Increase the production capacity of dry transformers (Q3833938): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
(‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
Property / coordinate location
 
42°37'42.38"N, 22°52'56.32"E
Latitude42.628442
Longitude22.882311866811
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 42°37'42.38"N, 22°52'56.32"E / rank
 
Normal rank

Revision as of 09:55, 3 December 2021

Project Q3833938 in Bulgaria
Language Label Description Also known as
English
Increase the production capacity of dry transformers
Project Q3833938 in Bulgaria

    Statements

    0 references
    332,491.1 Bulgarian lev
    0 references
    169,570.46 Euro
    1 December 2021
    0 references
    664,982.2 Bulgarian lev
    0 references
    339,140.92 Euro
    1 December 2021
    0 references
    0.5 percent
    0 references
    12 February 2020
    0 references
    19 March 2021
    0 references
    0 references

    42°37'42.38"N, 22°52'56.32"E
    0 references
    Проектът предвижда да се разшири производствения капацитет на един от основните участъци на предприятието за сухи трансформатори ТМС-Трафо и съответно да се увеличат приходите от продажби на тези продукти за вътрешния и външния пазар. Ще бъде изпълнена една дейност - придобиване на нова високотехнологична машина за навиване на алуминиеви и медни фолиеви проводници. Машината е предназначена за участък „Бобини високо напрежение“, където се осъществява навиване на намотките високо напрежение за сухи трансформатори. Общата стойност на проекта, в т.ч. финансовата помощ е 340 000 евро или 664 982 лв. Срокът за реализация на проекта е 10 месеца.Очакваните резултати са - въведена в експлоатация нова бобинажна машина за намотки - 1 бр. и увеличен капацитет на производствен участък „Бобини високо напрежение“ и на предприятието като цяло. След въвеждане на предвидената в проекта машина, производственият капацитет на този участък ще се увеличи от 1 комплект намотки за 8 ч. на приблизително 2,5 комплекта намотки за същото време, което означава, че общият капацитет за производство на сухи трансформатори като краен продукт, при непроменени други условия, ще се увеличи от 2 сухи трансформатора на ден на 4,5 на ден. Това ще представлява 125% увеличение на производствения капацитет на предприятието спрямо 2018 г. На тази база е разработен и бизнес планът на предприятието, обхващащ периода след реализацията на проекта. (Bulgarian)
    0 references
    The project envisages to expand the production capacity of one of the main sections of the TMS-Trafo dry transformer company and consequently to increase the revenues from sales of these products to the domestic and external markets. One activity will be carried out — acquisition of a new high-tech winding machine for aluminum and copper foil wires. The machine is designed for section “Bobini high voltage”, where winding of high voltage windings is carried out for dry transformers. The total cost of the project, including the financial assistance is EUR 340,000 or BGN 664 982. The project implementation period is 10 months. The expected results are — a new winding coil machine — 1 pcs. and increased capacity of the production section “Bobini high voltage” and of the plant as a whole. After the introduction of the machine provided for in the project, the production capacity of this section will increase from 1 set of windings per 8 hours to approximately 2.5 sets of windings at the same time, which means that the total production capacity of dry transformers as a finished product, under other unaltered conditions, will increase from 2 dry transformers per day to 4.5 per day. This will represent a 125 % increase in the production capacity of the enterprise compared to 2018. On this basis, the business plan of the enterprise has also been developed, covering the period after the implementation of the project. (English)
    2 December 2021
    0 references
    Le projet prévoit d’accroître la capacité de production de l’un des principaux tronçons de la société de transformateurs secs TMS-Trafo et, par conséquent, d’augmenter les recettes provenant des ventes de ces produits sur les marchés intérieurs et extérieurs. Une activité sera réalisée: l’acquisition d’une nouvelle machine d’enroulement de haute technologie pour les fils de feuilles d’aluminium et de cuivre. La machine est conçue pour la section «Bobini haute tension», où l’enroulement des enroulements à haute tension est effectué pour les transformateurs secs. Le coût total du projet, y compris l’aide financière, s’élève à 340 000 EUR ou 664 982 BGN. La période de mise en œuvre du projet est de 10 mois. Les résultats escomptés sont — une nouvelle bobineuse — 1 pcs. et une capacité accrue de la section de production «Bobini haute tension» et de l’ensemble de l’usine. Après l’introduction de la machine prévue dans le projet, la capacité de production de cette section passera d’un ensemble de bobinages par 8 heures à environ 2,5 ensembles d’enroulements en même temps, ce qui signifie que la capacité de production totale des transformateurs secs en tant que produit fini, dans d’autres conditions inchangées, passera de 2 transformateurs secs par jour à 4,5 par jour. Cela représente une augmentation de 125 % de la capacité de production de l’entreprise par rapport à 2018. Sur cette base, le plan d’affaires de l’entreprise a également été élaboré, couvrant la période suivant la mise en œuvre du projet. (French)
    3 December 2021
    0 references
    Перник
    0 references

    Identifiers

    BG16RFOP002-2.040-1335
    0 references