Reduction of energy intensity in production halls 1-16 at SAM – SHIPBUILDING AND MACHINERY a.s. (Q3106214): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): L’objet du projet est de réduire l’intensité énergétique des halls de production no 1-16 dans la zone des anciens chantiers navals de Komárno situés dans la ville de Komárno. Les halls de production sont la propriété de SAM-SHIPBUILDING AND MACHINERY a.s. sont inscrits sur l’acte de propriété en tant que bâtiments industriels. Les halls produisent des composants soudés et en acier pour la construction et les machines routières — châssis, flèches...)
(‎Changed label, description and/or aliases in de: translated_label)
label / delabel / de
 
Reduzierung der Energieintensität in den Produktionshallen 1-16 bei SAM – SHIPBUILDING UND MACHINERY a.s.

Revision as of 22:19, 29 November 2021

Project Q3106214 in Slovakia
Language Label Description Also known as
English
Reduction of energy intensity in production halls 1-16 at SAM – SHIPBUILDING AND MACHINERY a.s.
Project Q3106214 in Slovakia

    Statements

    0 references
    439,452.65 Euro
    0 references
    1,289,264.27 Euro
    0 references
    34.09 percent
    0 references
    4 January 2021
    0 references
    3 January 2022
    0 references
    SAM - SHIPBUILDING AND MACHINERY a. s.
    0 references

    48°8'54.96"N, 17°6'27.90"E
    0 references
    Predmetom projektu je zníženie energetickej náročnosti výrobných hál č. 1-16 v areály bývalých Komárňanských lodeníc, nachádzajúcich sa v meste Komárno. Výrobné haly sú v majetku spoločnosti SAM-SHIPBUILDING AND MACHINERY a.s. sú zapísané na liste vlastníctva ako priemyselné budovy. V halách prebieha výroba zvárané a oceľové komponenty pre stavebné a cestné stroje – podvozkové rámy, výložníky, traverzy, pylóny a výrobu strojárskych komponentov pre rezacie stoly na ekologické spracovanie odpadu. Zároveň sa tu vykonáva výstavba a oprava lodí, t.j. slúžia aj ako suchý dok. Uvedené haly boli postavené v roku 1898. Projekt s zameriava na zlezenie svetelných podmienok v uvedených halách, ktoré povedú k zníženiu energetickej náročnosti. V tomto smere budú realizované dve aktivity: 1) výmena strešných svetlíkov a 1) rekonštrukcia osvetlenia. Prvá aktivita prinesie zmenu svetelných podmienok a zvýšenie využívania denného osvetlenia. Staré svetlíky z nízkou priehľadnosťou z drátkového skla budú vymenené za polykarbonátové so zvýšenou odolnosťou voči poveternostným vplyvom. Druhá aktivita prinesie demontáž starých svietidiel s ortuťovými výbojkami a ich náhradu za LED svietidlá so smart ovládaním. Vďaka tomu sa zníži nielen potrebný počet svietidiel, ale aj celková spotreba primárnych energetických zdrojov. Kým doteraz sa vždy musela rozsvietiť celá hala, aj keď bola využívaná len jej časť, po novom sa bude dať modulovať, koľko lámp sa zasvieti v závislosti od potreby. Tieto opatrenia prispejú k zníženiu energetickej náročnosti prevádzky priemyselných objektov. Naplnia sa tým ciele projektu: Znížiť energetickú náročnosť prevádzky znížením množstva spotrebovávaných primárnych energetických zdrojov. T.j. projekt prispeje k úsporám elektrickej energie ako primárneho energetického zdroja. Iné energetické zdroje nebudú realizáciou projektu zasiahnuté. (Slovak)
    0 references
    The object of the project is to reduce the energy intensity of production halls No. 1-16 in the area of former Komárno shipyards located in the town of Komárno. Production halls are owned by SAM-SHIPBUILDING AND MACHINERY a.s. are registered on the title deed as industrial buildings. The halls are producing welded and steel components for construction and road machinery – chassis frames, booms, transverses, pylons and the production of mechanical components for cutting tables for environmentally friendly waste treatment. At the same time, the construction and repair of ships is carried out, i.e. they also serve as a dry dock. These halls were built in 1898. The project aims at climbing the lighting conditions in the above-mentioned halls, which will lead to a reduction in energy intensity. Two activities will be carried out in this regard: 1) Rooflight replacement and 1) lighting renovation. The first activity will bring about a change in lighting conditions and an increase in the use of daylight. Old lights with low transparency made of door glass will be replaced with polycarbonate with increased weather resistance. The second activity will bring the dismantling of old mercury discharge lamps and their replacement for LED lights with smart control. This will reduce not only the necessary number of luminaires, but also the total consumption of primary energy sources. While the whole hall has always had to light up until now, even if only part of it has been used, it will be possible to modulate how many lamps light up depending on the need. These measures will contribute to reducing the energy intensity of the operation of industrial buildings. This will meet the objectives of the project: Reduce the energy intensity of the operation by reducing the amount of primary energy sources consumed. I.e. the project will contribute to saving electricity as a primary energy source. Other energy sources will not be affected by the implementation of the project. (English)
    28 September 2021
    0 references
    L’objet du projet est de réduire l’intensité énergétique des halls de production no 1-16 dans la zone des anciens chantiers navals de Komárno situés dans la ville de Komárno. Les halls de production sont la propriété de SAM-SHIPBUILDING AND MACHINERY a.s. sont inscrits sur l’acte de propriété en tant que bâtiments industriels. Les halls produisent des composants soudés et en acier pour la construction et les machines routières — châssis, flèches, transverses, pylônes et composants mécaniques pour le traitement des déchets respectueux de l’environnement. Dans le même temps, la construction et la réparation des navires sont effectuées, c’est-à-dire qu’ils servent également de cale sèche. Ces halls ont été construits en 1898. Le projet vise à escalader les conditions d’éclairage dans les salles susmentionnées, ce qui entraînera une réduction de l’intensité énergétique. Deux activités seront menées à cet égard: 1) remplacement du toit et 1) rénovation de l’éclairage. La première activité entraînera un changement des conditions d’éclairage et une augmentation de l’utilisation de la lumière du jour. Les vieilles lumières à faible transparence en verre de porte seront remplacées par du polycarbonate avec une résistance accrue aux intempéries. La deuxième activité apportera le démantèlement des vieilles lampes à décharge de mercure et leur remplacement pour les lampes LED par un contrôle intelligent. Cela réduira non seulement le nombre nécessaire de luminaires, mais aussi la consommation totale de sources d’énergie primaire. Bien que toute la salle ait toujours dû s’allumer jusqu’à présent, même si une partie seulement de celle-ci a été utilisée, il sera possible de moduler le nombre de lampes allumées en fonction des besoins. Ces mesures contribueront à réduire l’intensité énergétique de l’exploitation des bâtiments industriels. Cela permettra d’atteindre les objectifs du projet: Réduire l’intensité énergétique de l’opération en réduisant la quantité de sources d’énergie primaire consommées. C’est-à-dire que le projet contribuera à économiser l’électricité en tant que source d’énergie primaire. Les autres sources d’énergie ne seront pas affectées par la mise en œuvre du projet. (French)