Improving the quality of medical services by adapting the building of the ZOZ MFA in Opole to the needs of diagnosis and treatment of musculoskeletal and musculoskeletal diseases and gynecology (Q86637): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Améliorer la qualité des services médicaux en adaptant la construction de l’hôpital SP ZOZ Ministère de WiA à Opole aux besoins de diagnostic et de traitement des maladies du système osseux-articulaire et musculaire et de la gynécologie

Revision as of 21:27, 30 November 2021

Project Q86637 in Poland
Language Label Description Also known as
English
Improving the quality of medical services by adapting the building of the ZOZ MFA in Opole to the needs of diagnosis and treatment of musculoskeletal and musculoskeletal diseases and gynecology
Project Q86637 in Poland

    Statements

    0 references
    0 references
    16,766,911.81 zloty
    0 references
    4,024,058.83 Euro
    13 January 2020
    0 references
    19,725,778.61 zloty
    0 references
    4,734,186.87 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    30 April 2019
    0 references
    SAMODZIELNY PUBLICZNY ZAKŁAD OPIEKI ZDROWOTNEJ MINISTERSTWA SPRAW WEWNĘTRZNYCH I ADMINISTRACJI W OPOLU
    0 references
    0 references

    50°40'43.7"N, 17°55'47.6"E
    0 references
    Zaplanowana do realizacji inwestycja obejmuje swoim zakresem: - przebudowę i nadbudowę V piętra budynku Szpitala z przeznaczeniem na blok operacyjny, - zakup aparatury, sprzętu medycznego i wyposażenia bloku operacyjnego, - przebudowę oddziałów: chirurgii ogólnej, chirurgii urazowo-ortopedycznej i ginekologii, - zakup wyrobów medycznych oraz wyposażenia na oddziały w ramach wymiany przestarzałej infrastruktury sprzętowej. (Polish)
    0 references
    The planned investment includes: — reconstruction and overbuilding of the fifth floor of the Hospital building for the operational block, – purchase of equipment, medical equipment and equipment of the operating unit, – reconstruction of branches: general surgery, trauma-orthopaedic surgery and gynecology – purchase of medical devices and equipment for branches as part of the replacement of outdated hardware infrastructure. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.09.02.00-00-0071/17
    0 references