Construction of a photovoltaic installation up to 100 kWp for the needs of Voigt Promotion Sp. z o.o. (Q137689): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Construction d’une installation photovoltaïque jusqu’à 100 kWp pour les besoins de Voigt Promotion Sp. z o.o. |
Revision as of 21:27, 2 December 2021
Project Q137689 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a photovoltaic installation up to 100 kWp for the needs of Voigt Promotion Sp. z o.o. |
Project Q137689 in Poland |
Statements
433,244.99 zloty
0 references
509,700.0 zloty
0 references
85.0 percent
0 references
14 April 2016
0 references
9 July 2018
0 references
"VOIGT PROMOTION" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Projekt polega na budowie instalacji fotowoltaicznej, o mocy ok. 0,1 MW, z niezbędną infrastrukturą przyłączeniową, produkującej energię na potrzeby własne zakładu firmy Voigt Promotion Sp. z o.o. przy ul. Fabrycznej 37 w Policach. W ramach projektu na gruncie zamontowane zostaną panele fotowoltaiczne na stelażu. Powierzchnia terenu przeznaczonego pod instalację zajmuje - ok. 0,6 ha. Teren stanowi własność spółki i jest już ogrodzony, posiada dojazd, uzbrojenie oraz tereny komunikacyjne. Projektowana instalacja fotowoltaiczna będzie działać w systemie on-grid, jednak nie będzie ona oddawać wyprodukowanej energii do sieci. Zastosowany system PV będzie się składać z paneli fotowoltaicznych, sieciowego inwertera oraz miernika z przekładnikami prądowym. Miernik wraz z przekładnikami prądowymi zostanie umieszczony na linii zasilającej i będzie zliczać energię pobraną lub oddaną do sieci elektroenergetycznej. W momencie kiedy energia pobrana z sieci zacznie się zbliżać do wartości zero, miernik zapoda sygnał do inwertera, który ograniczy produkcję energii na panelach fotowoltaicznych. Pomiar energii odbywać się będzie w czasie rzeczywistym, a inwerter będzie miał ustawioną wartość 0W na energię oddaną do sieci, dlatego nie ma możliwości, aby jakakolwiek ilość wyprodukowanej energii z paneli PV, zostało oddane do sieci elektroenergetycznej. Zakres rzeczowy projektu obejmuje: 1. Wykonanie prac projektowych; 2. Realizacja prac budowlano-montażowych: 2.1 Przygotowanie terenu pod inwestycje (wycinak drzew i krzewów, niwelacja terenu, itp.); 2.2 Budowa instalacji fotowoltaicznej (panele – 364 szt., system mocowań, falownik – 3 szt., optymalizator – 182 szt., miernik, przekładnik, dodatkowy moduł RS, montaż instalacji, podłączenie do instalacji PPOŻ); 2.3 Położenie i przebudowa instalacji elektrycznej (instalacja elektryczna, ochrona przepięciowa, zabezpieczenia, rozdzielnica, łącza,itp.); 3. Pełnienie nadzoru autorskiego i technicznego. (Polish)
0 references
The project consists of the construction of a photovoltaic installation, with a power of approx. 0,1 MW, with the necessary connection infrastructure, producing energy for the own needs of Voigt Promotion Sp. z o.o.'s own plant at ul. Factory 37 in Police. As part of the project, photovoltaic panels on the frame will be installed on the ground. The area of the area intended for the installation occupies – approx. 0.6 ha. The area is owned by the company and is already fenced, has access, armament and communication areas. The designed photovoltaic installation will work in the on-grid system, but it will not transfer the produced energy to the grid. The PV system used will consist of photovoltaic panels, a network inverter and a meter with current converters. The meter together with the current transmitters will be placed on the power line and will count the energy taken or transferred to the power grid. As the energy from the grid begins to approach zero, the meter will generate a signal to the inverter, which will reduce energy production on photovoltaic panels. The energy measurement will take place in real time, and the inverter will have a value of 0 W per grid, so there is no possibility that any amount of energy produced from PV panels will be transferred to the power grid. The project’s material scope includes: 1. The execution of the design work; 2. Implementation of construction and assembly works: 2.1 Preparation of the site for investments (wood and shrub cutters, land levelling, etc.); 2.2 Construction of photovoltaic installation (panels – 364 pieces, mounting system, inverter – 3 pcs, optimiser – 182 pieces, meter, transducer, additional RS module, installation installation, connection to the PPOŻ installation); 2.3 Location and reconstruction of electrical installations (electrical installation, overvoltage protection, security, switchgear, connectors, etc.); 3. Carrying out copyright and technical supervision. (English)
21 October 2020
0 references
Identifiers
RPZP.02.10.00-32-A043/16
0 references