Implementation of the production technology of improved harmonic filters integrated with oil transformers. (Q82298): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Mise en œuvre de la technologie pour la production de filtres harmoniques améliorés intégrés aux transformateurs d’huile.

Revision as of 14:56, 30 November 2021

Project Q82298 in Poland
Language Label Description Also known as
English
Implementation of the production technology of improved harmonic filters integrated with oil transformers.
Project Q82298 in Poland

    Statements

    0 references
    3,074,750.0 zloty
    0 references
    737,940.0 Euro
    13 January 2020
    0 references
    8,785,000.0 zloty
    0 references
    2,108,400.0 Euro
    13 January 2020
    0 references
    35.0 percent
    0 references
    1 October 2018
    0 references
    31 March 2021
    0 references
    ELHAND TRANSFORMATORY SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Projekt umożliwia wprowadzenie na rynek całkowicie nowych, innowacyjnych produktów powstałych w wyniku przeprowadzonych samodzielnie przez wnioskodawcę prac badawczo-rozwojowych. Nowymi produktami wprowadzonymi na rynek międzynarodowy dzięki realizacji projektu będą filtry harmonicznych zintegrowane z transformatorami olejowymi, zbudowane w oparciu o dławiki rdzeniowe i bezrdzeniowe, przeznaczone do pracy z przekształtnikami wielopulsowymi. Prace badawcze koncentrowały się na optymalizacji konstrukcji i gabarytów oraz optymalizacji doboru elementów pasywnych filtru poprzez eliminację impedancji szeregowej tradycyjnego filtru harmonicznych i zastąpieniu jej impedancją zintegrowanego z filtrem 12-to plusowego transformatora olejowego, stanowiącego nieodłączny element składowy układu napędowego dużej mocy. Na podstawie wyników symulacji obwodowych wykonano wiele obliczeń i kolejnych symulacji elektromagnetycznych oraz termicznych. Pozwoliły one zoptymalizować nowy produkt pod kątem uzyskania znacznie zwiększonej tłumienności wyższych harmonicznych przy jednoczesnym zmniejszeniu zużycia materiałów i potwierdziły zgodność wyników z założeniami projektowymi. Opracowane rozwiązanie stanowi nieopatentowaną wiedzę techniczną i jest własnością naszej firmy. Projekt koncentruje się na dwóch rodzajach działań, dzięki którym zostanie osiągnięty cel projektu: a) przeprowadzenie prac rozwojowych w okresie od 08/2018 do 12/2020, gdzie będą prowadzone prace B+R w zakresie projektowania całej rodziny filtrów harmonicznych zintegrowanych z transformatorami olejowymi; b) zakup środków trwałych, pozwalający na uruchomienie linii produkcyjnej innowacyjnego produktu. Termin realizacji 10/2018 – 03/2021. Zarówno do realizacji projektu, jak i do późniejszego wdrożenia produktu na rynek Wniosk nie musi uzyskać jakich. pozwoleń zezwoleń/koncesji. Wdroż. innow. produktu na rynek nastąpi już w kolej. kw. po zakoń. real. i projektu, tj. II kw. 2021.SA 42799(2015/X), art. 13 rozp.651/2014. (Polish)
    0 references
    The project enables the launch of completely new, innovative products resulting from research and development carried out independently by the applicant. New products introduced to the international market thanks to the project will be harmonic filters integrated with oil transformers, built on core and non-core chokes, designed to work with multipulse converters. The research focused on optimising the design and dimensions and optimising the selection of passive elements of the filter by eliminating serial impedance of a traditional harmonic filter and replacing it with impedance integrated into the 12-to-plus oil transformer, which is an integral component of the high power drive train. On the basis of the results of peripheral simulations, many calculations and subsequent electromagnetic and thermal simulations were performed. They have optimised the new product with a view to achieving significantly increased dampening of higher harmonics while reducing material consumption and confirmed the compatibility of the results with the design assumptions. The developed solution is a non-patented technical knowledge and is owned by our company. The project focuses on two types of activities to achieve the objective of the project: a) carrying out development work in the period 08/2018 to 12/2020 where R & D works will be carried out in the design of a whole family of harmonic filters integrated with oil transformers; the purchase of fixed assets enabling the production line of an innovative product to be launched. Completion date 10/2018-03/2021. Both for the implementation of the project and for the subsequent implementation of the product on the market, the application does not need to obtain what authorisation/concession permits. Implementation. Innovative product on the market will be already in turn. kw. after the end. real. and project, i.e. II sq. 2021.SA 42799(2015/X), Art. 13, Section 651/2014. (English)
    14 October 2020
    0 references

    Identifiers

    POIR.03.02.01-24-0007/18
    0 references