Commissioning of hybrid wind turbines production (Q123381): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Démarrage de la production d’éoliennes hybrides |
Revision as of 08:24, 2 December 2021
Project Q123381 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Commissioning of hybrid wind turbines production |
Project Q123381 in Poland |
Statements
1,480,275.0 zloty
0 references
3,289,500.0 zloty
0 references
45.0 percent
0 references
1 March 2017
0 references
31 March 2019
0 references
GATNER DARIUSZ FIRMA HANDLOWO-USŁUGOWA "DAREX"
0 references
Projekt zakłada wdrożenie do produkcji typoszeregu hybrydowych turbin wiatrowych w układzie szeregowym o osi poziomej (Polish)
0 references
The project assumes implementation for the production of hybrid wind turbines in serial system with horizontal axis (English)
21 October 2020
0 references
Identifiers
RPSL.03.02.00-24-0278/17
0 references