Construction of a photovoltaic farm with a total capacity of 0,5 MW – ZPW Pilchowo (Q137713): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Construction d’une ferme photovoltaïque d’une capacité totale de 0,5 MW — ZPW Pilchowo |
Revision as of 21:28, 2 December 2021
Project Q137713 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a photovoltaic farm with a total capacity of 0,5 MW – ZPW Pilchowo |
Project Q137713 in Poland |
Statements
1,578,830.4 zloty
0 references
1,857,447.54 zloty
0 references
85.0 percent
0 references
24 October 2016
0 references
31 October 2018
0 references
ZAKŁAD WODOCIĄGÓW I KANALIZACJI SP. Z O.O.
0 references
Na projekt składać się będą zadania: 1)Budowa farmy fotowoltaicznej w formule "zaprojektuj i wybuduj", 2)Nadzór nad budową, 3)Działania informacyjno-promocyjne. Zad. 1 polegać będzie na zaprojektowaniu, budowie, dostawie, montażu oraz przyłączeniu do krajowego systemu elektroenergetycznego farmy fotowoltaicznej o łącznej mocy 0,5 MW, wraz z uruchomieniem i uzyskaniem wymaganej dok. formalno-prawnej,niezbędnej do uruchomienia i eksploatacji farmy. Farma, zlokalizowana będzie w woj. zachodniopomorskim, gminie Szczecin, w m. Szczecin ul. Wodociągowa 5, nr dz. 1/4 w obrębie 2002 na terenie ZPW Pilchowo będącym własnością ZWiK Sp. z o.o. w Szczecinie. Do zadań wykonawcy należeć będzie: a) Opracowanie dok. projektowej i uzyskanie w imieniu Zamawiającego decyzji umożliwiającej realizacje inwestycji; b) Opracowanie projektów wykonawczych; c) Pełnienie nadzoru autorskiego; d) Przygotowanie terenu; e) Wykonanie robót budowlano-montażowych w tym montaż paneli fotowoltaicznych na stelażu wraz z dostawą niezbędnych materiałów i urządzeń oraz licencji oprogramowania, instalacji i konfiguracji; f) Dostawa lokalnej stacji pogodowej w specyfikacji niezbędnej do określania rzeczywistej produktywności farmy; g) przyłączenie do zintegrowanego systemem wizualizacji urządzeń gospodarki wodnej ZWiK Szczecin, pracującym na terenie Dyspozytorni ZPW Pomorzany oraz zarządzania i monitorowania systemu elektroenergetycznego; h) Wykonanie wszelkich prób i rozruchu instalacji fotowoltaicznej; i) Opracowanie dok. powykonawczej wraz z kompletną dok.opisującą kody źródłowe programowania aplikacji użytkowej do wizualizacji i sterowania – SCADA w sposób umożliwiający modyfikacje przez Zamawiającego; j) Uzyskanie prawomocnego pozwolenia na użytkowanie (w przypadku uzyskania Pozwolenia na Budowę) i pozostałych pozwoleń koniecznych do użytkowania zrealizowanych obiektów; k)Oddanie do użytkowania. Zad. 2 nadzór nad budową, zad. 3 działania informacyjno-promocyjne (opisane w pkt.D.4 (Polish)
0 references
The project will consist of tasks: 1)Building a photovoltaic farm in the formula “design and build”, 2)Construction over the construction, 3)Information and promotion activities. It’s the ass. 1 will consist of designing, constructing, supplying, assembling and connecting to the national electricity system a photovoltaic farm with a total capacity of 0.5 MW, with the commissioning and obtaining the required formal and legal doc, necessary for the start-up and operation of the farm. The farm will be located in the Zachodniopomorskie Voivodeship, the commune of Szczecin, in Szczecin Street. Water supply 5, no. 1/4 within 2002 in the PPW Pilchowo owned by ZWiK Sp. z o.o. in Szczecin. The tasks of the contractor will include: a) Developing the project doc and obtaining on behalf of the Ordering Party a decision enabling the realisation of the investment; B) Development of implementing projects; C) the completion of copyright supervision; d) Preparation of the site; e) Execution of construction and assembly works including installation of photovoltaic panels on a frame with the supply of necessary materials and equipment and software, installation and configuration licenses; the delivery of the local weather station in the specification necessary to determine the actual productivity of the farm; g) connection to the integrated system of visualisation of water management equipment ZWiK Szczecin, working in the premises of the Pomeranian ZPW dispatch office and the management and monitoring of the power system; carrying out any tests and commissioning of a photovoltaic installation; I) Development of the post-executive doc together with a complete doc describing the source codes for the programming of the application for visualisation and control – SCADA in a way that allows modification by the Employer; J) obtain a valid permit to use (in the event of obtaining a Construction Permit) and other permits necessary for the use of the completed facilities; K)Deposit to use. It’s the ass. 2 supervising the construction, ass. 3 information and promotion activities (described in point.D.4) (English)
21 October 2020
0 references
Identifiers
RPZP.02.10.00-32-A108/16
0 references