Construction of a bridge mainland — Chyzh Island on connecting roads — 2nd design phase (Q2734680): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): L’objectif du projet est la construction du pont du continent-île de Ciovo avec des routes d’accès. La construction de ponts et de routes de raccordement permettra d’accélérer les flux de trafic, de réduire la congestion et de supprimer les goulets d’étranglement, de réduire les émissions nocives et d’accroître l’attrait touristique de la région. La durée prévue du projet est de 58 mois et sera mise en œuvre au cours de la période allant du 1.3....) |
(Changed label, description and/or aliases in de: translated_label) |
||
label / de | label / de | ||
Bau von Brückenland – Insel Ciovo in Trogir mit Verbindungsstraßen – 2. Projektphase |
Revision as of 20:15, 29 November 2021
Project Q2734680 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a bridge mainland — Chyzh Island on connecting roads — 2nd design phase |
Project Q2734680 in Croatia |
Statements
100,061,319.32 Croatian kuna
0 references
117,719,199.21 Croatian kuna
0 references
85.0 percent
0 references
11 June 2018
0 references
30 June 2020
0 references
Hrvatske ceste društvo s ograničenom odgovornošću, za upravljanje, građenje i održavanje državnih cesta
0 references
21220
0 references
Cilj projekta je izgradnja mosta kopno-Otok Čiovo sa pristupnim cestama. Izgradnja mosta i spojnih cesta dovest će do ubrzanja prometnih tokova, smanjenja zagušenosti i uklanjanja uskog grla, smanjenja štetnih emisija i povećane atraktivnosti regije u turističkom smislu. Planirano trajanje projekta je 58 mjeseci te će se provoditi u razdoblju 1.3.2015. do 31.12.2019. Ukupna vrijednost projekta procijenjena je na 137.084.613,68 kn. Prihvatljivi troškovi su 117.719.199,21 kn, od čega se 100.061.319,33 kn planira sufinancirati iz EFRR, a 17.657.879,88 kn iz Državnog proračuna RH. Neprihvatljivi izdaci iznose 19.365.414.47 kn i odnose se na iznos koji prelazi iznos predviđen za gradnju mosta i druge troškove radova koji nisu odobreni UDBS-om. (Croatian)
0 references
The aim of the project is to build a bridge between the Ascension Island and the accession roads. The construction of bridge and connecting roads will lead to speeding up traffic flows, reducing congestion and removing the bottleneck, reducing harmful emissions, and increasing the attractiveness of the tourism region. The planned duration of the project is 58 months and will be implemented in 1.3.2015-31.12.2019. The total value of the project was estimated at HRK 137.084.613,68. The eligible costs are HRK 117.719.199,21, of which HRK 100.061.319,33 is to be co-financed from the ERDF and HRK 17.657.879,88 from the Croatian State Budget. Ineligible expenditure is HRK 19.365.414.47 and refers to an amount exceeding the amount foreseen for the construction of a bridge and other costs of works not authorised to the UDBS. (English)
3 June 2021
0 references
L’objectif du projet est la construction du pont du continent-île de Ciovo avec des routes d’accès. La construction de ponts et de routes de raccordement permettra d’accélérer les flux de trafic, de réduire la congestion et de supprimer les goulets d’étranglement, de réduire les émissions nocives et d’accroître l’attrait touristique de la région. La durée prévue du projet est de 58 mois et sera mise en œuvre au cours de la période allant du 1.3.2015 au 31.12.2019. La valeur totale du projet est estimée à 137 084613,68 HRK. Les coûts éligibles s’élèvent à 117 719 199,21 HRK, dont 100 61.319,33 HRK devraient être cofinancés par le FEDER et 17 657 879,88 HRK par le budget de l’État de la République de Croatie. Les dépenses inéligibles s’élèvent à 19 365 414 47 HRK et concernent un montant supérieur au montant prévu pour la construction du pont et d’autres coûts de travaux non approuvés par les BUD. (French)
29 November 2021
0 references
Identifiers
KK.07.1.1.05.0001
0 references