“Modernisation of Odrzański locks on the section in the management of Gliwice Gliwice – adaptation to the third class of the waterway” Phase II (Q85875): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Le projet consiste à achever des travaux de construction complets menant à la modernisation de deux écluses sur le canal Gliwice — Łabędy et Dzierżno. L’exécution des travaux réduira de 7 minutes la période de fermeture de l’écluse de Łabędy et de 10 minutes sur la Śkuzie Dzierżno., translated_summary) |
(Removed claim: contained in NUTS (P1845): Gliwicki (Q2577158), Removing duplicate contained in NUTS) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Gliwicki / rank | |||
Revision as of 11:00, 3 December 2021
Project Q85875 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | “Modernisation of Odrzański locks on the section in the management of Gliwice Gliwice – adaptation to the third class of the waterway” Phase II |
Project Q85875 in Poland |
Statements
38,024,318.84 zloty
0 references
44,734,492.76 zloty
0 references
85.0 percent
0 references
1 January 2016
0 references
31 December 2019
0 references
PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE
0 references
Projekt polega na wykoniu kompleksowych prac budowlanych prowadzących do modernizacji dwóch śluz na Kanale Gliwickim - Łabędy i Dzierżno. Wykonanie prac pozwoli na skrócenie okresu śluzowania na śluzie Łabędy o 7 minut, a na śkuzie Dzierżno o 10 minut. (Polish)
0 references
The project consists of the completion of complex construction works leading to the modernisation of two locks on the Gliwice Canal – the Elbe and Dzierżno. The completion of the works will reduce the locking period at the Swan mucus by 7 minutes, and on Śkuza Dzierżno by 10 minutes. (English)
14 October 2020
0 references
Le projet consiste à achever des travaux de construction complets menant à la modernisation de deux écluses sur le canal Gliwice — Łabędy et Dzierżno. L’exécution des travaux réduira de 7 minutes la période de fermeture de l’écluse de Łabędy et de 10 minutes sur la Śkuzie Dzierżno. (French)
30 November 2021
0 references
Identifiers
POIS.03.02.00-00-0001/16
0 references