Construction of the medium pressure gas network Kutno-Krośniewice with gas station (Q86145): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Le projet consiste en la construction d’un gazoduc et d’une station gazière de réduction de pression I°, ainsi que de l’installation ACPiA et de l’installation de télémétrie, et de la connexion des installations au système d’élimination des gaz. Paramètres de base du pipeline à construire: Pipeline Dz225 PE L= 14 320 m et pipeline Dz180 PE L=10940 m. Paramètres de base de la station de réduction prévue: — Débit Q = 2000 Nm3/h — Pression d’entrée...) |
(Removed claim: contained in NUTS (P1845): Skierniewicki (Q2577179), Removing duplicate contained in NUTS) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Skierniewicki / rank | |||
Revision as of 10:17, 3 December 2021
Project Q86145 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the medium pressure gas network Kutno-Krośniewice with gas station |
Project Q86145 in Poland |
Statements
4,775,023.75 zloty
0 references
5,617,675.0 zloty
0 references
85.0 percent
0 references
30 June 2017
0 references
31 August 2018
0 references
DUON DYSTRYBUCJA SP. Z O.O.
0 references
Projekt polega na budowie gazociągu średn. ciśnienia i stacji gazowej redukcyjnej I°, wraz z instalacją AKPiA oraz telemetryczną, oraz podłączeniu obiektów do systemu dyspozycji gazem. Podstawowe parametry planowanego do wybudowania gazociągu: Gazociąg Dz225 PE L= 14320m i Gazociąg Dz180 PE L= 10940m. Podstawowe parametry planowanej stacji redukcyjnej: - Przepustowość Q = 2000 Nm3/h - Maks. ciśn. dolotowe MOPwej = 5,5 MPa - Maks. ciśn. wyjściowe MOPwyj = 0,5 MPa - Min. ciśn. wyjściowe Pwyjmin = 0,15 MPa (Polish)
0 references
The project consists of the construction of the I° medium pressure pipeline and gas station, together with the ACP and telemetry installation, and the connection of the facilities to the gas dispensing system. Basic parameters planned for the construction of the pipeline: Gas pipeline Dz225 PE L= 14320 m and gas pipeline Dz180 PE L= 10940 m. Basic parameters of the planned reduction station: — Pass rate Q = 2000 Nm3/h – ILO max. inlet pressure = 5.5 MPa – Maximum output MOP = 0.5 MPa – Min. output pressure Pwyjmin = 0,15 MPa (English)
14 October 2020
0 references
Le projet consiste en la construction d’un gazoduc et d’une station gazière de réduction de pression I°, ainsi que de l’installation ACPiA et de l’installation de télémétrie, et de la connexion des installations au système d’élimination des gaz. Paramètres de base du pipeline à construire: Pipeline Dz225 PE L= 14 320 m et pipeline Dz180 PE L=10940 m. Paramètres de base de la station de réduction prévue: — Débit Q = 2000 Nm3/h — Pression d’entrée maximale MOPwa = 5.5 MPa — Pression de sortie maximale MOPwy = 0,5 MPa — Pression de sortie minimale Pwyjmin = 0,15 MPa (French)
30 November 2021
0 references
Identifiers
POIS.07.01.00-00-0026/16
0 references