Rehabilitation of the Public Space of Viana do Castelo – 7th Phase (Q2895683): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying budgets in portugal one item from slovenia) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
Réhabilitation de l’espace public Viana do Castelo — Étape 7 | |||||||||||||||
Property / summary | |||||||||||||||
L’Opération a deux actions, l’une se concentre sur deux Arus, le Front Ribeirinha et le Centre Historique. Le premier vise la réhabilitation de l’espace public, contribuant à sa revitalisation, par les externalités qui stimulent l’investissement privé, et le second vise la réhabilitation du patrimoine bâti. Cette opération s’inscrit dans le cadre d’une action prévue dans la proposition de reprogrammation de Pedu. (French) | |||||||||||||||
Property / summary: L’Opération a deux actions, l’une se concentre sur deux Arus, le Front Ribeirinha et le Centre Historique. Le premier vise la réhabilitation de l’espace public, contribuant à sa revitalisation, par les externalités qui stimulent l’investissement privé, et le second vise la réhabilitation du patrimoine bâti. Cette opération s’inscrit dans le cadre d’une action prévue dans la proposition de reprogrammation de Pedu. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L’Opération a deux actions, l’une se concentre sur deux Arus, le Front Ribeirinha et le Centre Historique. Le premier vise la réhabilitation de l’espace public, contribuant à sa revitalisation, par les externalités qui stimulent l’investissement privé, et le second vise la réhabilitation du patrimoine bâti. Cette opération s’inscrit dans le cadre d’une action prévue dans la proposition de reprogrammation de Pedu. (French) / qualifier | |||||||||||||||
point in time: 5 December 2021
|
Revision as of 17:15, 5 December 2021
Project Q2895683 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Rehabilitation of the Public Space of Viana do Castelo – 7th Phase |
Project Q2895683 in Portugal |
Statements
223,537.0 Euro
0 references
262,985.0 Euro
0 references
85.0 percent
0 references
15 June 2018
0 references
28 February 2019
0 references
MUNICÍPIO DE VIANA DO CASTELO
0 references
Q3000045 (Deleted Item)
0 references
A Operação tem duas ações uma incide sobre duas ARUs, a da Frente Ribeirinha e a do Centro Histórico. A primeira visa a reabilitação do espaço público, contribuindo para a sua revitalização, pelas externalidades que estimulam o investimento privado, e a segunda visa a reabilitação do património edificado. Esta operação integra uma acção prevista na proposta de reprogramação PEDU. (Portuguese)
0 references
The operation has two actions one focuses on two Arus, the Front Ribeirinha and the Historic Center. The first aims at the rehabilitation of the public space, contributing to its revitalisation, by the externalities that stimulate private investment, and the second aims at the rehabilitation of the built heritage. This operation is part of an action provided for in the Pedu reprogramming proposal. (English)
8 July 2021
0 references
L’Opération a deux actions, l’une se concentre sur deux Arus, le Front Ribeirinha et le Centre Historique. Le premier vise la réhabilitation de l’espace public, contribuant à sa revitalisation, par les externalités qui stimulent l’investissement privé, et le second vise la réhabilitation du patrimoine bâti. Cette opération s’inscrit dans le cadre d’une action prévue dans la proposition de reprogrammation de Pedu. (French)
5 December 2021
0 references
Viana do Castelo
0 references
Identifiers
NORTE-05-2316-FEDER-000141
0 references