Improvement of the water-utility infrastructure of Kaštel Trogir (Q2734645): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Le projet comprend la construction et la reconstruction d’un réseau public d’approvisionnement en eau; la construction et la reconstruction de systèmes publics de drainage; la mise à niveau du CUPOV existant à Divulje de 1 à 2 avec une capacité accrue de 40 000 ES à 100 000 ES; construction de UPOV Ciovo 2ème degré de purification d’une capacité de 25 000 ES; dans la zone des villes de Kaštela, Trogir, les municipalités de Seget et Okrug et les...) |
(Changed label, description and/or aliases in de: translated_label) |
||
label / de | label / de | ||
Verbesserung der wasserkommunalen Infrastruktur des Ballungsraums Kaštela-Trogir |
Revision as of 20:15, 29 November 2021
Project Q2734645 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of the water-utility infrastructure of Kaštel Trogir |
Project Q2734645 in Croatia |
Statements
803,222,768.51 Croatian kuna
0 references
1,151,030,595.12 Croatian kuna
0 references
85.0 percent
0 references
3 October 2019
0 references
31 December 2023
0 references
VODOVOD I KANALIZACIJA, društvo s ograničenom odgovornošću za vodoopskrbu, odvodnju i pročišćavanje otpadnih voda
0 references
21000
0 references
Projekt obuhvaća izgradnju i rekonstrukciju sustava javne vodoopskrbe; izgradnju i rekonstrukciju sustava javne odvodnje; dogradnju postojećeg CUPOV-a u Divuljama s 1. na 2. stupanj pročišćavanja uz povećanje kapaciteta sa 40.000 ES na 100.000 ES; izgradnju UPOV-a Čiovo 2. stupnja pročišćavanja kapaciteta 25.000 ES; na području gradova Kaštela, Trogira, općina Seget i Okrug te naselja (grad Split) s ciljem povećanja priključenosti stanovništva na javne sustave vodoopskrbe i odvodnje te osiguravanje odgovarajućeg pročišćavanja otpadnih voda. Ukupni troškovi Projekta iznose 1.438.788.243,9 mil. HRK, a od ukupno prihvatljivih troškova od 1.151.030.595,12 mil. HRK, oko 69,78 % odnosno 803.222.768,51 mil. HRK iznose EU bespovratna sredstva. (Croatian)
0 references
The project involves the construction and reconstruction of the public water supply system; the construction and reconstruction of the public drainage system; the upgrade of the existing CUC to Divoil from 1 to 2th purification step with an increase of capacity from 40.000 ES to 100.000 ES; building of the UPOV of 2 degrees treatment grades, 25.000 ES; in the area of the city of Kaštela, the Trogra, the Segam municipality and the District of that settlement (the City of Split), with the aim of increasing the population’s attention to public water supply and sanitation systems and ensuring adequate treatment of waste water. The total cost of the Project is 1.438.788.243,9 million. HRK, and of 1.151.030.595,12 million of the total eligible costs. At least 69.78 % and 803.222.768,51 million HRK, respectively. The amount of the EU grant is HRK. (English)
3 June 2021
0 references
Le projet comprend la construction et la reconstruction d’un réseau public d’approvisionnement en eau; la construction et la reconstruction de systèmes publics de drainage; la mise à niveau du CUPOV existant à Divulje de 1 à 2 avec une capacité accrue de 40 000 ES à 100 000 ES; construction de UPOV Ciovo 2ème degré de purification d’une capacité de 25 000 ES; dans la zone des villes de Kaštela, Trogir, les municipalités de Seget et Okrug et les agglomérations (ville de Split) dans le but d’accroître le raccordement de la population aux systèmes publics d’approvisionnement en eau et d’assainissement et d’assurer un traitement adéquat des eaux usées. Le coût total du projet s’élève à 1 438 788.243,9 millions. HRK, sur le total des coûts éligibles de 1.151,030,595,12 millions. HRK, d’environ 69,78 % et 803,222,768,51 millions, respectivement. HRK s’élève à des subventions de l’UE. (French)
29 November 2021
0 references
Identifiers
KK.06.4.2.38.0001
0 references