lime; 3) Establishment of: sewage catchment station, retention and averaging tank No. 1, oxygen sludge stabilization, sheds above the sludge storage yard, vertical grate chamber, biol. Sequential reactor Nos. 1 and 2, sampling station, power generator; 4) liquidation of the contact chamber, circulation ditch, secondary settler; 5) repair of the existing outlet to the river; 6) expansion of internal communication routes with their lighting; 7) fences; II-construction of gravitational sewage system including, among others: execution of gravity pipelines, sewage wells, rings, kinets and gaskets, cast iron manholes at wells, anti-slip hatch clamps, gripping handrails; III-modernization technological installations pumping stations in Borów and Czempiń, including: Borowo demolition works (e.g. dismantling of: gravity channel, expansion well, pressure pipeline, internal installation technology of the pumping station, davit, control cabinet); earth and assembly (e.g. assembly of equipment technology inside and outside the tank, flange knife gate, inspection and expansion well, inflow channel); Czempiń - demolition works (e.g. dismantling of the above-ground sand pit with pipelines and engine, protective barriers, installation of internal technology) pumping station, control cabinet), earth and assembly (assembly: technological equipment, control cabinet, flange knife gate valves, wells with a grate) .Product products in 2018: 1 rebuilt sewage treatment plant; 3,16592km built and 0.01129km rebuilt (pumping stations ) kanaliz.sanit.e (English) / rank
 
Normal rank

Revision as of 09:57, 11 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation of the Czempire wastewater treatment plant by upgrading and upgrading the wastewater treatment plant in Jarogniewice and upgrading the existing wastewater pumping station in the town of Czempire and Borowo
Project in Poland financed by DG Regio

    Statements

    0 references
    8,338,705.42 zloty
    0 references
    2,001,289.3007999999 Euro
    13 January 2020
    0 references
    16,735,276.15 zloty
    0 references
    4,016,466.276 Euro
    13 January 2020
    0 references
    63.75 percent
    0 references
    24 July 2017
    0 references
    30 November 2018
    0 references
    GMINA CZEMPIŃ
    0 references
    Przedmiotem proj.jest modernizacja oczyszczalni ścieków Czempiń(przebudowa i rozbudowa),budowa kanalizacji grawit. w Jarogniewicach,modernizacja przepompowni w Czempiniu i Borowie.Zakres proj.obejmuje:I-oczyszczalnię ścieków:1)modernizację budynków:gł. przepompowni ścieków(m.in:wymiana pomp,armatury,wykonanie pokrywy żelbet.,wyposażenie w wentylację grawit.),kraty koszowej,sitopiaskowania,przepompowni osadu,urządzeń odwadniania osadu,techn.,techn.-socjal.,dmuchaw,zagęszczacza osadu,zbiornika retencyjno-uśredniającego nr2;2)wymianę silosa na wapno;3)powstanie:stacji zlewczej ścieków dowożonych,zbiornika retencyjno-uśredniającego nr 1,tlenowej stabilizacji osadu,wiaty nad placem składowania osadu,komory kraty pionowej,biol. reaktora sekwencyjnego nr1 i 2,stacji poboru prób,agregatu prądotw.;4)likwidację komory kontaktowej,rowu cyrkulacyjnego,osadnika wtórnego;5)naprawę istniejącego wylotu do rzeki;6)rozbudowę dróg komunikacji wew. z ich oświetleniem.;7)ogrodzenia;II-budowę kanalizacji grawitacyjnej obejmującą m.in.:wykonanie rurociągów grawit.,studni kanaliz.,kręgów,kinetów i uszczelek,włazów żeliwnych na studniach,klamer złazowych przeciwpoślizgowych,poręczy chwytnych;III-modernizację instalacji technolog. przepompowni w Borowie i Czempiniu obejmujące:Borowo-roboty rozbiórkowe(m.in.demontaż:kanału grawitacyjnego,studni rozprężnej,rurociągu tłocznego,instalacji technolog. wew.pompowni,żurawika,szafy sterowniczej);ziemne i montażowe(m.in.montaż wyposażenia technolog.wew. i na zew.zbiornika,zasuwy nożowej kołnierzowej,studni rewizyjnej i rozprężnej,kanału dopływowego);Czempiń-roboty rozbiórkowe(m.in.:demontaż:nadziemnego piaskownika z rurociągami i silnikiem,barierek ochronnych,instalacji technolog.wew.pompowni,szafy sterowniczej),ziemne i montażowe(montaż:wyposażenia technolog.,szafy sterowniczej,zasuw nożowych kołnierzowych,studni z kratą).Produkty proj. w 2018r.:1 przebudowana oczyszczalnia;3,16592km wybudowanej i 0,01129km przebudowanej(przepompownie)kanaliz.sanit. (Polish)
    0 references
    The subject of the design is the modernization of the Czempiń sewage treatment plant (reconstruction and extension), construction of the gravity sewage system. in Jarogniewice, modernization of pumping stations in Czempiń and Borów. The scope of design includes: I-sewage treatment plant: 1) modernization of buildings: sewage pumping stations (e.g. replacement of pumps, fittings, reinforced concrete cover, equipment with gravity ventilation), basket grating, screen sanding, sludge pumping station, sludge dewatering equipment, technical, technical and social, blowers, sludge thickener, Retention and averaging tank No. 2; 2) Replacement of the silo for lime; 3) Establishment of: sewage catchment station, retention and averaging tank No. 1, oxygen sludge stabilization, sheds above the sludge storage yard, vertical grate chamber, biol. Sequential reactor Nos. 1 and 2, sampling station, power generator; 4) liquidation of the contact chamber, circulation ditch, secondary settler; 5) repair of the existing outlet to the river; 6) expansion of internal communication routes with their lighting; 7) fences; II-construction of gravitational sewage system including, among others: execution of gravity pipelines, sewage wells, rings, kinets and gaskets, cast iron manholes at wells, anti-slip hatch clamps, gripping handrails; III-modernization technological installations pumping stations in Borów and Czempiń, including: Borowo demolition works (e.g. dismantling of: gravity channel, expansion well, pressure pipeline, internal installation technology of the pumping station, davit, control cabinet); earth and assembly (e.g. assembly of equipment technology inside and outside the tank, flange knife gate, inspection and expansion well, inflow channel); Czempiń - demolition works (e.g. dismantling of the above-ground sand pit with pipelines and engine, protective barriers, installation of internal technology) pumping station, control cabinet), earth and assembly (assembly: technological equipment, control cabinet, flange knife gate valves, wells with a grate) .Product products in 2018: 1 rebuilt sewage treatment plant; 3,16592km built and 0.01129km rebuilt (pumping stations ) kanaliz.sanit.e (English)
    0 references

    Identifiers

    RPWP.04.03.01-30-0044/16