Investments in RES in the company Grzegorz Winiarek Zajazd “TUSINEK” (Q131923): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Investissements dans les SER dans l’entreprise Grzegorz Winiarek Zajazd «TUSINEK»

Revision as of 19:27, 2 December 2021

Project Q131923 in Poland
Language Label Description Also known as
English
Investments in RES in the company Grzegorz Winiarek Zajazd “TUSINEK”
Project Q131923 in Poland

    Statements

    0 references
    205,039.96 zloty
    0 references
    49,209.59 Euro
    13 January 2020
    0 references
    241,223.48 zloty
    0 references
    57,893.64 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    11 February 2017
    0 references
    31 March 2020
    0 references
    GRZEGORZ WINIAREK ZAJAZD "TUSINEK"
    0 references
    0 references

    53°28'56.6"N, 21°21'34.9"E
    0 references
    W ramach przedmiotowej aplikacji przewidywana jest budowa w miejscowości Rozogi 2 instalacji: 1. Instalacja 32,4 kW – ul. Rozogi - Kolonia 2, 12-114 Rozogi (działka: 523/14) Instalacja na gruncie. Projektowana instalacja składa się z 120 szt. polikrystalicznych paneli fotowoltaicznych o mocy 270 W, wyposażonych w optymalizatory mocy oraz inwerter. 2. Instalacja 11,88 kW – ul. Rozogi - Kolonia 2, 12-114 Rozogi (działka: 523/14) Instalacja na gruncie. Projektowana instalacja składa się z 44 szt. polikrystalicznych paneli fotowoltaicznych o mocy 270 W, wyposażonych w optymalizatory mocy oraz inwerter. Zadaniem projektowanej instalacji fotowoltaicznej jest wytworzenie energii elektrycznej o parametrach sieci elektroenergetycznej, a następnie zagospodarowanie jej w wewnętrznej instalacji elektrycznej przez odbiorcę. Etapy realizacji projektu: - złożenie wniosku o do?nansowanie - podpisanie umowy o do?nansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu sposób wdrażania projektu: - wybór wykonawcy zgodnie z zasadą konkurencyjności - podpisanie umowy z wykonawcą - montaż inwestycji - zakończenie projektu, podpisanie protokołu końcowego, płatność końcowa Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność ?rmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii (Polish)
    0 references
    As part of this application, the construction of an installation in Rozogi 2 is planned: 1. Installation 32.4 kW – ul. Rozogi – Cologne 2, 12-114 Rozogi (Monday: 523/14) Installation on the ground. The designed installation consists of 120 units of polycrystalline photovoltaic panels with a power output of 270 W, equipped with power optimisations and inverters. 2. Installation 11.88 kW – ul. Rozogi – Cologne 2, 12-114 Rozogi (Monday: 523/14) Installation on the ground. The designed installation consists of 44 units of polycrystalline photovoltaic panels with a power output of 270 W, equipped with power optimisations and inverters. The task of the designed photovoltaic installation is to generate electricity with the parameters of the electricity grid, and then to develop it in the internal electrical installation by the customer. Stages of project implementation: — submission of an application for funding – signing of a financing agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project method of implementation of the project: — selection of the contractor in accordance with the principle of competitiveness – signing of the contract with the contractor – assembly of the investment – completion of the project, signing of the final protocol, final payment The project is in line with the assumptions entered in the Polish Shoop by pursuing the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. As a result of the investment, energy consumption costs will fall (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.01.00-28-0308/17
    0 references