New wastewater pipeline project from the new EBAR del Río de Oro to the UWWTP, with integration of the bike path between the Port Noray and the South Dam in accordance with the Melilla Sustainable Urban Mobility Plan (Q3215170): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
Nouveau projet de canalisation d’eaux usées de la nouvelle EBAR del Río de Oro à l’UWWTP, avec intégration de la piste cyclable entre le Port Noray et le barrage Sud conformément au Plan de Mobilité Urbaine Durable Melilla | |||||||||||||||
Property / summary | |||||||||||||||
Assistance technique et travaux pour le nouveau projet de gazoduc de traitement des eaux usées de la nouvelle EBAR del Río de Oro à l’UWWTP, avec intégration de la piste cyclable entre le Port Noray et le barrage Sud conformément au Plan de Mobilité Urbaine Durable Melilla. (French) | |||||||||||||||
Property / summary: Assistance technique et travaux pour le nouveau projet de gazoduc de traitement des eaux usées de la nouvelle EBAR del Río de Oro à l’UWWTP, avec intégration de la piste cyclable entre le Port Noray et le barrage Sud conformément au Plan de Mobilité Urbaine Durable Melilla. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Assistance technique et travaux pour le nouveau projet de gazoduc de traitement des eaux usées de la nouvelle EBAR del Río de Oro à l’UWWTP, avec intégration de la piste cyclable entre le Port Noray et le barrage Sud conformément au Plan de Mobilité Urbaine Durable Melilla. (French) / qualifier | |||||||||||||||
point in time: 5 December 2021
|
Revision as of 08:32, 5 December 2021
Project Q3215170 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | New wastewater pipeline project from the new EBAR del Río de Oro to the UWWTP, with integration of the bike path between the Port Noray and the South Dam in accordance with the Melilla Sustainable Urban Mobility Plan |
Project Q3215170 in Spain |
Statements
253,497.54 Euro
0 references
316,871.92 Euro
0 references
80.0 percent
0 references
2 December 2016
0 references
23 February 2017
0 references
CIUDAD AUTONOMA DE MELILLA
0 references
52001
0 references
Asistencia técnica y obras del proyecto de nueva tubería de impulsión de aguas residuales desde la nueva EBAR del Río de Oro a la EDAR, con integración del carril bici entre el Puerto Noray y el Dique Sur conforme al Plan de Movilidad Urbana Sostenible de Melilla. (Spanish)
0 references
Technical assistance to the project's works managemen and project's work of new wastewater discharge pipeline project from the new EBAR of the Rio de Oro to the EDAR, with integration of the bike lane between the Noray Port and the South Dyke according to Melilla's Sustainable Urban Mobility Plan (English)
0 references
Assistance technique et travaux pour le nouveau projet de gazoduc de traitement des eaux usées de la nouvelle EBAR del Río de Oro à l’UWWTP, avec intégration de la piste cyclable entre le Port Noray et le barrage Sud conformément au Plan de Mobilité Urbaine Durable Melilla. (French)
5 December 2021
0 references
Melilla
0 references
Identifiers
OP4.5.1_02_C001
0 references