“Design and construction of additional infrastructure (installation for pretreatment of municipal waste and composting plant for separately collected biodegradable and/or green waste) for development of the regional waste management system of the region of Troyan, including the municipalities of Troyan and Apriltsi” (Q3888196): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Changed label, description and/or aliases in en, and other parts: Adding en translations)
label / enlabel / en
 
“Design and construction of additional infrastructure (installation for pretreatment of municipal waste and composting plant for separately collected biodegradable and/or green waste) for development of the regional waste management system of the region of Troyan, including the municipalities of Troyan and Apriltsi”
Property / summary
 
The project proposal for receiving a grant under procedure BG16M1OP002-2.002 “Combined procedure for the design and construction of composting installations and installations for pre-treatment of municipal waste” under Priority Axis 2 of Operational Programme “Environment 2014-2020” is aimed at taking measures to improve the management of municipal waste in accordance with the national waste management plan. Sustainable management of municipal waste will be achieved through investments in the design and construction of: composting plant for separately collected green waste together with the provision of the necessary equipment, facilities and equipment for separate collection of green waste; installation for pre-treatment of mixed collected municipal waste, as well as the accompanying infrastructure to them. Composing installation for separately collected green waste will have a capacity of 2 200 t/y. The necessary equipment, facilities and equipment for separate collection of green waste (110 containers, 2 specialised vehicles for collection of green waste, mobile shredder with telescopic loader and mobile sieve) will be provided. An installation for pre-treatment of mixed collected household waste with a capacity of 6 300 t/y will be built and the necessary accompanying infrastructure at the site (street with width of 10 m, length of about 100 m); sewerage U 300 with a length of about 300 m.; plumbing f 110 with a length of about 4 m). (English)
Property / summary: The project proposal for receiving a grant under procedure BG16M1OP002-2.002 “Combined procedure for the design and construction of composting installations and installations for pre-treatment of municipal waste” under Priority Axis 2 of Operational Programme “Environment 2014-2020” is aimed at taking measures to improve the management of municipal waste in accordance with the national waste management plan. Sustainable management of municipal waste will be achieved through investments in the design and construction of: composting plant for separately collected green waste together with the provision of the necessary equipment, facilities and equipment for separate collection of green waste; installation for pre-treatment of mixed collected municipal waste, as well as the accompanying infrastructure to them. Composing installation for separately collected green waste will have a capacity of 2 200 t/y. The necessary equipment, facilities and equipment for separate collection of green waste (110 containers, 2 specialised vehicles for collection of green waste, mobile shredder with telescopic loader and mobile sieve) will be provided. An installation for pre-treatment of mixed collected household waste with a capacity of 6 300 t/y will be built and the necessary accompanying infrastructure at the site (street with width of 10 m, length of about 100 m); sewerage U 300 with a length of about 300 m.; plumbing f 110 with a length of about 4 m). (English) / rank
 
Normal rank
Property / summary: The project proposal for receiving a grant under procedure BG16M1OP002-2.002 “Combined procedure for the design and construction of composting installations and installations for pre-treatment of municipal waste” under Priority Axis 2 of Operational Programme “Environment 2014-2020” is aimed at taking measures to improve the management of municipal waste in accordance with the national waste management plan. Sustainable management of municipal waste will be achieved through investments in the design and construction of: composting plant for separately collected green waste together with the provision of the necessary equipment, facilities and equipment for separate collection of green waste; installation for pre-treatment of mixed collected municipal waste, as well as the accompanying infrastructure to them. Composing installation for separately collected green waste will have a capacity of 2 200 t/y. The necessary equipment, facilities and equipment for separate collection of green waste (110 containers, 2 specialised vehicles for collection of green waste, mobile shredder with telescopic loader and mobile sieve) will be provided. An installation for pre-treatment of mixed collected household waste with a capacity of 6 300 t/y will be built and the necessary accompanying infrastructure at the site (street with width of 10 m, length of about 100 m); sewerage U 300 with a length of about 300 m.; plumbing f 110 with a length of about 4 m). (English) / qualifier
 
point in time: 2 December 2021
Timestamp+2021-12-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:45, 2 December 2021

Project Q3888196 in Bulgaria
Language Label Description Also known as
English
“Design and construction of additional infrastructure (installation for pretreatment of municipal waste and composting plant for separately collected biodegradable and/or green waste) for development of the regional waste management system of the region of Troyan, including the municipalities of Troyan and Apriltsi”
Project Q3888196 in Bulgaria

    Statements

    0 references
    3,357,680.81 Bulgarian lev
    0 references
    1,712,417.21 Euro
    1 December 2021
    0 references
    4,466,040.42 Bulgarian lev
    0 references
    2,277,680.61 Euro
    1 December 2021
    0 references
    0.75 percent
    0 references
    20 December 2017
    0 references
    30 September 2021
    0 references
    0 references
    Проектното предложение за получаване на безвъзмездна финансова помощ по процедура BG16M1OР002-2.002 "Комбинирана процедура за проектиране и изграждане на компостиращи инсталации и на инсталации за предварително третиране на битови отпадъци" по приоритетна ос 2 на Оперативна програма "Околна среда 2014-2020 г." е насочено към предприемане на мерки за подобряване управлението на битовите отпадъци в съответствие с националния план за управление на отпадъците.Устойчивото управление на битовите отпадъци ще бъде постигнато чрез инвестиции в проектиране и изграждане на: компостираща инсталация за разделно събрани зелени отпадъци заедно с осигуряване на необходимото оборудване, съоръжения и техника за разделно събиране на зелените отпадъци; инсталация за предварително третиране на смесено събрани битови отпадъци, както и на съпътстващата инфраструктура към тях.Компостираща инсталация за разделно събрани зелени отпадъци ще бъде с капацитет 2200 т/г. Ще бъде осигурено необходимото оборудване, съоръжения и техника за разделно събиране на зелените отпадъци (110 броя контейнери, 2 броя специализирани автомобили за събиране на зелени отпадъци, мобилен шредер с телескопичен товарач и мобилно сито).Ще бъде изградена инсталация за предварително третиране на смесено събрани битови отпадъци с капацитет 6300 т/г. Ще бъде изградена и необходимата съпътстващата инфраструктура към площадката (улица с ширина 10 м., дължина около 100 м; канализация ф 300 с дължина около 300 м.; водопровод ф 110 с дължина около 4 м). (Bulgarian)
    0 references
    The project proposal for receiving a grant under procedure BG16M1OP002-2.002 “Combined procedure for the design and construction of composting installations and installations for pre-treatment of municipal waste” under Priority Axis 2 of Operational Programme “Environment 2014-2020” is aimed at taking measures to improve the management of municipal waste in accordance with the national waste management plan. Sustainable management of municipal waste will be achieved through investments in the design and construction of: composting plant for separately collected green waste together with the provision of the necessary equipment, facilities and equipment for separate collection of green waste; installation for pre-treatment of mixed collected municipal waste, as well as the accompanying infrastructure to them. Composing installation for separately collected green waste will have a capacity of 2 200 t/y. The necessary equipment, facilities and equipment for separate collection of green waste (110 containers, 2 specialised vehicles for collection of green waste, mobile shredder with telescopic loader and mobile sieve) will be provided. An installation for pre-treatment of mixed collected household waste with a capacity of 6 300 t/y will be built and the necessary accompanying infrastructure at the site (street with width of 10 m, length of about 100 m); sewerage U 300 with a length of about 300 m.; plumbing f 110 with a length of about 4 m). (English)
    2 December 2021
    0 references
    Троян
    0 references

    Identifiers

    BG16M1OP002-2.002-0005
    0 references