Renewable energy sources for residents and public buildings in the commune of Iłów and Słubice. (Q108885): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Sources d’énergie renouvelables pour les résidents et les bâtiments publics dans les municipalités d’Iłów et de Słubice. |
Revision as of 10:39, 1 December 2021
Project Q108885 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Renewable energy sources for residents and public buildings in the commune of Iłów and Słubice. |
Project Q108885 in Poland |
Statements
5,374,168.47 zloty
0 references
6,717,710.59 zloty
0 references
80.0 percent
0 references
18 July 2016
0 references
31 May 2019
0 references
GMINA IŁÓW
0 references
Założenia: Zaprojektowanie i wybudowanie instalacji w zakresie OZE na terenie Gm.Iłów i Słubice.Wyposażenie 31 budynków użyteczności publ. i 101 indywidualnych gosp. domowych i rolnych w instalacje solarne, pompy ciepła i/lub ogniwa fotowoltaiczne. Min.u 20% użytkowników końcowych instalacja będzie składała się z co najmniej dwóch rodzajów OZE. Cele:zwiększenie udziału OZE w ogólnej produkcji en. elektr. i cieplnej na terenie Gm. Iłów i Słubice i ograniczenie emisji szkodliwych gazów do atmosfery. Budowa małych źródeł energii, zlokalizowanych w miejscu zamieszkania odbiorców, w celu zminimalizowania strat przemysłowych na etapie przesyłu, i w celu utrzymania korzystnego efektu ekologicznego, podniesienie świadomości ekologicznej.Zabezpieczenie mieszkańców Gmin przed występowaniem lokalnych niedoborów en. spowodowanych przerwami w dostawach en. elektr. i cieplnej z sieci gminnych. Zakres: budowa 21 instalacji solarnych w Gm.Iłów, 10 w Gm. Słubice, budowa 71 instalacji fotowoltaicznych w Gm. Iłów, 31 w Gm. Słubice, budowa 48 pomp ciepła w Gm. Iłów, 11 w Gm. Słubice. Podniesienie świadomości ekologicznej mieszkańców 101 gosp.domowych z gmin Iłów i Słubice w zakresie energii odnawialnej poprzez promocję projektu. Gr. docelowa: 71 gosp. domowe z terenu Gm. Iłów i 30 gosp. domowe z terenu Gm. Słubice. 21 budynków należących do Gm. Iłów i 10 do Gm.Słubice. Etapy: e. przygotowawczy-analiza ex ante posiadanej infrastruktury energetycznej i możliwości jej modernizacji, badanie popytu, audyt energetyczny, przygotowanie dok. przetargowej w trybie zaprojektuj i wybuduj, powołanie insp. nadzoru i kadry zarządzającej, promocja i informacja e.projektowania - uzyskanie pozwoleń, uzgodnienia z użytkownikami końcowymi i gestorami infrastruktury, zawarcie porozumienia z zakładami energetycznymi i ciepłowniami; nadzór e.wykonania-instalacja. dostawy, odtworzenia e.eksploatacji-usł.gwarancyjne i serwisowe, utrzymanie i konserwacja infrastruktury e.rozliczenia końcowego (Polish)
0 references
Assumptions: Design and construction of RES installations in the area of Gm.Iłów and Słubice.Equipment of 31 utility buildings publ. and 101 individual household and agricultural buildings with solar installations, heat pumps and/or photovoltaic cells. At least 20 % of end users will be equipped with at least two types of RES. Objectives: to increase the share of RES in the overall production of electricity and heat in Gm. Iłów and Słubice and to reduce emissions of harmful gases into the atmosphere. Construction of small energy sources, located in the place of residence of customers, in order to minimise industrial losses at the transmission stage, and to maintain a beneficial environmental effect, raise environmental awareness.Protect residents of Municipalities against local shortages caused by interruptions in supply of electricity and heat from municipal networks. Scope: construction of 21 solar installations in Gm.Iłów, 10 in Gm. Słubice, construction of 71 photovoltaic installations in Gm. Iłów, 31 in Gm. Słubice, construction of 48 heat pumps in Gm. Iłów, 11 in Gm. Słubice. Raising the environmental awareness of residents of 101 houses from the communes of Iłów and Słubice in the field of renewable energy through the promotion of the project. Target: 71 house houses from the area of Gm. Iłów and 30 house houses from the area of Gm. Słubice. 21 buildings belonging to Gm. Iłów and 10 to Gm.Słubice. Stages: e. preparatory-ex ante analysis of the existing energy infrastructure and the possibilities of its modernisation, testing of demand, energy audit, preparation of the tender dock in the form of design and construction, appointment of supervisors and management staff, promotion and information e. design – obtaining permits, agreement with end users and infrastructure Gestaurs, concluding an agreement with energy plants and heating plants; supervision of e.execution-installation. delivery, restoration e. operation-service and service, maintenance and maintenance of infrastructure e. final settlement (English)
17 October 2020
0 references
Identifiers
RPMA.04.01.00-14-6903/16
0 references