Enhancement of soft modes (bike and pedestrian) in proximity movements 1st stage (Q2894739): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying budgets in portugal one item from slovenia) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
Amélioration des modes souples (vélos et piétons) à proximité 1ère phase | |||||||||||||||
Property / summary | |||||||||||||||
L’opération consiste en la création de pistes cyclables et l’accès piétonnier au village d’Armamar, des espaces exclusifs pour les vélos (création de pistes cyclables) et la requalification et l’exécution des zones piétonnes. La création de la piste cyclable et des accès piétonniers reliera le quartier industriel et résidentiel de Travanca (cabine de l’hôpital) au village d’Armamar. (French) | |||||||||||||||
Property / summary: L’opération consiste en la création de pistes cyclables et l’accès piétonnier au village d’Armamar, des espaces exclusifs pour les vélos (création de pistes cyclables) et la requalification et l’exécution des zones piétonnes. La création de la piste cyclable et des accès piétonniers reliera le quartier industriel et résidentiel de Travanca (cabine de l’hôpital) au village d’Armamar. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L’opération consiste en la création de pistes cyclables et l’accès piétonnier au village d’Armamar, des espaces exclusifs pour les vélos (création de pistes cyclables) et la requalification et l’exécution des zones piétonnes. La création de la piste cyclable et des accès piétonniers reliera le quartier industriel et résidentiel de Travanca (cabine de l’hôpital) au village d’Armamar. (French) / qualifier | |||||||||||||||
point in time: 5 December 2021
|
Revision as of 16:43, 5 December 2021
Project Q2894739 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Enhancement of soft modes (bike and pedestrian) in proximity movements 1st stage |
Project Q2894739 in Portugal |
Statements
247,522.0 Euro
0 references
291,203.0 Euro
0 references
85.0 percent
0 references
1 January 2019
0 references
31 December 2019
0 references
MUNICÍPIO DE ARMAMAR
0 references
A operação consiste na criação de ciclovia e acessos pedonais de acesso à vila de Armamar, serão criadas areas exclusivas para bicicletas (criação de ciclovia) e requalificação e execução de áreas pedonais. as deslocações normais passam a ser realizadas de modo mais suave e sustentável. A criação da ciclovia e acessos pedonais farão a ligação da zona industrial e de zona habitacional de Travanca(bica do hospital) à vila de Armamar. (Portuguese)
0 references
The operation consists of the creation of bike paths and pedestrian access to the village of Armamar, exclusive areas will be created for bicycles (creation of bike path) and requalification and execution of pedestrian areas. The normal journeys are made in a smoother and more sustainable way. The creation of the bike path and pedestrian access will connect the industrial zone and the housing zone of Travanca (hospital staff) to the village of Armamar. (English)
8 July 2021
0 references
L’opération consiste en la création de pistes cyclables et l’accès piétonnier au village d’Armamar, des espaces exclusifs pour les vélos (création de pistes cyclables) et la requalification et l’exécution des zones piétonnes. La création de la piste cyclable et des accès piétonniers reliera le quartier industriel et résidentiel de Travanca (cabine de l’hôpital) au village d’Armamar. (French)
5 December 2021
0 references
Armamar, Armamar
0 references
Identifiers
NORTE-03-1406-FEDER-000113
0 references