Rehabilitation of the railway line Plovdiv — Burgas, Phase 2 (Q3881400): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Changed label, description and/or aliases in en, and other parts: Adding en translations)
label / enlabel / en
 
Rehabilitation of the railway line Plovdiv — Burgas, Phase 2
Property / summary
 
The implementation of the project will rehabilitate/modernise the remaining unrenovated railway sections on the Plovdiv-Burgas line as follows: ØContinent 1-Design and construction of signalling and telecommunications systems along the Plovdiv-Burgas railway line — construction of: signalling in 18 stations; train control ETCS level 1; dispatching system in the Manole-Burgas section; GSM-R train communication system; installation of fiber optic cable;ØContinent 2-Construction of overpasses/underpasses for the railway line Plovdiv-Burgas on the site of existing level crossings-removal of level crossings and construction of overpasses;ØConponent 3-Construction of a protective forest in the between Chernograd-Aytos station to protect the railway from adverse weather influences; ØComponent 4-Rehabilitation of railway section Skutare-Orizovo-renewal of railway track, reconstruction of bridges, renewal of existing contact network and signaling in stations;ØContinent 5-Modernisation of railway section Rizovo — Mihaylovo — renewal and construction of railway and contact network, reconstruction of bridges, construction of tunnels, modernisation of HDV Chirpan, removal of level crossings, construction of overpasses and renewal of signalling in stations;ØKomponent 6-Modernisation of the railway section Yambol — Zimnitsa, at Zaturn station — construction of railway road incl. at Zaturn station, construction of bridges, renewal and construction of a new contact network;ØContinent 7-Reconstruction of the shooting development of Zimnitsa station and rehabilitation of the contact network in the stations of Zimnitsa and Straldzha — renewal of railway track, reconstructed track development of Zymnitsa station, renewal of contact network in the stations Zimnitsa and Straldzha, renewed alarm at Zimnitsa station;ØKomponent 8-Rehabilitation of the railway section Straldzha — Tserkovski — renewal of railway track.Detailed information is presented in B.3.1 in FC and Annex 1. (English)
Property / summary: The implementation of the project will rehabilitate/modernise the remaining unrenovated railway sections on the Plovdiv-Burgas line as follows: ØContinent 1-Design and construction of signalling and telecommunications systems along the Plovdiv-Burgas railway line — construction of: signalling in 18 stations; train control ETCS level 1; dispatching system in the Manole-Burgas section; GSM-R train communication system; installation of fiber optic cable;ØContinent 2-Construction of overpasses/underpasses for the railway line Plovdiv-Burgas on the site of existing level crossings-removal of level crossings and construction of overpasses;ØConponent 3-Construction of a protective forest in the between Chernograd-Aytos station to protect the railway from adverse weather influences; ØComponent 4-Rehabilitation of railway section Skutare-Orizovo-renewal of railway track, reconstruction of bridges, renewal of existing contact network and signaling in stations;ØContinent 5-Modernisation of railway section Rizovo — Mihaylovo — renewal and construction of railway and contact network, reconstruction of bridges, construction of tunnels, modernisation of HDV Chirpan, removal of level crossings, construction of overpasses and renewal of signalling in stations;ØKomponent 6-Modernisation of the railway section Yambol — Zimnitsa, at Zaturn station — construction of railway road incl. at Zaturn station, construction of bridges, renewal and construction of a new contact network;ØContinent 7-Reconstruction of the shooting development of Zimnitsa station and rehabilitation of the contact network in the stations of Zimnitsa and Straldzha — renewal of railway track, reconstructed track development of Zymnitsa station, renewal of contact network in the stations Zimnitsa and Straldzha, renewed alarm at Zimnitsa station;ØKomponent 8-Rehabilitation of the railway section Straldzha — Tserkovski — renewal of railway track.Detailed information is presented in B.3.1 in FC and Annex 1. (English) / rank
 
Normal rank
Property / summary: The implementation of the project will rehabilitate/modernise the remaining unrenovated railway sections on the Plovdiv-Burgas line as follows: ØContinent 1-Design and construction of signalling and telecommunications systems along the Plovdiv-Burgas railway line — construction of: signalling in 18 stations; train control ETCS level 1; dispatching system in the Manole-Burgas section; GSM-R train communication system; installation of fiber optic cable;ØContinent 2-Construction of overpasses/underpasses for the railway line Plovdiv-Burgas on the site of existing level crossings-removal of level crossings and construction of overpasses;ØConponent 3-Construction of a protective forest in the between Chernograd-Aytos station to protect the railway from adverse weather influences; ØComponent 4-Rehabilitation of railway section Skutare-Orizovo-renewal of railway track, reconstruction of bridges, renewal of existing contact network and signaling in stations;ØContinent 5-Modernisation of railway section Rizovo — Mihaylovo — renewal and construction of railway and contact network, reconstruction of bridges, construction of tunnels, modernisation of HDV Chirpan, removal of level crossings, construction of overpasses and renewal of signalling in stations;ØKomponent 6-Modernisation of the railway section Yambol — Zimnitsa, at Zaturn station — construction of railway road incl. at Zaturn station, construction of bridges, renewal and construction of a new contact network;ØContinent 7-Reconstruction of the shooting development of Zimnitsa station and rehabilitation of the contact network in the stations of Zimnitsa and Straldzha — renewal of railway track, reconstructed track development of Zymnitsa station, renewal of contact network in the stations Zimnitsa and Straldzha, renewed alarm at Zimnitsa station;ØKomponent 8-Rehabilitation of the railway section Straldzha — Tserkovski — renewal of railway track.Detailed information is presented in B.3.1 in FC and Annex 1. (English) / qualifier
 
point in time: 2 December 2021
Timestamp+2021-12-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:22, 2 December 2021

Project Q3881400 in Bulgaria
Language Label Description Also known as
English
Rehabilitation of the railway line Plovdiv — Burgas, Phase 2
Project Q3881400 in Bulgaria

    Statements

    0 references
    478,684,415.48 Bulgarian lev
    0 references
    244,129,051.89 Euro
    1 December 2021
    0 references
    675,092,693.08 Bulgarian lev
    0 references
    344,297,273.47 Euro
    1 December 2021
    0 references
    0.71 percent
    0 references
    1 February 2016
    0 references
    31 December 2022
    0 references
    0 references
    0 references
    С изпълнението на проекта ще бъдат рехабилитирани/модернизирани останалите необновени до момента жп участъци по линията Пловдив-Бургас, както следва: ØКомпонент 1-Проектиране и изграждане на системи за сигнализация и телекомуникации по железопътната линия Пловдив-Бургас –изграждане на: сигнализация в 18 гари; с-ма за влаков контрол ETCS, ниво 1; с-ма за диспечерска централизация в участъка Маноле-Бургас; с-ма за влакова комуникация GSM-R; полагане на оптичен кабел;ØКомпонент 2-Изграждане на надлези/подлези за железопътната линия Пловдив–Бургас на мястото на съществуващи прелези–премахване на жп прелези и изграждане на надлези;ØКомпонент 3-Изграждане на защитен лесопояс в междугарието Черноград-Айтос за защита на железния път от неблагоприятни атмосферни влияния; ØКомпонент 4-Рехабилитация на жп участък Скутаре–Оризово–подновяване на железен път, реконструиране на мостове, подновяване на съществуваща контактна мрежа и на сигнализация в гари;ØКомпонент 5-Модернизация на жп участък Оризово – Михайлово – подновяване и изграждане на железен път и контактна мрежа, реконструиране на мостове, изграждане на тунел,модернизация на ТПС Чирпан, премахване на жп прелези, изграждане на надлези и подновяване на сигнализация в гари;ØКомпонент 6-Модернизация на жп участък Ямбол – Зимница, при гара Завой - изграждане на железен път вкл.в гара Завой, изграждане на мостове, подновяване и изграждане на нова контактна мрежа;ØКомпонент 7-Реконструкция на стрелковото развитие на гара Зимница и рехабилитация на контактната мрежа в гарите Зимница и Стралджа – подновяване на железен път, реконструирано коловозно развитие на гара Зимница, подновяване на контактна мрежа в гарите Зимница и Стралджа, подновена сигнализация в гара Зимница;ØКомпонент 8-Рехабилитация на железопътната отсечка Стралджа – Церковски – подновяване на железен път.Детайлна информация е представена в т. B.3.1 в ФК и Annex 1. (Bulgarian)
    0 references
    The implementation of the project will rehabilitate/modernise the remaining unrenovated railway sections on the Plovdiv-Burgas line as follows: ØContinent 1-Design and construction of signalling and telecommunications systems along the Plovdiv-Burgas railway line — construction of: signalling in 18 stations; train control ETCS level 1; dispatching system in the Manole-Burgas section; GSM-R train communication system; installation of fiber optic cable;ØContinent 2-Construction of overpasses/underpasses for the railway line Plovdiv-Burgas on the site of existing level crossings-removal of level crossings and construction of overpasses;ØConponent 3-Construction of a protective forest in the between Chernograd-Aytos station to protect the railway from adverse weather influences; ØComponent 4-Rehabilitation of railway section Skutare-Orizovo-renewal of railway track, reconstruction of bridges, renewal of existing contact network and signaling in stations;ØContinent 5-Modernisation of railway section Rizovo — Mihaylovo — renewal and construction of railway and contact network, reconstruction of bridges, construction of tunnels, modernisation of HDV Chirpan, removal of level crossings, construction of overpasses and renewal of signalling in stations;ØKomponent 6-Modernisation of the railway section Yambol — Zimnitsa, at Zaturn station — construction of railway road incl. at Zaturn station, construction of bridges, renewal and construction of a new contact network;ØContinent 7-Reconstruction of the shooting development of Zimnitsa station and rehabilitation of the contact network in the stations of Zimnitsa and Straldzha — renewal of railway track, reconstructed track development of Zymnitsa station, renewal of contact network in the stations Zimnitsa and Straldzha, renewed alarm at Zimnitsa station;ØKomponent 8-Rehabilitation of the railway section Straldzha — Tserkovski — renewal of railway track.Detailed information is presented in B.3.1 in FC and Annex 1. (English)
    2 December 2021
    0 references
    Югоизточен
    0 references

    Identifiers

    BG16M1OP001-1.001-0003
    0 references