“Industrial hall for cold processing of metals” in UPI I-016109, sq. 5 m. Locky, village. Prolesia, obsht. Bozhurishte (Q3832015): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
(‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
Property / coordinate location
 
42°46'44.90"N, 23°8'44.16"E
Latitude42.7791399
Longitude23.1456002
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 42°46'44.90"N, 23°8'44.16"E / rank
 
Normal rank

Revision as of 09:56, 3 December 2021

Project Q3832015 in Bulgaria
Language Label Description Also known as
English
“Industrial hall for cold processing of metals” in UPI I-016109, sq. 5 m. Locky, village. Prolesia, obsht. Bozhurishte
Project Q3832015 in Bulgaria

    Statements

    0 references
    247,415.96 Bulgarian lev
    0 references
    126,182.14 Euro
    1 December 2021
    0 references
    582,155.22 Bulgarian lev
    0 references
    296,899.16 Euro
    1 December 2021
    0 references
    0.42 percent
    0 references
    8 September 2020
    0 references
    8 September 2023
    0 references
    0 references

    42°46'44.90"N, 23°8'44.16"E
    0 references
    БИМЕТА ЕООД предвижда изграждането на база с РЗП 819,00 кв.м. в имот собственост на инвеститора. Проектът предвижда сградата да бъде разположена в югозападната част на парцела. В обемно отношение проектното предложение сградата да бъде от три части, състоящи се от производствен корпус, битова част и котелно. Във функционално отношение производствената част на сградата е решена като едноетажно еднопространствено хале,като в най-югозападната му част е обособен склад за готовата продукция. Проектът предвижда в югоизточната част на производственото хале, като самостоятелен обем долепено до халето да се изгради котелно на пелети за нуждите на базата. За обслужване работещите на територията на базата е разработена и битовата сграда, която е долепена до основното хале по неговата североизточна фасада. Проекта предвижда битовата сграда да бъде на два етажа, като на първият етаж са разположени едно битово помещение за работниците, две тоалетни с предверие/умивалня/ към тях и стая за почивка. Посредством вътрешно стълбище се достига до вторият етаж на битовата сграда, където се намира офисът на ръководителя производство и санитарен възел към него. БИМЕТА ЕООД залага на изграждането на обект, водещ до висока енергийна ефективност, с което да се намалят вредните влияния в околната среда. Проектираната за изграждане сграда с предвидената система за топлинна изолация отговаря на изискванията на чл. 4, ал. 5, т. 4 на Наредба 7 "За енергйна ефективност на сгради".Спецификата на работа напроизовдственото предприятие изисква квалифициран персонал с опит и умения в сферата на студена обработка на метали.С инвестициите по проекта кандидатът ще създаде 10 работни места, с което заявява ползване на приоритет 6.1 За всяко ново създадено работно място, в резултат от реализиране на инвестицията, кандидатът ще получи 3 точки, но не повече от 30. (Bulgarian)
    0 references
    BIMETA Ltd. provides for the construction of a base with an area of 819.00 sq.m. in property owned by the investor. The project envisages the building to be located in the south-western part of the plot. In terms of volume, the design proposal for the building to be made of three parts consisting of a production housing, a household part and a boiler room. Functionally, the production part of the building is designed as a single-storey hall, and in the most south-western part is a separate warehouse for the finished products. In the south-eastern part of the production hall, the project envisages building a pellet boiler for the base as an independent volume attached to the hall. For service the employees on the territory of the base have also developed the household building, which is attached to the main hall along its northeast façade. The project envisages the household building to be on two floors, with one living room for workers on the first floor, two toilets with an entrance hall/meeting room/to them and a rest room. By means of an internal staircase, you can reach the second floor of the household building, where the manufacturing manager’s office and bathroom are located. BIMETA Ltd. relies on the construction of a site leading to high energy efficiency, thereby reducing the harmful effects in the environment. The building designed for construction with the planned thermal insulation system complies with the requirements of Article 4(5)(4) of Ordinance 7 “For Energy Efficiency of Buildings”. The operating specification of the manufacturing enterprise requires qualified staff with experience and skills in the field of cold metal processing.With the investment in the project, the applicant will create 10 jobs, thus requesting the use of priority 6.1 For each newly created workplace, as a result of the realisation of the investment, the applicant will receive 3 points, but not more than 30 points. (English)
    2 December 2021
    0 references
    Bimeta Ltd. prévoit la construction d’une base d’une superficie de 819,00 m² dans une propriété appartenant à l’investisseur. Le projet prévoit que le bâtiment sera situé dans la partie sud-ouest de la parcelle. En termes de volume, la proposition de conception du bâtiment à réaliser en trois parties composées d’un logement de production, d’une partie domestique et d’une chaufferie. Fonctionnellement, la partie de production du bâtiment est conçue comme une salle de plain-pied, et dans la partie la plus sud-ouest est un entrepôt séparé pour les produits finis. Dans la partie sud-est de la salle de production, le projet prévoit la construction d’une chaudière à granulés pour la base comme un volume indépendant attaché au hall. Pour le service les employés sur le territoire de la base ont également développé le bâtiment domestique, qui est attaché à la salle principale le long de sa façade nord-est. Le projet prévoit que le bâtiment domestique soit sur deux étages, avec un salon pour les travailleurs au premier étage, deux toilettes avec un hall d’entrée/salle de réunion/pour eux et une salle de repos. Au moyen d’un escalier intérieur, vous pouvez atteindre le deuxième étage de l’immeuble, où se trouvent le bureau et la salle de bains du directeur de la fabrication. Bimeta Ltd. s’appuie sur la construction d’un site menant à une efficacité énergétique élevée, réduisant ainsi les effets nocifs sur l’environnement. Le bâtiment conçu pour la construction avec le système d’isolation thermique prévu est conforme aux exigences de l’article 4, paragraphe 5, point 4, de l’ordonnance 7 «Pour l’efficacité énergétique des bâtiments». La spécification d’exploitation de l’entreprise de fabrication nécessite un personnel qualifié ayant une expérience et des compétences dans le domaine de la transformation des métaux froids.Avec l’investissement dans le projet, le demandeur créera 10 emplois, demandant ainsi l’utilisation de la priorité 6.1 Pour chaque lieu de travail nouvellement créé, à la suite de la réalisation de l’investissement, le demandeur recevra 3 points, mais pas plus de 30 points. (French)
    3 December 2021
    0 references
    с.Пролеша
    0 references

    Identifiers

    BG06RDNP001-6.004-0149
    0 references