Comprehensive thermal modernisation of two public utility facilities in Strzegowo Municipality (Q108934): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Thermomodernisation complexe de deux bâtiments publics dans la municipalité de Strzegowo

Revision as of 10:39, 1 December 2021

Project Q108934 in Poland
Language Label Description Also known as
English
Comprehensive thermal modernisation of two public utility facilities in Strzegowo Municipality
Project Q108934 in Poland

    Statements

    0 references
    1,308,272.81 zloty
    0 references
    313,985.47 Euro
    13 January 2020
    0 references
    1,635,341.01 zloty
    0 references
    392,481.84 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    1 January 2016
    0 references
    30 September 2018
    0 references
    GMINA STRZEGOWO
    0 references

    52°53'37.0"N, 20°17'7.1"E
    0 references
    Projekt zakłada termomodernizacje 2 obiektów użyteczności publicznej na terenie Gminy Strzegowo. W ramach projektu zostały zastosowane usprawnienia pozwalające na znaczne ograniczenie energochłonności tych obiektów. Zastosowano min. 5 ulepszeń tak powiązanych ze sobą żeby uzyskać jak najlepszy efekt energetyczny przy zachowaniu opłacalności inwestycji. REDUKCJA CO2 DO ATMOSFERY WYNIESIE [budynek ZS-78%, budynek GB-96%] średnia 88%. OSZCZĘDNOŚCI ENERGII KOŃCOWEJ WYNOSZĄ [budynek ZS-74,14%, budynek GB-85,78%] średnia 79,96%. Projekt jest zgodny z gminnym Planem Gospodarki Niskoemisyjnej (PGN). Grupę docelową stanowią mieszkańcy Gminy. Celem projektu jest ograniczenie emisji CO2 do atmosfery poprzez zastosowanie OZE PANELE FOTOWOLTAICZNE wraz z kompleksową GŁĘBOKĄ termomodernizacją 2 obiektów należących do Gminy. Ulepszenia zastosowane w obiektach: ZESPÓŁ SZKÓŁ: SYSTEM GRZEWCZY Montaż zbiornika na gaz płynny, wykonanie instalacji gazowej, montaż kompaktowego układu kaskadowego dwóch gazowych kotłów kondensacyjnych ze sprzęgłem hydraulicznym. DOCIEPLENIE-STROPODACH Pow.:793,90m2 STOLARKA OKIENNA Wymiana na nową, Pow.:329,66m2 DOCIEPLENIE ŚCIAN ZEWNĘTRZNYCH Pow.:1877,00m2 WENTYLACJA MECHANICZNA Wykonanie instalacji wentylacji mechanicznej wraz z odzyskiem ciepła OZE FOTOWOLTAIKA zastosowanie instalacji fotowoltaicznej o mocy 10 kWp z wykorzystaniem paneli polikrystalicznych, moc 250 Wp, 40 szt.o pow. 70m2 WYMIANA OŚWIETLENIA NA ENERGOOSZCZĘDNE LED. BUDYNEK BIUROWO GOSPODARCZY: SYSTEM GRZEWCZY instalacji centralnego ogrzewania, montaż kotła spalającego pelet z podajnikiem opału, montaż nowej instalacji co wyposażonej w panelowe grzejniki z zaworami termostatycznymi. DRZWI WEJŚCIOWE Wymiana na nową, Pow.:2,40m2 BRAMA WEJŚCIOWA Wymiana na nową, Pow.:15,90m2 DOCIEPLENIE STROPODACH Pow.:397,70 m2 STOLARKA OKIENNA Wymiana na nową, Pow.:109,19m2 DOCIEPLENIE ŚCIAN ZEWNĘTRZNYCH Pow.:489,80m2˛ DOCIEPLENIE PODLOGI Pow.:348,50m2 WYMIANA OŚWIETLENIA NA ENERGOOSZCZĘDNE (Polish)
    0 references
    The project assumes thermomodernisation of 2 public utility facilities in the Strzegowo commune. Improvements have been made within the project to significantly reduce the energy intensity of these facilities. At least 5 improvements were applied in such a way as to achieve the best possible energy effect while maintaining the cost-effectiveness of the investment. CO2 reduction TO ATMOSFERY will be [building ZS-78 %, building GB-96 %] average 88 %. Final ENERGY savings are [building ZS-74.14 %, building GB-85.78 %] average 79,96 %. The project is in line with the Municipal Low-Emission Economy Plan (PGN). The target group consists of residents of the municipality. The aim of the project is to reduce CO2 emissions into the atmosphere by using FOTOLTAIC PANELE RES together with comprehensive thermal modernisation of 2 buildings belonging to the Municipality. Improvements used in objects: SCHOOL TEAM: Heating system Liquid gas tank assembly, gas installation, installation of a compact cascade system of two gas condensation boilers with hydraulic clutch. Warming-Stropods Areas:793,90 m² OKENNA STOLARY Replacement, Replacement:329,66 m² External PARTIES Warming Application:1877,00 m² MECHANICAL VENTICATION Manufacture of mechanical ventilation system with heat recovery of photovoltaic RES with 10 kWp power, 40 hp polycry panels. 70 m² Illuminations for energy-saving LEDs. ECONOMIC OFFICE BUILDING: Heating system of central heating system, installation of a boiler burning pellet with a fuel feeder, installation of a new installation equipped with panel radiators with thermostatic valves. Entrance door Replacement with new, Unit:2,40 m² entrance gate Replacement for new, Over:15,90 m² Warming of Stropodach Areas:397,70 m² OKENNA STOLARY Replacement, Replacement:109.19 m² Warming OPERATIONS OVERVIEWS WHITE:489,80 m² floor warming:348 m² floor warming (English)
    17 October 2020
    0 references

    Identifiers

    RPMA.04.02.00-14-4512/16
    0 references