Reducing the energy intensity of the public building – House of Culture with Súp. No. 467 (Q3110726): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): L’isolation du boîtier extérieur sera réalisée par le système d’isolation de contact ETICS. Le système d’isolation sera constitué d’une combinaison de matériaux sélectionnés à partir des parties en solution thermique du toit provenant du point de résistance thermique et technique ainsi que du point de résistance aux intempéries basé sur l’audit énergétique ne remplit pas sa fonction. La plomberie et les plaques de grenier seront enlevées. Il est...)
(‎Changed label, description and/or aliases in de: translated_label)
label / delabel / de
 
Verringerung der Energieintensität des öffentlichen Gebäudes – Kulturhaus mit Súp. Nr. 467

Revision as of 23:07, 29 November 2021

Project Q3110726 in Slovakia
Language Label Description Also known as
English
Reducing the energy intensity of the public building – House of Culture with Súp. No. 467
Project Q3110726 in Slovakia

    Statements

    0 references
    174,065.52 Euro
    0 references
    204,782.96 Euro
    0 references
    85.0 percent
    0 references
    4 January 2017
    0 references
    7 January 2020
    0 references
    Obec Lietavská Lúčka
    0 references
    0 references

    49°7'45.77"N, 18°41'23.46"E
    0 references
    Zateplenie obvodového plášťa  bude realizované kontaktným zateplovacím systémom ETICS. Zatepļovací systém bude tvoriť kombinácia vybraných materiálov z hļadiska tepelnéRiešené časti strechy z hļadiska tepelno-technického ako aj z hļadiska odolnosti voči poveternostným vplyvom na základe hodnotení Energetického Auditu neplní svoju funkciu. Klampiarske oplechovanie a atikové oplechovania budú odstránené. Navrhnuté je kompletné odstránenie všetkých vrstiev strešného plášťa aţ po nosnú konštrukciu panel PZD, na ktoré bude uloţená nová skladba vrátane spádovej vrstvy.Pôvodné otvorové konštrukcie – drevené okná a dvere boli roku 2000 nahradené novými plastovými otvorovými konštrukciami s izolačným dvojsklom. Vzhļadom na to, že od tejto čiastočnej rekonštrukcie uplynulo 17 rokov a s ohļadom na súčasný stupeň netesnosti a jestvujúcich otvorových konštrukcií, opotrebovania kovaní a tesnení rámov je ich výmena nevyhnutná. navrhuje sa výmena za plastové okná a dvere s presklením izolačným trojsklom.V projekte sú navrhnuté odstránenie všetkých výplní s výnimkou dvojice presklených stien v zádverí. Navrhnutá je výmena za plastové okná s izolačným trojsklom s rovnakým otváraním a delením. Z titulu zateplenia budovy došlo k zmene rozmeru okien na východnej strane na 1.NP.Navrhnutá skladba strechy zodpovedá poţadovaným tepelnoizolačným požiadavkám, navrhnutá krytina zaručuje dokonalú tesnosť povrchu. Vrstvy strešného plášťa budú k podkladu kotvené mechaniky prostredníctvom teleskopických kotiev. Podļa hodnotení energetického auditu je dvojíca plynových kotlov s celkovým výkonom 96 kW technický zastaraná a vykazuje vysoký stupeň amortizácie. Táto zostava kotlov bude vymenená za 2 kotle 2x 35 kW. Bude vykonané hydraulické vyregulovanie na ústrednom kúrení so znížením teplotného spádu. Detailné parametre rieši projekt vykurovania.Budova má vyriešený bezbariérový prístup. (Slovak)
    0 references
    Insulation of the outer casing will be realised by contact insulation system ETICS. The insulation system will consist of a combination of selected materials from the thermal solution parts of the roof from the thermal and technical as well as from the weather resistance point based on Energy Audit does not fulfil its function. Plumbing and attic plates will be removed. It is designed to completely remove all layers of the roof covering up to the supporting structure of the PZD panel, on which a new composition will be placed, including the catchment layer.The original opening structures – wooden windows and doors were replaced by new plastic open structures with double glazing insulation in 2000. Due to the fact that 17 years have passed since this partial reconstruction and due to the current degree of leakage and existing opening structures, forging and sealing of the frames, their replacement is necessary. It is proposed to replace the plastic windows and doors with glazing triple glazing. In the project, the removal of all fillings are proposed, except for a pair of glazed walls in the vestibule. It is designed to replace plastic windows with insulating triple glazing with the same opening and division. Due to the insulation of the building there has been a change in the size of the windows on the east side on the 1st floor.The proposed composition of the roof corresponds to the required thermal insulation requirements, the design of the roof ensures perfect surface tightness. Layers of roofing will be anchored to the base of the mechanics through telescopic anchors. The evaluation of energy audit is a double gas boiler with a total output of 96 kW technical outdated and shows a high degree of amortisation. This boiler assembly will be exchanged for 2 boilers 2x 35 kW. Hydraulic control on central heating with reduction of temperature gradient will be performed. Detailed parameters are solved by the heating project.The building has solved barrier-free access. (English)
    28 September 2021
    0 references
    L’isolation du boîtier extérieur sera réalisée par le système d’isolation de contact ETICS. Le système d’isolation sera constitué d’une combinaison de matériaux sélectionnés à partir des parties en solution thermique du toit provenant du point de résistance thermique et technique ainsi que du point de résistance aux intempéries basé sur l’audit énergétique ne remplit pas sa fonction. La plomberie et les plaques de grenier seront enlevées. Il est conçu pour enlever complètement toutes les couches de la couverture du toit jusqu’à la structure de support du panneau PZD, sur lequel une nouvelle composition sera placée, y compris la couche de captage.Les structures d’ouverture d’origine — fenêtres et portes en bois ont été remplacées par de nouvelles structures ouvertes en plastique avec double vitrage isolant en 2000. En raison du fait que 17 ans se sont écoulés depuis cette reconstruction partielle et en raison du degré actuel de fuite et des structures d’ouverture existantes, de forger et d’étanchéité des cadres, leur remplacement est nécessaire. Il est proposé de remplacer les fenêtres et les portes en plastique par des vitrages triple vitrage. Dans le projet, l’enlèvement de tous les remplissages sont proposés, à l’exception d’une paire de murs vitrés dans le vestibule. Il est conçu pour remplacer les fenêtres en plastique par un triple vitrage isolant avec la même ouverture et division. En raison de l’isolation du bâtiment, il y a eu un changement de taille des fenêtres du côté est au 1er étage.La composition proposée du toit correspond aux exigences d’isolation thermique requises, la conception du toit assure une parfaite étanchéité de surface. Les couches de toiture seront ancrées à la base de la mécanique par des ancrages télescopiques. L’évaluation de l’audit énergétique est une chaudière à double gaz d’une puissance totale de 96 kW technique dépassée et montre un degré élevé d’amortissement. Cet ensemble de chaudières sera échangé contre 2 chaudières 2x 35 kW. Le contrôle hydraulique du chauffage central avec réduction du gradient de température sera effectué. Les paramètres détaillés sont résolus par le projet de chauffage.Le bâtiment a résolu l’accès sans barrière. (French)
    27 November 2021
    0 references

    Identifiers

    310041K652