Improving the quality of sports infrastructure in general schools in Ostródzki county (Q132899): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Le projet envisage d’adapter l’actuel, inadéquat aux besoins des parties prenantes de l’infrastructure sportive scolaire dans 3 écoles secondaires supérieures pour lesquelles le district d’Ostródzki est l’organe directeur, à savoir LO NR II W ZSZ IM.S.PETOFI W Ostróda, LO NR I dans le SIGC et la clinique PSYCH-pedag. A Morąg, LO No II IM. L.KRUCZKOWSKI W ZSL IN THE SEA.Le projet sera mis en œuvre dans la ville d’Ostróda et la ville de Morąg dans...)
(‎Removed claim: contained in NUTS (P1845): Elbląski (Q2577194), Removing duplicate contained in NUTS)
Property / contained in NUTS
 
Property / contained in NUTS: Elbląski / rank
Normal rank
 

Revision as of 19:44, 3 December 2021

Project Q132899 in Poland
Language Label Description Also known as
English
Improving the quality of sports infrastructure in general schools in Ostródzki county
Project Q132899 in Poland

    Statements

    0 references
    352,151.65 zloty
    0 references
    84,516.40 Euro
    13 January 2020
    0 references
    424,330.22 zloty
    0 references
    101,839.25 Euro
    13 January 2020
    0 references
    82.99 percent
    0 references
    1 March 2018
    0 references
    31 July 2019
    0 references
    POWIAT OSTRÓDZKI
    0 references

    53°54'43.2"N, 19°55'40.8"E
    0 references

    53°42'10.1"N, 19°57'46.4"E
    0 references
    Projekt zakłada dostosowanie obecnej, nieadekwatnej do potrzeb interesariuszy przyszkolnej infrastruktury sportowej w 3 szkołach na poziomie ponadgimnazjalnym dla których Powiat Ostródzki stanowi organ prowadzący. tj.LO NR II W ZSZ IM.S.PETOFI W OSTRÓDZIE, LO NR I w ZSZiO i PORADNI PSYCH– PEDAG. W MORĄGU, LO NR II IM. L.KRUCZKOWSKIEGO W ZSL W MORĄGU.Proj.realizowany będzie na terenie miasta Ostróda oraz miasta Morąg w powiecie ostródzkim. Zakres rzeczowy proj.zgodny z analizą wariantów, diagnozą oraz analizą potrzeb interesariuszy to: Modernizacja i remont sali gimn.wraz z zapleczem sanitarnym w LO nr 2 w ZSZ im. S. Petofi w Ostródzie roboty rozbiórkowe i przyg. renowacja nawierzchni Sali wymiana stolarki drzwiowej tynki i okładziny wym.oświetlenia wym.urządzeń sanitarnych Modernizacja i remont sali gimn. w LO nr I w ZSZiO i Poradni Psych.– Pedag.w Morągu roboty ziemne, fundamentowe i izolacje posadzki i ściany zewn. dach roboty wykończ. i zewn. elewacje wymiana sufitu podwiesz. Remont i modernizacja infrastruktury sportowej w LO w ZSL w Morągu Sala gimn.: roboty rozbiórkowe i przyg. stolarka drzwiowa tynki, posadzki i okładziny wym.oświetlenia wymiana urządzeń sanit. Boisko: roboty rozbiórkowe i przyg. wykonan.nawierzchni sportowej wykonan.nawierzchni trawiastej wykonanie odwodnienia trakt pieszy montaż siedzisk Powyższe remonty zostaną uzupełnione o zakup wyposażenia sportowego. W proj. zostaną także zrealizowane takie zadania jak: promocja proj.,nadzór inwestorski oraz zarządzanie cyklem proj. Zostanie powołany zespół proj.Stosowane będzie prawo PZP oraz klauzule społeczne. Cele proj.są zgodne z SZOOP RPO WiM, Oś 9 Dostęp do wysokiej jakości usług publicznych,Działanie 9.3 Infrastruktura edukacyjna, Poddziałanie 9.3.4 Infrastruktura edukacji ogólnokształcącej. Proj.przyczyni się do podniesienia jakości kształcenia w placówkach nim objętych w związku z tym wpisuje się w założenia osi i działania. (Polish)
    0 references
    The project involves adapting the current, inadequate to the needs of stakeholders at school sports infrastructure in 3 schools at upper secondary level for which the Orodzki District is the leading body. i.e.LO NR II in the ZSZ IM.S.PETOFI W Ostróda, LO NR I in the USSR and the PSYCH- PEDAG clinic. In Morąg, LO NR II IM.L.KRUCZKOWSKI IN ZSL IN MORĄG.The project will be carried out in the city of Ostróda and the town of Morąg in the district of Ostorodzki. The material scope of the project in accordance with the analysis of options, diagnosis and analysis of the needs of stakeholders are: Modernisation and renovation of the gym room together with the sanitary facilities in LO No. 2 in ZSZ im. S. Petofi in Ostróda demolition works and nag. renovation of the floor surface replacement of the door carpentry of plaster and linings e.g. ceilings of the floor and flooring. sanitary equipment. Modernisation and renovation of the gym. in LO No. I in ZSZiO and Poradni Psych. Renovation and modernisation of sports infrastructure in LO in ZSL in Morąg gymnasium: demolition works and fixtures door carpentry plasters, floors and linings, etc. illumination of sanitary equipment. The field: demolition works and performances of sports surface made of grass surface execution of dehydration pedestrian seat assembly The above renovations will be supplemented by the purchase of sports equipment. The project will also carry out tasks such as: promotion of the project, investor supervision and management of the project cycle. The project team will be set up.The law of the Polish People’s Party and social clauses will be applied. The project objectives are consistent with SZOOP RPO WiM, Axis 9 Access to high quality public services, Action 9.3 Education infrastructure, Submeasure 9.3.4 General education infrastructure. The project will contribute to improving the quality of education in the institutions covered by it, therefore, in line with the objectives of the axis and activities. (English)
    21 October 2020
    0 references
    Le projet envisage d’adapter l’actuel, inadéquat aux besoins des parties prenantes de l’infrastructure sportive scolaire dans 3 écoles secondaires supérieures pour lesquelles le district d’Ostródzki est l’organe directeur, à savoir LO NR II W ZSZ IM.S.PETOFI W Ostróda, LO NR I dans le SIGC et la clinique PSYCH-pedag. A Morąg, LO No II IM. L.KRUCZKOWSKI W ZSL IN THE SEA.Le projet sera mis en œuvre dans la ville d’Ostróda et la ville de Morąg dans le district d’Ostródzki. Le champ d’application du projet est cohérent avec l’analyse des variantes, le diagnostic et l’analyse des besoins des parties prenantes: Modernisation et rénovation du gymnase avec installations sanitaires à LO No 2 à ZSZ im Petofi à Ostróda travaux de démolition et rénovation de la surface de la salle de remplacement du plâtre de menuiserie de porte et revêtement de l’éclairage de l’équipement sanitaire Modernisation et rénovation du gymnase à LO No I à ZSZiO et Poradni Psych. — Pedag. dans les terrasses de Morąg, fondations et isolation des planchers et murs extérieurs du toit des finitions et façades extérieures le remplacement du plafond sera suspendu. Rénovation et modernisation de l’infrastructure sportive de LO à ZSL dans le gymnase Morąg: travaux de démolition et de menuiserie de portes plâtres, sols et doublures du remplacement de l’éclairage du sol de l’équipement sanitaire. Emplacement: travaux de démolition et clous réalisés sur la surface de sport made.grass performance de surface de la voie de drainage assemblage piétonnier des sièges Les rénovations ci-dessus seront complétées par l’achat d’équipements sportifs. Le projet réalisera également des tâches telles que: promotion des projets, supervision des investisseurs et gestion du cycle de projet. Une équipe de projet sera mise en place. La loi PZP et les clauses sociales seront appliquées. Les objectifs du projet sont conformes à SZOOP ROP WiM, Axe 9 Accès à des services publics de haute qualité,Action 9.3 Infrastructures éducatives, Sous-mesure 9.3.4 Infrastructures pour l’enseignement général. Le projet contribuera à l’amélioration de la qualité de l’éducation dans les institutions qu’il couvre, conformément aux objectifs des axes et des activités. (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.09.03.04-28-0008/17
    0 references