Introduction of energy efficiency measures in multi-apartment buildings in Botevgrad — stage 4 (Q3884175): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Changed label, description and/or aliases in en, and other parts: Adding en translations)
label / enlabel / en
 
Introduction of energy efficiency measures in multi-apartment buildings in Botevgrad — stage 4
Property / summary
 
The present project proposal “Introduction of energy efficiency measures in buildings from the residential infrastructure of the town of Botevgrad, stage IV” is under Priority Axis 2,Support for energy efficiency in support centres in peripheral areas of the OP “Regions in Growth”. Within the framework of the project for five buildings from the residential infrastructure of the municipality of Botevgrad, following a decision of the general meeting of the condominium, measures will be taken and implemented to improve their energy efficiency and measures related to improving access for people with disabilities, in accordance with the requirements of Regulation No 4/01.07.2009. The necessary energy saving measures for each building are reflected in EE audit reports accompanied by a valid energy performance certificate made by a licensed person. The measures aim at raising the energy consumption class, increasing energy savings and ensuring an affordable environment. And the five multi-family residential buildings, subject to intervention — Residential Block, Orhanie, located in Vasil Levski residential complex, bl.1, Harmonia Residential Block, located on 3, Vasil Levski Str., Residential Block, Bozhenishki Urvich2, located on 2 Bozhenishki Urvich Blvd. ent.A, B and C, Residential bloc, Druzhba, located on 16 Bulgaria Blvd. and Residential Block “Sunce”, located in Vasil Levski, bl.21, are in poor technical condition. For the successful implementation of the project, the Beneficiary will conduct procedures, in accordance with the requirements of the Public Procurement Act for the selection of contractors for the activities of the project, will participate with its representatives in the Project Team and will monitor the strict implementation of the planned activities. As a result of the implementation of the project of the territory of the Municipality in five multi-family residential buildings in the town of Botevgrad, better living conditions for 121 inhabitants of the town of Botevgrad will be created. The buildings reconstructed and renovated will meet the modern requirements. (English)
Property / summary: The present project proposal “Introduction of energy efficiency measures in buildings from the residential infrastructure of the town of Botevgrad, stage IV” is under Priority Axis 2,Support for energy efficiency in support centres in peripheral areas of the OP “Regions in Growth”. Within the framework of the project for five buildings from the residential infrastructure of the municipality of Botevgrad, following a decision of the general meeting of the condominium, measures will be taken and implemented to improve their energy efficiency and measures related to improving access for people with disabilities, in accordance with the requirements of Regulation No 4/01.07.2009. The necessary energy saving measures for each building are reflected in EE audit reports accompanied by a valid energy performance certificate made by a licensed person. The measures aim at raising the energy consumption class, increasing energy savings and ensuring an affordable environment. And the five multi-family residential buildings, subject to intervention — Residential Block, Orhanie, located in Vasil Levski residential complex, bl.1, Harmonia Residential Block, located on 3, Vasil Levski Str., Residential Block, Bozhenishki Urvich2, located on 2 Bozhenishki Urvich Blvd. ent.A, B and C, Residential bloc, Druzhba, located on 16 Bulgaria Blvd. and Residential Block “Sunce”, located in Vasil Levski, bl.21, are in poor technical condition. For the successful implementation of the project, the Beneficiary will conduct procedures, in accordance with the requirements of the Public Procurement Act for the selection of contractors for the activities of the project, will participate with its representatives in the Project Team and will monitor the strict implementation of the planned activities. As a result of the implementation of the project of the territory of the Municipality in five multi-family residential buildings in the town of Botevgrad, better living conditions for 121 inhabitants of the town of Botevgrad will be created. The buildings reconstructed and renovated will meet the modern requirements. (English) / rank
 
Normal rank
Property / summary: The present project proposal “Introduction of energy efficiency measures in buildings from the residential infrastructure of the town of Botevgrad, stage IV” is under Priority Axis 2,Support for energy efficiency in support centres in peripheral areas of the OP “Regions in Growth”. Within the framework of the project for five buildings from the residential infrastructure of the municipality of Botevgrad, following a decision of the general meeting of the condominium, measures will be taken and implemented to improve their energy efficiency and measures related to improving access for people with disabilities, in accordance with the requirements of Regulation No 4/01.07.2009. The necessary energy saving measures for each building are reflected in EE audit reports accompanied by a valid energy performance certificate made by a licensed person. The measures aim at raising the energy consumption class, increasing energy savings and ensuring an affordable environment. And the five multi-family residential buildings, subject to intervention — Residential Block, Orhanie, located in Vasil Levski residential complex, bl.1, Harmonia Residential Block, located on 3, Vasil Levski Str., Residential Block, Bozhenishki Urvich2, located on 2 Bozhenishki Urvich Blvd. ent.A, B and C, Residential bloc, Druzhba, located on 16 Bulgaria Blvd. and Residential Block “Sunce”, located in Vasil Levski, bl.21, are in poor technical condition. For the successful implementation of the project, the Beneficiary will conduct procedures, in accordance with the requirements of the Public Procurement Act for the selection of contractors for the activities of the project, will participate with its representatives in the Project Team and will monitor the strict implementation of the planned activities. As a result of the implementation of the project of the territory of the Municipality in five multi-family residential buildings in the town of Botevgrad, better living conditions for 121 inhabitants of the town of Botevgrad will be created. The buildings reconstructed and renovated will meet the modern requirements. (English) / qualifier
 
point in time: 2 December 2021
Timestamp+2021-12-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:45, 2 December 2021

Project Q3884175 in Bulgaria
Language Label Description Also known as
English
Introduction of energy efficiency measures in multi-apartment buildings in Botevgrad — stage 4
Project Q3884175 in Bulgaria

    Statements

    0 references
    898,907.12 Bulgarian lev
    0 references
    458,442.63 Euro
    1 December 2021
    0 references
    1,057,537.8 Bulgarian lev
    0 references
    539,344.28 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    1 November 2016
    0 references
    7 December 2020
    0 references
    0 references
    Настоящото проектно предложение „Въвеждане на мерки за енергийна ефективност в сгради от жилищната инфраструктура на гр. Ботевград, етап IV“ е по приоритетна ос 2 ,,Подкрепа за енергийната ефективност в опорни центрове в периферните райони“ на ОП ,,Региони в растеж“. В рамките на проекта за пет сгради от жилищната инфраструктура на община Ботевград, след решение на общото събрание на етажната собственост ще бъдат предприети и изпълнени мерки за повишаване на енергийната им ефективност и мерки, свързани с подобряване достъпа на хора с увреждания, в съответствие изискванията на Наредба №4/01.07.2009г. Необходимите енергоспестяващи мерки за всяка отделна сграда са отразени в доклади от обследване за ЕЕ, придружени с валиден сертификат за енергийни характеристики, направени от лицензирано за това лице. Мерките целят повишаване на класа на енергопотребление, увеличаване на енергийни спестявания и осигуряване на достъпна среда. И петте многофамилни жилищни сгради, обект на интервенция – Жилищен блок ,,Орхание“, находящ се в ж.к. ”Васил Левски“, бл.1, Жилищен блок „Хармония", находящ се на ул. „Васил Левски“, №3, Жилищен блок ,,Боженишки урвич2, находящ се на бул. ”Боженишки урвич” №2, вх.А, Б и В, Жилищен блок ,,Дружба“, находящ се на бул. ”България” №16 и Жилищен блок „Слънце", находящ се в ж.к. ”Васил Левски“, бл.21, са в лошо техническо състояние. За успешното изпълнение на проекта Бенефициентът ще проведе процедури, съгласно изискванията на ЗОП за избор на изпълнители по дейностите на проекта, ще участва със свои представители в Екипа на проекта и ще контролира стриктното изпълнение на заложените дейности. В резултат от изпълнение на проекта на тероторията на Общината в пет многофамилни жилищни сгради в гр. Ботевград ще се създадат по-добри условия за живот на 121 жители на гр. Ботевград. Сградите реконструирани и обновени ще отговарят на съвременните изисквания. (Bulgarian)
    0 references
    The present project proposal “Introduction of energy efficiency measures in buildings from the residential infrastructure of the town of Botevgrad, stage IV” is under Priority Axis 2,Support for energy efficiency in support centres in peripheral areas of the OP “Regions in Growth”. Within the framework of the project for five buildings from the residential infrastructure of the municipality of Botevgrad, following a decision of the general meeting of the condominium, measures will be taken and implemented to improve their energy efficiency and measures related to improving access for people with disabilities, in accordance with the requirements of Regulation No 4/01.07.2009. The necessary energy saving measures for each building are reflected in EE audit reports accompanied by a valid energy performance certificate made by a licensed person. The measures aim at raising the energy consumption class, increasing energy savings and ensuring an affordable environment. And the five multi-family residential buildings, subject to intervention — Residential Block, Orhanie, located in Vasil Levski residential complex, bl.1, Harmonia Residential Block, located on 3, Vasil Levski Str., Residential Block, Bozhenishki Urvich2, located on 2 Bozhenishki Urvich Blvd. ent.A, B and C, Residential bloc, Druzhba, located on 16 Bulgaria Blvd. and Residential Block “Sunce”, located in Vasil Levski, bl.21, are in poor technical condition. For the successful implementation of the project, the Beneficiary will conduct procedures, in accordance with the requirements of the Public Procurement Act for the selection of contractors for the activities of the project, will participate with its representatives in the Project Team and will monitor the strict implementation of the planned activities. As a result of the implementation of the project of the territory of the Municipality in five multi-family residential buildings in the town of Botevgrad, better living conditions for 121 inhabitants of the town of Botevgrad will be created. The buildings reconstructed and renovated will meet the modern requirements. (English)
    2 December 2021
    0 references
    Ботевград
    0 references

    Identifiers

    BG16RFOP001-2.001-0176
    0 references