“Renewal and implementation of energy efficiency measures in the building of the District Office "Fire Safety and Protection of the Population" in Kozloduy (Q3885499): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Changed label, description and/or aliases in en, and other parts: Adding en translations)
label / enlabel / en
 
“Renewal and implementation of energy efficiency measures in the building of the District Office "Fire Safety and Protection of the Population" in Kozloduy
Property / summary
 
The project provides for the implementation of energy efficiency measures for the municipal property building, granted for free use to the District Office “Fire Safety and Protection of the Population” (RSPBZN), Kozloduy — a territorial structure of the Ministry of Interior. The condition in which the building is not in conformity with the requirements for energy efficiency under Ordinance 7 of 2004 on energy efficiency of buildings, as the building should have at least the energy consumption class “C” and at the time of the audit it has class “E”. The target group of the project is 10 people — employees of the RSPBZN. The implementation of the project aims to improve the energy efficiency of public buildings; the elimination of electricity losses; reduction of harmful emissions into the atmosphere.Expected results of the implementation of the project: — Improving the comfort of living in public buildings and achieving the statutory parameters of the environment for heating and lighting; — Optimisation of the budgetary costs resulting from the energy savings achieved by the implemented energy efficiency measures compared to those laid down for previous periods; — Extended service life of the public infrastructure and their installations and facilities; — Reduction of carbon emissions from public infrastructure.The main activities of the project are: Engineering (design, together with author’s supervision and construction); Construction supervision; Organisation and management of the project; Publicity and visualisation; Audit. (English)
Property / summary: The project provides for the implementation of energy efficiency measures for the municipal property building, granted for free use to the District Office “Fire Safety and Protection of the Population” (RSPBZN), Kozloduy — a territorial structure of the Ministry of Interior. The condition in which the building is not in conformity with the requirements for energy efficiency under Ordinance 7 of 2004 on energy efficiency of buildings, as the building should have at least the energy consumption class “C” and at the time of the audit it has class “E”. The target group of the project is 10 people — employees of the RSPBZN. The implementation of the project aims to improve the energy efficiency of public buildings; the elimination of electricity losses; reduction of harmful emissions into the atmosphere.Expected results of the implementation of the project: — Improving the comfort of living in public buildings and achieving the statutory parameters of the environment for heating and lighting; — Optimisation of the budgetary costs resulting from the energy savings achieved by the implemented energy efficiency measures compared to those laid down for previous periods; — Extended service life of the public infrastructure and their installations and facilities; — Reduction of carbon emissions from public infrastructure.The main activities of the project are: Engineering (design, together with author’s supervision and construction); Construction supervision; Organisation and management of the project; Publicity and visualisation; Audit. (English) / rank
 
Normal rank
Property / summary: The project provides for the implementation of energy efficiency measures for the municipal property building, granted for free use to the District Office “Fire Safety and Protection of the Population” (RSPBZN), Kozloduy — a territorial structure of the Ministry of Interior. The condition in which the building is not in conformity with the requirements for energy efficiency under Ordinance 7 of 2004 on energy efficiency of buildings, as the building should have at least the energy consumption class “C” and at the time of the audit it has class “E”. The target group of the project is 10 people — employees of the RSPBZN. The implementation of the project aims to improve the energy efficiency of public buildings; the elimination of electricity losses; reduction of harmful emissions into the atmosphere.Expected results of the implementation of the project: — Improving the comfort of living in public buildings and achieving the statutory parameters of the environment for heating and lighting; — Optimisation of the budgetary costs resulting from the energy savings achieved by the implemented energy efficiency measures compared to those laid down for previous periods; — Extended service life of the public infrastructure and their installations and facilities; — Reduction of carbon emissions from public infrastructure.The main activities of the project are: Engineering (design, together with author’s supervision and construction); Construction supervision; Organisation and management of the project; Publicity and visualisation; Audit. (English) / qualifier
 
point in time: 2 December 2021
Timestamp+2021-12-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:44, 2 December 2021

Project Q3885499 in Bulgaria
Language Label Description Also known as
English
“Renewal and implementation of energy efficiency measures in the building of the District Office "Fire Safety and Protection of the Population" in Kozloduy
Project Q3885499 in Bulgaria

    Statements

    0 references
    145,248.35 Bulgarian lev
    0 references
    74,076.66 Euro
    1 December 2021
    0 references
    170,880.41 Bulgarian lev
    0 references
    87,149.01 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    21 September 2016
    0 references
    4 June 2019
    0 references
    Q3885492 (Deleted Item)
    0 references
    Проектът предвижда прилагане на мерки за енергийна ефективност на сграда общинска собственост, предоставена за безвъзмездно ползване на Районна служба "Пожарна безопасност и защита на населението" (РСПБЗН), гр. Козлодуй - териториална структура на Министерството на вътрешните работи. Състоянието, в което е сградата не съответства на изискванията за енергийна ефективност съгласно Наредба 7 от 2004 г. за енергийна ефективност на сгради, тъй като сградата би следвало да притежава най-малко клас на енергопотребление „С”, а към момента на обследване тя притежава клас „Е”.Целева група по проекта са 10 човека - служители на РСПБЗН.С реализирането на проекта се цели повишаването на енергийната ефективност на обществените сгради; премахването на загубите на електроенергия; намаляване на вредните емисии в атмосферата.Очаквани резултати от изпълнението на проекта: - Подобряване комфорта на обитаване в обществените сгради и постигане на нормативно определените параметри на средата за отопление и осветление; - Оптимизиране на бюджетните разходи, в резултат на постигнатите икономии на енергия от изпълнените енергоефективни мерки, спрямо нормативно определените за предходни периоди; - Удължен експлоатационен срок на публичната инфраструктура и на техните инсталации и съоръжения; - Намаляване на въглеродните емисии от публичната инфраструктура.Основните дейности по проекта са: Инженеринг (проектиране, заедно с авторски надзор и строителство); Строителен надзор; Организация и управление на проекта; Публичност и визуализация; Одит. (Bulgarian)
    0 references
    The project provides for the implementation of energy efficiency measures for the municipal property building, granted for free use to the District Office “Fire Safety and Protection of the Population” (RSPBZN), Kozloduy — a territorial structure of the Ministry of Interior. The condition in which the building is not in conformity with the requirements for energy efficiency under Ordinance 7 of 2004 on energy efficiency of buildings, as the building should have at least the energy consumption class “C” and at the time of the audit it has class “E”. The target group of the project is 10 people — employees of the RSPBZN. The implementation of the project aims to improve the energy efficiency of public buildings; the elimination of electricity losses; reduction of harmful emissions into the atmosphere.Expected results of the implementation of the project: — Improving the comfort of living in public buildings and achieving the statutory parameters of the environment for heating and lighting; — Optimisation of the budgetary costs resulting from the energy savings achieved by the implemented energy efficiency measures compared to those laid down for previous periods; — Extended service life of the public infrastructure and their installations and facilities; — Reduction of carbon emissions from public infrastructure.The main activities of the project are: Engineering (design, together with author’s supervision and construction); Construction supervision; Organisation and management of the project; Publicity and visualisation; Audit. (English)
    2 December 2021
    0 references
    Козлодуй
    0 references

    Identifiers

    BG16RFOP001-2.001-0082
    0 references