Requalification of the School Park – 2nd Phase (Q2881910): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying budgets in portugal one item from slovenia) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
Requalification du parc scolaire — Étape 2 | |||||||||||||||
Property / summary | |||||||||||||||
Compte tenu de la réalité du parc scolaire Concelhio, il est essentiel de mener des interventions dans la réhabilitation des infrastructures, la réparation des infiltrations, des fissures, des peintures de plafonds et de murs, la rénovation des cuisines et des cafétérias ainsi que des installations sanitaires et la requalification des espaces extérieurs et des terrains de jeu. (French) | |||||||||||||||
Property / summary: Compte tenu de la réalité du parc scolaire Concelhio, il est essentiel de mener des interventions dans la réhabilitation des infrastructures, la réparation des infiltrations, des fissures, des peintures de plafonds et de murs, la rénovation des cuisines et des cafétérias ainsi que des installations sanitaires et la requalification des espaces extérieurs et des terrains de jeu. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Compte tenu de la réalité du parc scolaire Concelhio, il est essentiel de mener des interventions dans la réhabilitation des infrastructures, la réparation des infiltrations, des fissures, des peintures de plafonds et de murs, la rénovation des cuisines et des cafétérias ainsi que des installations sanitaires et la requalification des espaces extérieurs et des terrains de jeu. (French) / qualifier | |||||||||||||||
point in time: 5 December 2021
|
Revision as of 08:05, 5 December 2021
Project Q2881910 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Requalification of the School Park – 2nd Phase |
Project Q2881910 in Portugal |
Statements
277,315.0 Euro
0 references
554,630.0 Euro
0 references
50.0 percent
0 references
1 June 2017
0 references
14 January 2019
0 references
MUNICIPIO DE SETUBAL
0 references
Considerando a realidade do Parque Escolar concelhio torna-se imprescindível a realização de intervenções a nível de reabilitação das infraestruturas, a reparação de infiltrações, fissuras, pinturas de tetos e paredes, a remodelação de cozinhas e refeitórios assim como de instalações sanitárias e a requalificação de espaços exteriores e campos de jogos. (Portuguese)
0 references
Considering the reality of the Municipal School Park, it is essential to carry out interventions in the level of infrastructure rehabilitation, the repair of infiltrations, cracks, ceiling and wall paintings, the remodeling of kitchens and cafeterias as well as sanitary facilities and the requalification of outdoor spaces and playing fields. (English)
7 July 2021
0 references
Compte tenu de la réalité du parc scolaire Concelhio, il est essentiel de mener des interventions dans la réhabilitation des infrastructures, la réparation des infiltrations, des fissures, des peintures de plafonds et de murs, la rénovation des cuisines et des cafétérias ainsi que des installations sanitaires et la requalification des espaces extérieurs et des terrains de jeu. (French)
5 December 2021
0 references
Setúbal, União das freguesias de Setúbal (São Julião, Nossa Senhora da Anunciada e Santa Maria da Graça)
0 references
Identifiers
LISBOA-07-5673-FEDER-000037
0 references