Replenishment of water and sewage management in the Łochów Municipality (Q85508): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Compléter la gestion de l’eau et des eaux usées dans la municipalité de Łochów

Revision as of 20:55, 30 November 2021

Project Q85508 in Poland
Language Label Description Also known as
English
Replenishment of water and sewage management in the Łochów Municipality
Project Q85508 in Poland

    Statements

    0 references
    5,482,986.69 zloty
    0 references
    1,315,916.81 Euro
    13 January 2020
    0 references
    6,450,572.59 zloty
    0 references
    1,548,137.42 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 May 2015
    0 references
    31 December 2020
    0 references
    GMINA ŁOCHÓW
    0 references
    0 references

    52°31'49.4"N, 21°41'7.1"E
    0 references
    Inwestycja zlokalizowana w gminie Łochów, woj. mazowieckie, pow. węgrowski. Stopień skanalizowania Aglomeracji Łochów o RLM 10 001 - 94,65%. Inwestycja pozwoli na przyłączenie do sieci kan. 490 nowych mieszkańców. Dla osiągnięcia ww. celu oraz likwidacji niedoborów zaplanowano budowę 9,54 km sieci kan. san., 0,89 km sieci wodoc. oraz 3 przepomp. ścieków. Po realizacji stopień skanalizowania Aglomeracji wyniesie 99,55%. Zakres projektu (długości podane w przybliżeniu): 1) Budowa sieci kanalizacyjnej - oś. Węgrowska-BIS i Laskowska: 1370 m sieci graw., 153 m przył.; 2) Budowa sieci kanalizacyjnej w ulicach Nowowiejska, Polna i Olszowa w Łochowie: 703 m sieci graw., 103 m przył.; 3) Budowa sieci kanalizacyjnej - oś. Zatorze: 100 m sieci graw., 15 m przył.; 4) Budowa sieci kanalizacyjnej w ulicy Kwiatowej w Łochowie: 386 m sieci graw., 61 m przył.; 5) Budowa sieci kanalizacyjnej w ul. Sosnowa, 1-go Maja, Czereśniowa w Łochowie: 1221 m sieci graw.-tł., 1 przepomp., 116 m przył.; 6) Budowa sieci kanalizacyjnej wraz z pompownią w ul. Targowej w Łochowie: 163 m sieci graw., 77 m kanału tł., 1 pompownia, 1 m przył.; 7) Budowa sieci kanalizacyjnej w ul. Sienkiewicza w Łochowie: 229 m sieci graw., 136 m przył.; 8) Budowa sieci kanalizacyjnej wraz z przyłączami w Łopiance: 149 m sieci graw., 8 m przył.; 9) Budowa sieci kanalizacyjnej w ul. Nowowiejskiej w Łochowie: 1634 m sieci graw., 453 m kanału tł., 165 m przył., 1 przepomp.; 10) Budowa sieci wodociągowej w miejscowości Laski: 248 m kanałów graw.; 11) Budowa sieci kanalizacyjnej w ulicach Nasturcji, Konwaliowej, Jaśminowej, Polnych Kwiatów, Różanej, Zawilcowej: 900 m sieci graw., 278 m przył.; 12) Budowa sieci wodociągowej w ul. Sienkiewicza, Chopina, Sęczyka – 640 m sieci wodoc.; 13) Sieć kanalizacji sanitarnej w miejscowości Budziska: 1005 m sieci graw., 114 m przył.; 14) Zakup wartości niematerialnych i prawnych: system GIS i system monitoringu; 15) Zakup środków trwałych: instalacja fotowoltaiczna. (Polish)
    0 references
    The investment is located in Łochów commune, Mazowieckie Voivodeship, Węgrowski district. Degree of scanning of Elch Agglomeration with RLM 10 001-94.65 %. The investment will allow connection to the kan network. 490 new residents. The construction of 9.54 km of can. san., 0.89 km of water networks and 3 pumps of sewage is planned to achieve this objective and eliminate shortages. After completion, the degree of scanning of the Agglomeration will be 99.55 %. Scope of the project (lengths given approximately): 1) Construction of sewage network – axis. Węgrowska-BIS and Laskowska: 1370 m grav. net, 153 m d.; 2) Construction of sewage networks in the streets of Nowowiejska, Polna and Olszowa in Łochów: 703 m grav. net, 103 m d.; 3) Construction of sewage network – axis. Bay: 100 m grav. net, 15 m d.; 4) Construction of sewage network in Kwiatowa Street in Łochów: 386 m grav. net, 61 m d.; 5) Construction of sewage network in ul. Pine tree, May 1st, Chereśniowa in Łochów: 1221 m of grav-backed nets, 1 pumps, 116 m a.c.; 6) Construction of sewage network with pumping plant in ul. Fair in Łochów: 163 m gravitational network, 77 m background channel, 1 pumping room, 1 m al.; 7) Construction of sewage network in ul. Sienkiewicza in Łochów: 229 m grav. net, 136 m d.; 8) Construction of sewage network with connections in Lopianka: 149 m grav. net, 8 m d.; 9) Construction of sewage network in ul. Nowowiejska w Łochów: 1634 m gravitational net, 453 m background channel, 165 m above, 1 pumps; 10) Construction of the water supply network in Laski: 248 m of grav channels; 11) Construction of sewage network in the streets of nasturcja, Konwaliowa, Jaśminowa, Polnych Kwiatów, Różana, Zawilcowa: 900 m grav. net, 278 m d.; 12) Construction of a water supply network in ul. Sienkiewicz, Chopin, Sęczyk – 640 m of water network; 13) Sewerage network in Budziska: 1005 m grav. net, 114 m d.; 14) Purchase of intangible assets: GIS and monitoring system; 15) Purchase of fixed assets: photovoltaic installation. (English)
    15 October 2020
    0 references

    Identifiers

    POIS.02.03.00-00-0392/17
    0 references